1、evaluation of scientific development. nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. quality and efficiency-quality benefit is to adhere to the
3、enterprise "survival, profit and development" business truth, adhere to the "all activity is economic activity, all costs can be controlled, money should not be wasted" management philosophy, management analysis, to improve management quality, improve cost control capacity and ma
4、rket competitiveness. innovation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, stre
5、ngthening scientific and technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electric
6、ity at the core, enhance the operation of lean management to realize low consumption, high efficiency, reduce production costs. second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. harmoniou
7、s development of harmonious development-is to construct a "foreign" environment for development. "xing" refers to the "internal security firm and internal management of the internal management measures are effective, harmonious". "foreign currency" means "
8、;enterprise coordinating development of homeopathy, well, get along with the neighbors better." (b) xx 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. class of disorders 0, 0 is equivalent forced outage rate. no personal injury accident, materi
9、al and equipment accidents do not occur, no fire, no environmental pollution accident. enterprise integrated to achieve zero cases of violation, zero accidents, zero. quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kwh, total profits of 306.6 million yuan,
10、. bfs+、pi、mis、scm information systems infrastructure, fully integrated information system to realize information resources sharing; to expand the breadth and depth of the portal system, information system of enterprise management assistant role to play; to improve the day-to-day operation and mainte
11、nance operation record of promoting causes and transfer system; to strengthen the training常州市江邊污水處理廠提標改造工程 投標文件 - 技術(shù)標常州市江邊污水處理廠提標改造工程技術(shù)標投標單位:* 投標日期:二00八年七月十八一、 常州市江邊污水處理廠提標改造施工總說明1. 序言:非常感謝業(yè)主對我公司的信任,使我們有幸能夠參與常州市江邊污水處理廠提標改造工程的競標活動。通過對招標文件、圖紙和規(guī)范的學(xué)習(xí),我們深刻理解業(yè)主對工程進度、質(zhì)量和環(huán)境保護、節(jié)能降耗等方面的要求,我們完全同意并愿意嚴格遵守招標文件中的各
