1、2, responsible for fire analysis and enter the tower, tanks of gas metering and analysis data reported to the authorities. 3, responsible for accident investigation, statistics and reporting work. 1 electrical safety responsibilities, conscientiously study and abide by the safety rules and regulatio

2、ns, in strict compliance with the prohibitions and provisions of safety, perform guard duties. 2, before the operation, wear appropriate ppe, implement security measures, issuing safety permits, inspection tools, instruments are in good condition. 3, any electrical appliance without inspection, shal

3、l be deemed to have access to electricity, is forbidden to touch. 4, electrical maintenance, you must stop, cut off power, and hang up the no close warning signs before they can work. 5, good job in electricity, maintenance records, easily lead to key parts of ongoing supervision and inspection of t

4、he accident. 1. safety advance teams and individuals, by the workshop (department) to fill in the security work incentive assessment report production technology section, approval approval of the company led by. 2. advanced shop by production technology section to complete the work of reward and pun

5、ishment assessment form, company leaders executed. 3. with regard to personnel and unit awards, presented by the workshop and team, the security sector review, reported that the companys leadership approved for implementation. v, annex 1, from the date of approval of the system implementation. secti

6、on i of the sixth chapter of carbon safety regulations on rewards and punishments discipline 1th late, leave early, absence from work, according to the department of business administration and the ministry of personnel issued the assessment methods perform. 2nd during the depressed, sleepy, found o

7、ne evaluation responsibility for 50 yuan. 3rd strictly comply with normal leave program while off duty and simulation system, no special circumstances non-compensatory time off and overtime compensation without permission and phone calls leave and so on. 4th pre-shift and post-shift system strictly,

8、 not routine leave that fails to participate, each assessment 30. 5th before i go to work not to drink, where to work after drinking, ordered to rest, treated as lay-off in this class. 6th during work to maintain a good state of mind, self and work-related things, offender assessment 20 yuan. no lac

9、k of concentration during the 7th stocktaking, to talk to others, engaged in work not related to stocktaking, found a check 30 yuan, in january found that more than two in a row, evaluation responsibility 100, charge 50 yuan. 8th rigid equipment patrol inspection system, inspection should be control

10、led within an hour or so of time, late or inspection are not serious, equipment defects not found in time, each assessment 30. 9th in the class go out without permission is strictly prohibited. failure to perform normal leave out, according to the time length of assessment 30 yuan, more than 30 minu

11、tes as truant. employee absenteeism, a deduction of wages this month 20%. chain gang during the 10th non-work, found gang assessment 30 yuan. 11th respect for青島一建集團有限公司施工方案嶗山區(qū)西韓居住區(qū)a2區(qū)v-4#、5#樓塔吊交叉作業(yè)方案批準:審核:編制:青島一建集團有限公司二一四年六月目 次1 工程概況12塔機的安裝狀況及作業(yè)環(huán)境13編制依據24危險源的辨識及分析25塔機安全防范的技術措施36塔機安全防范的管理措施57 塔機安全防范的

12、組織機構及管理職責6teachers, care workers. no finger-pointing at work, spat brawl, canceling parties all bonuses for the month. in severe cases, defence or public security authorities the 12th actively participate in group activities and voluntary work, without the participants, assessment of 50 yuan. 13th c

13、aring for public property, instruments, etc, if the price of the damage should be according to the deadline for compensation. after the 14th problem, defect inspection device discovery is not registered, not reported in a timely manner, each assessment 10. 15th when filling out two votes should be s

14、tandardized, serious, prompt and accurate, otherwise evaluation 10. article 16th worker without a ticket, do not stop, do not report on. assessment of 50 yuan. article 17th when work starts, not to the scene; no acceptance at the end, do not check, not control, work order without delay, the end is n

15、ot the end, and so on, depending on the seriousness of each evaluation 50-100. article 18th work incomplete registrations, tickets cancelled after the end of work, each . 43rd greenery of the grass, the flowers must be timely pruning, pesticide, if management cant keep up to cause flowers and barren

