世界石油天然氣工業(yè)安全會(huì)議論課件_第1頁(yè)
世界石油天然氣工業(yè)安全會(huì)議論課件_第2頁(yè)
世界石油天然氣工業(yè)安全會(huì)議論課件_第3頁(yè)
世界石油天然氣工業(yè)安全會(huì)議論課件_第4頁(yè)
世界石油天然氣工業(yè)安全會(huì)議論課件_第5頁(yè)
已閱讀5頁(yè),還剩12頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、2021-5-4世界石油天然氣工業(yè)安全會(huì)議論1 Study on Safety in Treatment, Transportation and Injection of Carbon Dioxide in Jilin Oilfield China University of Petroleum (East China) 2010, 09 Shuren Liu The 3rd World Conference on Safety of Oil and Gas Industry 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論2 Contents Introduction Information o

2、f CO2 displacement in Jilin Oilfield Dehydration and Purification Safety Analysis Compression and Liquefaction Safety Analysis Transportation Safety Analysis Injection Safety Analysis Conclusions 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論3 Introduction CO2 is a greenhouse gas. Carbon capture and storage (CCS) is an eff

3、ective mean to mitigate CO2. - Weyburn project: Canada, first commercial example, started in 2000, inject 5000ton CO2/d, enhanced oil recovery by 16%. - Sleipner project: Norway, started in 1996, inject 2800ton/d 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論4 Introduction Weyburn projectSleipner project 2021-5-4世界石油天然氣工業(yè)安

4、全會(huì)議論5 Introduction CO2 capture, treatment, transportation and injection technologies attract interest. CO2 displacement in Jilin oilfield (China) started many years ago. - Matching technologies have been formed - Using natural associated CO2 for EOR is performing 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論6 Introduction

5、 This paper has focused on - Analyze safety problems and causes in treatment, transportation and injection of CO2 in Jilin oilfield - Put forward well-targeted, technically feasible and economically reasonable safety countermeasure suggestions 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論7 Information of CO2 Displacement

6、Figure 1 Procedure of the surface CO2 gathering and transporting system 1-Changshen 4 gas well 2-Gas gathering station 3-Dehydration unit 4-Liquefaction unit 5-Storage tank 6-Booster pump 7-8km pipeline 8-Injection station 9-Injection wells 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論8 Dehydration and Purification Safety

7、 Analysis Molecular sieve dehydration technology is used to dehydrate CO2 in Jilin oilfield Corrosion - Results leakage explosion and other accidents - Measures adding corrosion inhibitors coating on the adsorption tower 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論9 Hydrate - Results Limiting flow rate Reducing processin

8、g gas volume Blocking pipelines - Measures adding hydrate inhibitors increasing gas temperature Dehydration and Purification Safety Analysis 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論10 Low temperature and low pressure liquefaction technology is used in the CO2 liquefaction Jilin oilfield adopts the liquid ammonia refr

9、igerating machine system Compression and Liquefaction Safety Analysis 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論11 Leakage of liquid ammonia - Results poisoning burning or explosion - Measures inflammable gas detector dress Compression and Liquefaction Safety Analysis 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論12 Transportation Safety Anal

10、ysis 8km pipeline goes through residential areas, farmland and other areas of intensive human activities. Cause failure of pressure relief valve, bad sealing performance of welds, gaskets and valves, corrosion, external forces and so on 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論13 - Results Pipeline rupture Leakage - M

11、easures Automatic control system Mercaptan and other additives Transportation Safety Analysis 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論14 Injection Safety Analysis Leakage of carbon dioxide through injection well strings - Cement bond logging - Tracer - Ultrasonic detector Corrosion of injection strings - Multi-arm ca

12、liper - Electromagnetic thickness measurement tools - Underground imaging device - adding corrosion inhibition, using anti- corrosion steel pipe and coating of tubing 2021-5-4世界石油天然氣工業(yè)安全會(huì)議論15 Conclusions Analyzed the safety problems caused by CO2 phase change, such as CO2 corrosion, hydrate plugging, gas leakage Put forward effective measures to strengthen the safety of pipeline, station equipment, automatic control system and other aspects of management. 2021-5-4世界石油天然氣工業(yè)安全

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論