12、項規(guī)定。我們將堅持公平競爭的原則,以高度的責(zé)任心參與本次競標活動,并對目前或者將來與業(yè)主的合作深感榮幸。多年來我公司先后承建了 *;*;* 工程,積累了豐富的類似工程總承包施工經(jīng)驗,在業(yè)內(nèi)樹立了極高的聲譽。我們將本工程施工過程中貫徹iso9001-2000質(zhì)量保證模式,總結(jié)眾多獲獎工程的管理經(jīng)驗,揚長避短,充分發(fā)揮我公司的技術(shù)和管理優(yōu)勢,為業(yè)主提供質(zhì)量好、安全好、管理好、服務(wù)好、配合好、價格低的服務(wù)。施工組織設(shè)計是指導(dǎo)工程高速、優(yōu)質(zhì)、安全和文明完成的根本。為此,我公司特地組織了一流的技術(shù)人員對本工程技術(shù)標書進行思考、統(tǒng)籌和編寫。以招標文件、招標圖紙和業(yè)主提供的其他資料為基礎(chǔ),通過對現(xiàn)場的仔細踏
13、勘,我們了解了本工程的特點和重點,在標書中重點優(yōu)化了住宅建筑綜合施工技術(shù)、質(zhì)量管理、進度管理、安全文明施工、對內(nèi)對外的協(xié)調(diào)管理等方面的措施,確保技術(shù)標具有針對性、目的性、實際可操作性,使之成為指導(dǎo)工程施工、確保工程進度、質(zhì)量、安全、文明施工目標的綱領(lǐng)性文件。如果我們有幸中標,公司總部將在人員、機械、資金、材料供應(yīng)、技術(shù)保障等方面給予本工程最大的支持。我門必將全力以赴,發(fā)揮綜合實力、施工經(jīng)驗以及總包管理方面優(yōu)勢,以“寫所做的,做所寫的”為原則,貫徹和實施本技術(shù)標中所承諾的各項措施,力使工程造價最低,工期最快、質(zhì)量最優(yōu)、事故最少、現(xiàn)場最佳,為業(yè)主也為自己創(chuàng)造最好的經(jīng)濟效益和社會效益。以下章節(jié)中,我
14、們將對業(yè)主所關(guān)心的工程質(zhì)量、安全、進度、文明施工、總包管理以及回訪回修等方面做出我們的承諾,如果我公司有幸參與本工程施工,這些承諾都將作為合同的一部分,做為業(yè)主監(jiān)督和考核我們的依據(jù),如果未能實現(xiàn)本標書所做出的承諾,我公司愿意無條件接受業(yè)主的經(jīng)濟處罰。2. 工程概況2.1 工程基本情況 工程名稱:常州市江邊污水處理廠提標改造工程 建設(shè)單位:常州市深水江邊污水處理有限公司 設(shè)計單位:上海市政工程設(shè)計研究總院施工單位:* 工程簡況:常州市江邊污水處理廠提標改造是由常州市深水江邊污水處理有限公司投資開發(fā)建設(shè)的20萬噸/日提標改造工程。本次招標范圍為常州市江邊污水處理廠提標改造工程,包括反沖洗廢液池、加
15、藥間、紫外線消毒池、提升泵房、配電間、高效沉淀池、均質(zhì)濾料濾池、改造生物反應(yīng)池及設(shè)備等提標改造。建筑用地面積2.25公頃。施工現(xiàn)場范圍內(nèi)的三通一平已基本完成,進場道路已經(jīng)完成,具備施工條件。業(yè)主提供水供電目前已經(jīng)到位。主要構(gòu)筑物一覽表序號升級改造擴建工程尺寸升級改造擴建內(nèi)容1粗格柵10.2*11.8m2擴建工程增加設(shè)備2進水泵房Ø20.0 m擴建工程增加設(shè)備3脫水機房64.0*22.8 m2擴建工程增加設(shè)備4鼓風(fēng)機房54.0*16.3m2擴建工程增加設(shè)備5紫外線消毒池10.9*10.0m2升級改造6污泥儲罐Ø5.0 m升級改造7配電間30.8*7.8m2升級改造8提升泵房1
16、1*11.5m2升級改造9高效沉淀池70.6*43.6m2升級改造10均質(zhì)濾料濾池74.43*51.86m2升級改造11反沖洗廢液池14.0*8.0m2升級改造12加藥間19.34*12.0m2升級改造3. 標函編制范圍和依據(jù)3.1 投標范圍本工程所包含的工作內(nèi)容如下:(1)現(xiàn)場清理及清障;(2)反沖洗廢液池、加藥間、紫外線消毒池、提升泵房、配電間、高效沉淀池、均質(zhì)濾料濾池、改造生物反應(yīng)池及設(shè)備等提標改造。(3)總平面圖上標明的主要構(gòu)筑物一覽表標明的工作內(nèi)容。(4)結(jié)構(gòu)工程中所需的水電管道、機電預(yù)埋管(洞)等,以及管道預(yù)埋和接地等工作的配合。(5)招標文件規(guī)定的其他需要中標單位完成的工作。3.