16、, except for rectification, a heads of evaluation units of 100 yuan. equipment management section iii comprehensive index assessment regime 44th equipment availability: main equipment availability because of poor management are not up to a good standard, each set of 200 yuan assessment task force pe

17、ople, head of head of 500 yuan, still not dealt with within the time specified in the authority, short of good standard double assessment. article 45th auxiliary equipment because of poor management are not up to a good standard (three devices) each set of 50 yuan assessment task force people, head

18、of head of 200 yuan, still not dealt with within the time specified in the authority, short of good standard double assessment. cause equipment damage accidents, health and technology carried out according to the safety assessment. article 46th equipment leak rate: production found a leakage point,

19、fails to appraisal of 20 yuan, put an end to a serious leak (refers to the need to shut down, stopping the leaks affecting the normal operation of the furnace), an assessment of 100 yuan, and deadlines. general indicators finished the examination belongs to the workshop of 300 yuan, workshop directo

20、rs assume 70%. 47th equipment defect elimination rates: equipment defect elimination rates monthly assessment, see defect management general index finished, assessment director performance 30/and equipment task force 10 yuan. 48th maintenance plan completion rate: fulfillment ratio of repair plan mo

21、nthly assessment, assessment criteria 100%, for no reason i didnt finish, each assessment workshop director of 200 yuan, 50 yuan, director of biotechnology and equipment task force 20 (if it is a repair issue must be agreed by the leaders of the company signed its). provisional duties assigned, fail

22、s to accept the assessment workshop leaders, 100 yuan (there is special reason to unit leaders to explain, consent), without special reasons, does not require the time to complete the assessment officer 1001 工程概況 青島市嶗山區(qū)西韓居住區(qū)a2區(qū)-4#、5#樓工程位于位于青島市株洲路以南,長沙路以北,九號路以東,張村河以西。該工程結構形式為砼剪力墻結構,12層為加強層,建筑總高度為45.8

23、5m,單體建筑總長度為34.08m,建筑總寬度為17.99m,總建筑建筑面積為13282.91,兩個單體樓層抗震設計為丙類建筑四級,抗震烈度六度設防,均為二級建筑,防火等級均為二級,結構設計耐久年限為50年。 該工程由青島市嶗山區(qū)中韓房地產開發(fā)中心開發(fā),青島志海工程設計咨詢有限公司設計,青島明天建設監(jiān)理有限公司監(jiān)理,青島一建集團有限公司承建。 為了滿足現(xiàn)場施工進度的要求,依據現(xiàn)場樁基布置圖及平面布置圖,擬安裝塔機2臺qtz31.5型塔機用于主體結構施工。塔機其主要性能如下表:樓號型 號最大起重 力 矩工作半徑最大附著高度最大起 重 量最大幅度起重量標準節(jié)高4#qtz31.536噸米3-30米9

24、0米3噸0.66噸2.2米5#qtz31.536噸米3-30米80米3噸0.66噸2.2米2塔機的安裝狀況及作業(yè)環(huán)境2.1塔機的安裝情況樓號型號承臺面高度首次安裝高度最終安裝高度安裝臂長兩塔相對距離其他塔中心距臂交叉4#qtz31.5-1.8米24.2米55米30米5#45米15米5#qtz31.5-1.8米22米55米30米4#45米15米2.2塔機的作業(yè)環(huán)境4#樓31.5塔機臂尖距西面圍墻約2米、塔身南側距居民約為10m,臂尖局北面小區(qū)約為5m。5#qtz31.5塔機臂尖距東面圍墻約3.5米、距辦公區(qū)約為4m,塔身距離南側居民區(qū)約為10m。本項目共安裝2臺塔機3編制依據3.1特種設備安全監(jiān)