17、2 投標依據(jù)(1)招標文件及招標圖紙;(2)招標技術(shù)規(guī)范;(3)招投標答疑文件;(4)現(xiàn)場踏勘情況;(5)常州市政府現(xiàn)行的有關(guān)安全、文明施工的各項法規(guī)和規(guī)定;(6)國家及常州市地區(qū)現(xiàn)行技術(shù)、質(zhì)量標準,施工規(guī)范和規(guī)定;(7)招標技術(shù)規(guī)范中明確規(guī)定需要采用的國家或國際技術(shù)規(guī)范、標準。4. 工程目標和承諾4.1 總包項目管理公司誠懇地表示:我們完全接受并愿意遵守招標文件規(guī)定的的有關(guān)工程承包工作范圍、承包方式、施工工期、技術(shù)規(guī)范以及總承包協(xié)調(diào)管理、安全文明施工方面的各項要求,我們將落實各項方案和措施,履行總承包的權(quán)利和義務(wù),協(xié)調(diào)和管理好各參建單位,與業(yè)主現(xiàn)場工程師、建筑師、監(jiān)理工程師等有關(guān)各方一起共同
18、高速、優(yōu)質(zhì)的完成常州市江邊污水處理廠提標改造工程(以下簡稱本工程)的建設(shè)。我們將委派以建設(shè)部一級項目經(jīng)理(*,簡歷附后),高級工程師為首的總承包項目部,在總承包管理的過程中,項目經(jīng)理以及各管理人員均常駐現(xiàn)場,不掛名不兼職,兢兢業(yè)業(yè)協(xié)調(diào)、處理、管理好方方面面的問題;同時積極配合業(yè)主作好各類專業(yè)分包商的選定工作,全面作好對專業(yè)分包的管理、協(xié)調(diào)、配合工作,同時抓好對分包商施工質(zhì)量、工期、安全、文明施工管理工作,確保本工程優(yōu)質(zhì)、快速地全面建成。4.2 工程質(zhì)量目標我們將按照iso9001-2000質(zhì)量保證體系模式進行工程質(zhì)量管理,嚴格執(zhí)行國家行業(yè)技術(shù)質(zhì)量規(guī)范,遵守工程設(shè)計圖紙和技術(shù)規(guī)范規(guī)定,履行總承包
19、的權(quán)力和義務(wù),確保本工程一次性驗收合格率100。4.3 工程工期我們將針對性地制定詳細地技術(shù)措施、組織措施、管理措施來保障工程施工進度,保證在134天內(nèi)全面完成本工程。4.4 文明施工和安全生產(chǎn)我公司將嚴格按照中國常州市政府有關(guān)建筑工程施工現(xiàn)場標準化管理規(guī)定組織文明施工,確保達到區(qū)級“文明標化工地”。我們將嚴格執(zhí)行中國國家和常州市市有關(guān)安全生產(chǎn)的法規(guī)法令,執(zhí)行中華人民共和國安全生產(chǎn)法,實行施工全過程的安全監(jiān)控,確保工程施工過程中重大安全事故、重大火災(zāi)事故和刑事案件為零。若本公司由于自身的原因為能完成上述文明施工和安全生產(chǎn)目標,愿意接受業(yè)主對我單位合同規(guī)定的扣罰。4.5 施工技術(shù)我們將配備以高級
20、工程師為首,一流的技術(shù)人員組成的技術(shù)力量為本工程服務(wù),我們承諾這些技術(shù)人員均常駐現(xiàn)場,無掛名和兼職現(xiàn)象。我們將運用現(xiàn)進的施工技術(shù)以提高工效和質(zhì)量。對于特殊的、困難的工序,編制專門的施工方案并遞交業(yè)主和建筑師審批,這些方案主要包括: 樁基礎(chǔ)施工方案 拉森鋼板樁方案 底板澆筑和養(yǎng)護技術(shù)方案 地下室結(jié)構(gòu)防裂縫、防滲漏方案 建筑定位和垂直度控制技術(shù)方案 耐酸環(huán)氧砂漿地坪方案 樓層內(nèi)預(yù)埋件方案 屋面防水方案 安裝專項施工方案 其它需要做的方案4.6 工程回訪、保修回訪和保修嚴格執(zhí)行國務(wù)院第279號令房屋建筑工程質(zhì)量保修辦法以及招標文件的有關(guān)規(guī)定。我們的專業(yè)保修隊伍將隨叫隨到,并在臺風(fēng)、暴雨或其他自然災(zāi)害
21、發(fā)生后主動上門進行檢查、維修或者保養(yǎng),堅持把業(yè)主的利益放在第一位。主要分項工程的保修期限,分別為:主體結(jié)構(gòu)的保修期為設(shè)計文件規(guī)定的工程合理使用年限;防水工程、防滲漏項目保修期為10年;供熱和供冷系統(tǒng)保修期為2年;電氣管線、給排水管道、設(shè)備安裝工程保修2年;裝修工程保修2年;其他項目保修期限將和業(yè)主約定。4.7業(yè)主普遍關(guān)心的其他承諾總承包將全面加強對工程環(huán)保、技術(shù)、質(zhì)量、安全的控制。在此,我們就眾多業(yè)主所普遍關(guān)心的一些問題做以下承諾,這些承諾將作為合同的一部分: 地下地上設(shè)施、建筑、管線的監(jiān)測、加固和保護:我們承諾在工程施工的過程中不會出現(xiàn)管線、建筑或其他設(shè)施過度下沉、開裂、位移或爆管等現(xiàn)象。
22、確保工程材料構(gòu)件、機械順利進場;確保周邊道路的通暢和安全。確保周邊社區(qū)的環(huán)境整潔。 嚴格按照iso9001-2000標準進行原材料及設(shè)備采購質(zhì)量的管理工作(包括業(yè)主提供的產(chǎn)品)。所有用于現(xiàn)場的原材料、半成品、成品以及設(shè)備均提供有效的出廠報告、質(zhì)量保證書和相關(guān)的測試報告,并在使用前遞交設(shè)計、業(yè)主和監(jiān)理審閱,通過后方用于現(xiàn)場。 地下室底板、混凝土外墻結(jié)構(gòu)不出現(xiàn)有害裂縫和滲漏水現(xiàn)象。 框架填充墻不出現(xiàn)裂縫和滲水現(xiàn)象。 杜絕屋面、有防水要求的盥洗室、衛(wèi)生間等出現(xiàn)滲漏水現(xiàn)象。 確保樓層標高誤差不超過5mm,垂直度誤差不超過110000。 確保安裝工程設(shè)備進行正常,保證各單體能正常發(fā)揮功能。 配備專業(yè)工程
23、師對業(yè)主指定分包的專業(yè)系統(tǒng)工程進行對口管理,對其方案、質(zhì)量、進度進行全方位控制。 配備業(yè)主對各單體工程調(diào)試和正常進行,并培訓(xùn)部份專業(yè)人員操作。二、 施工策劃1. 工程交接和施工準備1.1 工程交接進場后,我們將及時組織與業(yè)主單位進行工程交接工作,這些工作包括但不僅限于: 工程軸線和標高控制基準點的移交、復(fù)核; 沉降觀測等測量資料的交接; 地質(zhì)勘探資料移交; 工程施工界面移交; 必要的已完工程質(zhì)量檢驗、統(tǒng)計檢驗數(shù)據(jù); 對可能存在的工程缺陷處理的責(zé)任分配協(xié)調(diào); 和業(yè)主、建筑師、現(xiàn)場監(jiān)理的前期協(xié)調(diào); 對擴建工程增加設(shè)備,對原有設(shè)備的保護和移交。 對升級改造工程,對原有地下管線的保護。 現(xiàn)場已有設(shè)施的
24、移交工作(臨時用水用電)。1.2 施工準備施工準備主要包括施工許可證、現(xiàn)場、人力、設(shè)備、材料和技術(shù)幾個方面,計劃為15個工作日。(1)施工許可證:加大協(xié)調(diào)的力度,在15日內(nèi)辦妥施工許可證。(2)現(xiàn)場準備期定為10個工作日,主要包括以下內(nèi)容: 完善現(xiàn)場臨時施工道路及排水排污系統(tǒng); 完成辦公設(shè)施的移交工作,為業(yè)主和監(jiān)理辦公室接通電話、采購辦公桌椅等辦公設(shè)備; 做好現(xiàn)場大門圍墻的搭建和美化工作,劃分堆場位置,搭建鋼筋棚、木工棚及機、電、修等生產(chǎn)用房; 接通施工供電、供水、排水系統(tǒng),安裝電箱、照明器具;(3)技術(shù)準備技術(shù)準備期為10個工作日,包括但不限于以下內(nèi)容:做好與常州市相關(guān)政府管理部門的協(xié)調(diào)工作