25、察條例(國務院令第549號)3.2建筑起重機械安全監(jiān)督管理規(guī)定(建設部第166號令)3.3塔式起重機安全規(guī)程(國家質量監(jiān)督檢驗檢疫總局gb5144-2006)3.4危險性較大的分部分項工程安全管理辦法(住房和城鄉(xiāng)建設部建質【2009】87號3.5建筑施工塔式起重機安裝、使用、拆卸安全技術規(guī)程(住房和城鄉(xiāng)建設部jgj196-2010)3.6建筑施工安全檢查標準(jgj59-2011)3.7山東明威起重機械責任有限公司qtz31.5塔式起重機使用說明書、山東通用機械有限責任公司qtz31.5塔式起重機使用說明書4危險源的辨識及分析塔樓號危險源可能發(fā)生危險情形可能的事故后果主要防護措施4#塔機頂升作

26、業(yè)頂升時起重臂鋼絲繩或吊鉤被5#塔機回轉時碰撞折臂或倒塔1、4#塔先頂升,5#塔后頂升2、若4#塔后頂升時,5#塔需停用或避讓交叉作業(yè)鋼絲繩或吊鉤吊物與5#塔機的起重臂或拉桿發(fā)生碰撞1、設備結構部件受損2、鋼絲繩損壞3、墜物傷人1、遵守多塔交叉作業(yè)的避讓原則及小車退讓措施2、保證起升和回轉的制動裝置可靠臨空吊運小車吊鉤或吊物在東北面木工加工棚、南面居民區(qū)上空經過發(fā)生墜物傷人毀物1起重臂朝南面居住區(qū)方向回轉時設置限位并提示2起重臂朝西北木工加工區(qū)方向回轉時小車實行定向收幅3木工加工棚加設防護層4、居民區(qū)設置安全通道5#塔機交叉作業(yè)起重臂或拉桿與4#塔機的鋼絲繩或吊鉤吊物發(fā)生碰撞1、設備結構部件受

27、損2、鋼絲繩受損壞3、墜物傷人1、遵守多塔交叉作業(yè)的避讓原則及小車退讓措施2、保證起升和回轉的制動裝置可靠頂升作業(yè)頂升時起重臂被4#塔機回轉時碰撞折臂或倒塔1、4#塔先頂升,5#塔后頂升2、若4#塔后頂升時,5#塔需停用或避讓臨空吊運小車吊鉤或吊物在東南面鋼筋加工區(qū)、西北面木工加工棚和南面辦公區(qū)上空經過發(fā)生墜物傷人毀物1木工棚加設防護棚2鋼筋加工區(qū)設置防護棚3起重臂朝南面辦公區(qū)方向回轉時小車實行定向收幅所有交叉塔機突然停電突起大風起重臂或拉桿與交叉塔機的鋼絲繩或吊鉤吊物相碰1、設備結構部件受損2、鋼絲繩受損壞3、墜物傷人1、配備24v停電寶或24v直流蓄電池2、準備四塊木楔人工制動3、確?;剞D

28、制動機構可靠靈敏雨雪惡劣天氣停止作業(yè)后吊鉤與起重臂或拉桿相碰撞1、設備結構部件受損2、鋼絲繩受損壞3、墜物傷人塔機停止作業(yè)后將吊鉤收至上限位,小車停放在起重臂根部。避雷防雷觸電、電器系統(tǒng)燒毀觸電傷人依據國家規(guī)定塔機本身可以作為接閃器和引下線。因此保證駕駛室、整體結構有效連接,并設置有效地線。5塔機安全防范的技術措施5.1塔機共同采取的技術措施5.1.1由于4#樓qtz31.5塔機在升降節(jié)時,起重臂的加節(jié)方向在5#樓qtz31.5塔機的覆蓋范圍內,故4#塔頂升時,5#塔機必須停止使用或禁止回轉到與4#塔交叉的西半圈區(qū)域內。5.1.2由于5#樓qtz31.5塔機在升降節(jié)時,起重臂的加節(jié)方向在4#塔