25、,辦好各類必須的施工手續(xù),尤其是材料和構(gòu)件運輸車輛的通行證等重要手續(xù);復(fù)核水準原點及軸線定位基準點,引測現(xiàn)場施工所需的高程控制基準點、軸線控制網(wǎng);完成施工組織設(shè)計、管理質(zhì)量計劃以及環(huán)境保護等方案的編制工作。熟悉地質(zhì)資料和圍護方案,必要時對現(xiàn)場進行重新勘探;對擴建工程加大結(jié)構(gòu)建設(shè)。在確保安全的前提下做好基礎(chǔ)施工,并做好圍護方案。做好材料采購、運輸和供應(yīng)計劃;組織設(shè)計標準、施工規(guī)范、質(zhì)量標準、施工組織設(shè)計、質(zhì)量計劃、各類施工方案的培訓(xùn)和學(xué)習(xí);對操作人員進行技術(shù)、安全交底;詳細對工程周邊的地下地上設(shè)施、建筑和道路情況進行深入調(diào)查,制定地下地上設(shè)施和建筑、道路交通的監(jiān)測、加固和保護方案,制定交通組織方
26、案。(4)人力、設(shè)備和材料供應(yīng)準備:包括但不限于以下內(nèi)容:對材料供應(yīng)商的的技術(shù)、管理、質(zhì)量檢測和售后服務(wù)等質(zhì)量保證能力信譽進行調(diào)查,并對其產(chǎn)品進行實際檢驗;確定材料供應(yīng)計劃;施工常用物資,如辦公用具,測量定位儀器,消防器材等一周內(nèi)進場。對擬選擇的分包商的技術(shù)管理實力、特殊及主體工種人員資格、施工經(jīng)驗進行綜合評價,選擇、確定可靠的勞動隊伍。2. 施工區(qū)域劃分和流向說明2.1 施工階段說明根據(jù)不同階段施工內(nèi)容的不同,我們將本工程各棟樓主要分為三大部分,各階段的施工時間、工作內(nèi)容或主要施工節(jié)點如下表所示:各施工階段主要工程內(nèi)容施工階段主要工作內(nèi)容或進度節(jié)點準備階段辦理各類手續(xù)、搭建臨設(shè)、三通一平、方
27、案編制和審批、技術(shù)交底、人料機的準備和進場等主體施工階段樁基、圍護、基礎(chǔ)、主體結(jié)構(gòu)施工,穿插進行管線預(yù)埋、二結(jié)構(gòu)和粗裝飾等工作。設(shè)備安裝階段綜合機電、消防、弱電、開洞預(yù)埋、設(shè)備安裝調(diào)試等指定專業(yè)分包工程。擴建工程增加設(shè)備設(shè)備安裝調(diào)試竣工驗收3. 施工組織3.1 土建和指定分包商的工作協(xié)調(diào)本工程指定分包較多,包括裝飾、弱電系統(tǒng)、消防報警系統(tǒng)、市政,供電工程、大型設(shè)備安裝調(diào)試(提升泵)等等,這些工程與土建、二結(jié)構(gòu)、粗裝飾之間,必將存在交叉施工和施工矛盾。為了保證施工進度,避免交叉施工影響,總承包將在盡力為各分包商提供幫助和服務(wù)的基礎(chǔ)上,加強他們之間的協(xié)調(diào)管理工作,主要手段如下: 技術(shù)協(xié)調(diào)方面:總承
28、包成立由總工程師領(lǐng)銜的技術(shù)協(xié)調(diào)小組,負責(zé)各專業(yè)的技術(shù)協(xié)調(diào)工作,包括設(shè)計圖紙的協(xié)調(diào)、圖紙會審和技術(shù)交底。各專業(yè)正式展開前30天,技術(shù)協(xié)調(diào)小組與設(shè)計院聯(lián)系并協(xié)調(diào),確保圖紙會簽順利進行、到位。工程開始前一周組織各專業(yè)圖紙會審,并在會審后3天內(nèi)做好技術(shù)交底工作。施工過程中如果發(fā)現(xiàn)專業(yè)圖紙之間存在矛盾,由技術(shù)協(xié)調(diào)小組和設(shè)計院聯(lián)系,在3天內(nèi)辦妥設(shè)計修改事宜。 管理協(xié)調(diào):總承包將建立健全專業(yè)工程協(xié)調(diào)管理措施,形成問題責(zé)任制度,以總承包項目經(jīng)理統(tǒng)一領(lǐng)導(dǎo),專人統(tǒng)一指揮,及時解決各施工單位的協(xié)調(diào)工作。嚴格各工序的驗收和檢查制度、嚴格進度計劃節(jié)點控制制度,避免相互推諉、相互干擾的現(xiàn)象。 組織協(xié)調(diào):建立專門的協(xié)調(diào)會議
29、制度,每周組織各專業(yè)施工協(xié)調(diào)會,解決施工中的協(xié)調(diào)問題。對于較復(fù)雜的部位,在施工前3天組織專門的協(xié)調(diào)會,使各專業(yè)隊進一步明確施工順序和責(zé)任。3.2 機械配備和使用計劃3.2.1機械進出場計劃本工程所使用的吊車和小型機具在施工準備期內(nèi)全部進場;施工小型機械、井架、混凝土泵車、塔吊、運輸車輛等大型機械按施工進度計劃的要求進場,機械進出場計劃如下:前期工作需要的機械在開工后7天內(nèi)全部到位,包括測量儀器、配電箱、空壓機、電焊機、泥漿泵以及其他前期施工需要的小型機具進場。大部分小型機具在結(jié)構(gòu)封頂后退場,電箱和測量儀器將持續(xù)使用到工程竣工。挖土前2臺fo23-b塔吊安裝就位(高效沉淀池和均質(zhì)濾料濾池兩棟),
30、并通過政府安檢機構(gòu)的驗收??偝邪鼘⑻峁┈F(xiàn)有的機械設(shè)備共各指定分包商無償使用,如果仍不能滿足需要,指定分包商需自行解決,總承包提供力所能及的配合和幫助。結(jié)構(gòu)混凝土采用固定泵澆筑。3.2.2主要施工機械配備計劃表序號機械或設(shè)備名稱型號規(guī)格數(shù)量國別產(chǎn)地制造年份額定功率(kw)生產(chǎn)能力備注1附墻式塔吊fo23-b2臺山東200775kw120t.m2履帶吊qt152臺中國200815噸改造生物反應(yīng)池底板3壓路機bw-1412臺國產(chǎn)20078t回填4蛙式打夯機4臺國產(chǎn)20074kw回填5輕型井點射流泵型8套國產(chǎn)200645kw/套降水61.4 m3挖土機dh2204臺日本2007950m3班7土方車sh
31、326120輛上海20066m38角鋼井架自制2臺自制7.5kw1000kg9汽車移動泵ipf100b-6n32/42臺日本200630 m3/h10混凝土運輸車fv45110輛日本20066m3輛次1150t汽車吊nk-500e1臺日本200650t12管道式離心泵isg-2503臺上海60kw8 m3供水13砂輪切割機j3-sl-404臺國產(chǎn)2.2kw14多用木工平刨mb106a2臺國產(chǎn)4kw15鋼筋切斷機2臺國產(chǎn)1.8kw16鋼筋彎曲機2臺國產(chǎn)2 kw17插入式振動器zn50*620臺國產(chǎn)1.1kw18泥漿泵qx12.5-5010臺國產(chǎn)4.5kw19配電箱20安培30只國產(chǎn)20電焊機30
32、0abx3-300a8臺國產(chǎn)42kva21全站儀tc18001臺瑞士20083.3 勞動力配備和使用計劃本工程我們將選擇與我公司長期合作的、誠信度高、具有一流勞動素質(zhì)、能夠打硬仗的勞動隊伍,主要工種包括木工、鋼筋工、混凝土工、輔工、泥工、起重工、電焊工、架子工、其他工種以及指定分包商的勞動力,高峰期間現(xiàn)場勞動力總量估計需要達到1200(人)左右。目前我們已經(jīng)著手準備勞動力的選擇和準備工作,一旦中標,前期施工勞動力即可進場投入正常工作;施工準備期間,后續(xù)工作如挖土、結(jié)構(gòu)等施工所需的勞動力全部準備就緒,并按照進度計劃的要求分批進場,確保工程施工的需要。施工過程中,我們將會把每個月現(xiàn)場的勞動力匯總表