29、機qtz31.5塔機的覆蓋范圍內,故5#塔頂升時,4#塔機必須停止使用或禁止回轉到與5#塔交叉的東半圈區(qū)域內。5.2.3操作司機必須嚴格遵守多塔作業(yè)的避讓原則:5.2.3.1低塔讓高塔的原則:處于低位的塔機應主動避讓處于高位的塔機。 5.2.3.2后塔讓先塔的原則:后進入交匯重合區(qū)域的塔機應避讓先進入交匯重合區(qū)域的塔機。 5.2.3.3動塔讓靜塔的原則:正在回轉運動的塔機應避讓回轉靜止不動的塔機。 5.2.3.4輕車讓重車的原則:輕載或空載塔機應避讓載有重物的塔機。 5.2.3.5客塔讓主塔的原則:起重臂回轉時需進入相臨塔機的主要施工區(qū)域時,應主動避讓該區(qū)域施工的塔機。5.2.4 操作司機應實

30、行回轉時對小車定向收幅的操作措施。當起重臂回轉到交叉重合區(qū)域前,先要將小車收回退出交叉的幅度,避免小車吊鉤吊物在交叉區(qū)內回轉。當起重臂到位停轉后,再將小車運行到指定位置。5.2.5 操作司機班前必須檢查使塔機隨時處于完好狀態(tài)。特別是安全裝置和起升和回轉的制動裝置。在該區(qū)域施工的塔機必須保證制動可靠,剎車靈敏。鋼絲繩無損壞和缺陷,小車吊鉤完好無缺損,運行靈活自如。5.2.6當回轉作業(yè)時突然停電,起重臂因慣性停不住,應立即開啟事先準備好的24v停電寶或24v直流蓄電池,即時恢復回轉制動線圈的供電,使回轉停穩(wěn)。然后用手操作慢慢松剎將吊物放下。5.2.7當起風時,回轉必須慢速運行。如果起重臂因大風停不

31、住,按回轉制動也停不穩(wěn)時,應將事先準備好的四塊木楔塞在回轉齒圈和小齒輪之間,阻止回轉運動。5.2.8停用或下班時,操作司機應將起升鋼絲繩收起到起重臂之下,小車收回到起重臂根部或收回退出交叉區(qū)域范圍。5.2.9塔機吊運時應盡量避免在鋼筋棚、木工棚等臨時設施上空經過。所有在塔機起重臂覆蓋范圍內的鋼筋棚、木工棚等臨時設施都必須加蓋防護層。5.3 4#樓塔機單獨采取的技術措施 木工加工棚有部分在4#樓塔機的覆蓋范圍內,因此操作時要避免在木工加工棚吊物經過。為防止墜物傷人,木工加工棚應搭設防護層。起重臂朝南面居住區(qū)方向回轉時設置限位并提示,防止吊鉤吊物碰撞建筑物。5.4 5#樓塔機單獨采取的技術措施 木

32、工加工棚和鋼筋加工棚有部分在5#樓塔機的覆蓋范圍內,因此操作時要避免在木工加工棚和鋼筋加工棚上空吊物經過。為防止墜物傷人,木工棚和鋼筋加工棚應搭設防護層?;剞D時對小車進行定向收幅,當塔機起重臂從辦公室上空回轉時,操作司機必須將變幅小車收回到距臂根25米內。6塔機安全防范的管理措施6.1塔機司機應選派具有相應上崗資格、責任心強,工作態(tài)度好,操作技能高,熟悉塔機的性能及有一定的經驗的人上崗。實行優(yōu)勝劣汰的用人機制,能者上,劣者下。6.2塔機司機上崗前必須進行安全作業(yè)交底,要根據本項目制定的安全防范措施,結合現(xiàn)場的實際情況,有針對性的交底,交底要履行簽字手續(xù)。6.3定期對塔機操作人員進行培訓和考核,