33、(工種、人數(shù)、等級、勞動力進出場計劃)遞交給業(yè)主、監(jiān)理,如果業(yè)主認為不妥或認為勞動力配備不能滿足施工需要,總承包項目部將做及時的調(diào)整。3.4 材料配備和使用計劃施工準備期(15天)內(nèi)確定材料供應(yīng)計劃及物資儲備、申請、定貨計劃、加工計劃,所確定的主要材料供應(yīng)商及用于工程的主要材料,開工前經(jīng)過業(yè)主和現(xiàn)場監(jiān)理的審核、確認。 各類原材料的供應(yīng)、配置:合理配置施工周轉(zhuǎn)材料、原材料供應(yīng)組織是確保工程按期完成的前提條件,為此,在周轉(zhuǎn)材料及各類原材料的供應(yīng)、配置方面,我公司作如下考慮:周轉(zhuǎn)材料主要是模板系統(tǒng),我公司將在施工準備期內(nèi)做好鋼模板、鋼管扣件等周轉(zhuǎn)材料的購買或租賃工作。加大施工階段的材料投入,做好材料
34、供應(yīng)計劃、物料運輸計劃。對各類原材料供應(yīng)商的資質(zhì)以及供應(yīng)能力、信譽等級進行考察,在工程前期工作進行的同時確定各材料供應(yīng)商,做到“兵馬未動,糧草先行”。工程施工過程中,按照施工進度計劃的要求和現(xiàn)場堆場的能力分批組織材料、構(gòu)件的進場。由于本工程場地內(nèi)各類材料眾多,所以材料和構(gòu)件原則上以少量、持續(xù)進場為原則,鋼筋等用量多、占地面積大的材料原則上進場后及時組織吊運到施工操作面;模板、鋼管等周轉(zhuǎn)材料在樓層面上周轉(zhuǎn)。 主要材料的供應(yīng)來源:混凝土:商品混凝土,事先確定配合比并通過監(jiān)理和設(shè)計的批準。澆砼前一天開始做攪拌準備(包括5m3中試)以及確定運輸線路、辦理通行證等工作,澆砼當天組織進場,保證60m3h的
35、供應(yīng)能力。模板:鋼管和鋼模板租賃,夾板新購,木模板現(xiàn)場加工。三層結(jié)構(gòu)施工前,100模板、鋼管和夾板到位。鋼筋:采用廠供成型鋼筋,少量現(xiàn)場加工。粗鋼筋機械接頭采用等強直螺紋接頭(需要業(yè)主和建筑師的認可)。砂漿:商品砂漿,保持現(xiàn)場50噸的儲存能力,持續(xù)進場。裝飾材料:按照施工進度和現(xiàn)場堆場的能力分批進場。指定分包商的材料:我們將對指定分包商的材料供應(yīng)計劃進行審核并在過程中實施監(jiān)控,以確保工程進度。4. 施工總平面規(guī)劃4.1 施工總平面布置說明本工程施工現(xiàn)場根據(jù)不同的施工階段分別布置,各類臨時設(shè)施根據(jù)現(xiàn)場實際情況做相應(yīng)的變化,以滿足業(yè)主使用以及現(xiàn)場施工的需要。我們將統(tǒng)一規(guī)劃搭建分包商辦公室、加工廠和
36、輕質(zhì)材料堆場,這些設(shè)施的搭建將征得業(yè)主的同意并搭建在指定區(qū)域?,F(xiàn)場布置時,我們將著重考慮安全、防塵、防污方面的問題,我們將嚴格按照上海當?shù)卣挠嘘P(guān)規(guī)定完善現(xiàn)場標準化設(shè)施,并在施工的不同階段增設(shè)針對的安全、防塵、防污設(shè)施,以保持環(huán)境整潔、安靜、出入通暢,最大限度避免施工對周邊環(huán)境的影響。對于分包商、指定分包商所使用的加工廠、材料和構(gòu)件堆場,總承包將做統(tǒng)一規(guī)劃并進行協(xié)調(diào)管理,現(xiàn)場平面布局以及各類設(shè)施必須嚴格按照施工現(xiàn)場平面布置圖的規(guī)定安排,任何變動必須通過總承包的同意并及時恢復(fù)。對各施工階段現(xiàn)場設(shè)施布置的具體情況分別進行說明:4.2 各階段施工現(xiàn)場平面布置(1)現(xiàn)場圍墻和進出口現(xiàn)場圍墻實施全封閉