33、提高作業(yè)人員的安全技術素質。6.4督促切實做好對塔機的檢查,維修和保養(yǎng)工作6.4.1日常檢查由塔機機長和操作人員實施,檢查情況要記錄在臺班及交接班記錄中,重要情況要及時報修或報告。6.4.2安全部門在平時巡檢的基礎上,每月進行一次例行檢查,做好檢查記錄,對檢查出涉及安全危險的問題,必須下整改單,督促整改并進行復查。6.4.3對塔機的保養(yǎng)實行日常保養(yǎng)、一級保養(yǎng)和二級保養(yǎng)的制度。日常保養(yǎng)由操作人員完成任務,利用班前、班后和間隙時間作業(yè)。一級保養(yǎng)由機長負責按排完成,每月一次。二級保養(yǎng)由現(xiàn)場機電工長組織完成,每三個月一次。保養(yǎng)均要做好記錄,交有關部門備查。6.4.4對塔機的維修實行現(xiàn)場維修和基地修理的

34、制度,現(xiàn)場維修必須及時滿足施工需要,隨時保證塔機正常運行,基地修理必須全面徹底修復故障和毛病,恢復原有性能水平。維修和修理都要做好記錄,由有關人員簽字后備查。6.5塔機指揮人員應選派責任心強,有工作經驗,有上崗證的人專業(yè)指揮,指揮人員應佩戴明顯標志。用標準語音或手式指揮,使用對講機必須聲音洪亮、清晰,無干擾,不串臺。另外,指揮人員要對司索和吊斗、吊籠進行檢查監(jiān)控,確保起重吊運作業(yè)的安全。6.6加強對塔機的現(xiàn)場管理,安全合理用好塔機6.6.1控制作業(yè)時間,對節(jié)假日和加夜班進行合理安排和調度,防止設備和人員疲勞作業(yè)。同時每月安排適當?shù)臅r間對設備進行例行保養(yǎng)。6.6.2嚴格執(zhí)行塔機的安全技術操作規(guī)程

35、,塔吊的“十不吊”原則及多塔施工避讓原則。堅決制止盲目指揮和違章冒險作業(yè)。6.6.3對多塔施工塔機的安拆、頂升、附墻作業(yè)實行申報審批制度,由安裝單位申報,項目安全負責人審批并進行統(tǒng)一調度指揮,防止發(fā)生干擾和碰撞事故。同時要進行檢查驗證,確保加節(jié)后塔機的安全間距。6.6.4經常定期對塔機的作業(yè)進行安全檢查和監(jiān)督,發(fā)現(xiàn)問題及時糾正處理。 7 塔機安全防范的組織機構及管理職責7.1參建各方的組織機構圖表項目經理項目安全負責人勞務安全負責人工程總監(jiān)勞務經理塔機機組 塔機機電工長建設單位表7.1.17.2參建各方的管理職責7.2.1建設單位職責建設單位要對建設工程的安全質量負總責,全面督促其他參建各方抓

36、好安全質量工作,協(xié)調主持制定各方的安全職責,經常進行督促和檢查。接到監(jiān)理單位安全事故隱患的報告后,應立即責令有關單位停工整改。7.2.2監(jiān)理單位職責 7.2.2.1監(jiān)理單位要對現(xiàn)場塔機的安全負總的監(jiān)督責任,監(jiān)督執(zhí)行塔機的各項安全規(guī)程及本工程制定的塔機安裝、施工、拆卸及安全防護方案,全過程監(jiān)督塔機的基礎、安裝、加節(jié)附墻、拆卸及使用的安全。7.2.2.2審核建筑起重機械特種設備制造許可證,產品合格證,制造監(jiān)督檢驗證明,備案證明等文件; 7.2.2.3審核建筑起重機械安裝單位,使用單位的資質證書,安全生產許可證和特種作業(yè)人員的特種作業(yè)操作資格證書; 7.2.2.4審核建筑起重機械安裝,施工、拆卸及安全防護專項施工案; 7.2.2.5發(fā)現(xiàn)存在生產安全事故隱患的,應立即要求有關單位限期整改,對拖延拒不整改的,及時向建設單位報告。7.2.3項目經理部職責 7.2.3.1項目經理部即使用單位對塔機在現(xiàn)場的安全作業(yè)負主要責任,要認真執(zhí)行有關塔機的各項安全法規(guī)文件,并制定本單位塔機安全管理的實施辦法,對塔機租賃單位提出安全要求,根據不同的施工階段,周圍環(huán)境以及氣候

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論