37、處理;周邊圍墻做法為2.2米高,20公分厚砌體,雙面粉刷并刷白色涂料。大門做法需經(jīng)發(fā)包方確認后方能實施。(2)施工便道施工道路環(huán)現(xiàn)場位置布置,主道路寬度6m,每棟樓都有臨時道路;做法:素土夯實200碎石150c20混凝土,道路靠圍墻側(cè)做排水系統(tǒng)。道路位置見現(xiàn)場布置平面圖。(3)排水排污系統(tǒng)現(xiàn)場排水和排污系統(tǒng)由排水溝(管)集水井沉淀池組成;生活用水(如管理人員用水)采用管道排水方式,現(xiàn)場積水通過排水溝排除。明溝排水系統(tǒng)主要分布在現(xiàn)場圍墻內(nèi)側(cè),并根據(jù)圍墻的位置變動作相應(yīng)的變化。排水系統(tǒng)通連,每30米設(shè)置集水井,并在端頭及轉(zhuǎn)角位置設(shè)置沉淀池,污水過濾后排放。(4)現(xiàn)場辦公室現(xiàn)場辦公室搭建在業(yè)主指定的
38、場地上,使用夾心彩鋼板結(jié)構(gòu),2層16間共320m2,其中考慮監(jiān)理、業(yè)主工程師以及監(jiān)理的辦公室四間共計80m2??傮w和園林綠化施工階段,辦公用房拆除,移到首層或地下室適當?shù)奈恢弥匦麓罱ú⒆餮b修。(5)職工宿舍現(xiàn)場不設(shè)置生活區(qū),生活區(qū)集中搭建在場外業(yè)主指定的2000m2區(qū)域內(nèi)(暫估)。(6)供水和供電設(shè)施供電總電纜采用2×95mm2三相四線電纜,沿基地圍墻埋地(電纜溝)布置;3550mm2支線;沿基地圍墻每40m設(shè)1個電箱,垂直運輸設(shè)備單獨設(shè)置電箱);配備一定數(shù)量5a電箱。供水總管采用100鍍鋅鋼管,支管采用50;每棟樓設(shè)1根消防管,一根供水管,每層留設(shè)水頭;采用50管道式離心泵供水?,F(xiàn)
39、場每40米布置照明燈架,根據(jù)夜間施工操作面照明采用小太陽燈照明。(7)固定的施工機械布置考慮到施工工期緊,為了加快施工進度,在高效沉淀池和均質(zhì)濾料濾池各設(shè)置一臺fo23-b(120t.m)附墻式高吊,回轉(zhuǎn)半徑45m,共計2臺。塔吊在每棟樓挖土前進場。塔吊基礎(chǔ)采用4根直徑250*250*10000方樁,上澆灌600公分的鋼筋混凝土地板。(8)材料和構(gòu)件堆放:現(xiàn)場材料必須規(guī)范堆放,保持現(xiàn)場整潔美觀:模板進籠、鋼管分規(guī)格上架、零星構(gòu)件進庫、鋼筋分規(guī)格整齊堆放。施工材料堆放在建筑物東西兩側(cè),結(jié)構(gòu)施工階段主要設(shè)鋼筋、木料、鋼管和鋼結(jié)構(gòu)堆場;裝飾和安裝施工階段設(shè)二結(jié)構(gòu)、裝飾、水、電、風(fēng)材料、小型設(shè)備的臨時
40、堆放場地。室外工程開始后,材料堆放場地需要配合室外工程的進度作遷移,具體位置按照當時施工的實際情況確定。(9)倉庫、試驗室和標準養(yǎng)護室現(xiàn)場設(shè)一間15m2的標準實驗室,一間15m2的標準養(yǎng)護室,100m2的倉庫。(10)安全和文明設(shè)施 對結(jié)構(gòu)平面上所有的洞口進行遮蓋和圍擋; 基坑開挖時四周做好安全防護帶; 腳手架封閉,腳手架和結(jié)構(gòu)之間的空隙使用安全網(wǎng)封閉;腳手架外立面覆蓋綠網(wǎng);以上設(shè)施的節(jié)點措施詳見:現(xiàn)場安全、衛(wèi)生設(shè)施立面圖、節(jié)點圖。(11)建筑及生活垃圾辦公室旁砌筑垃圾箱,現(xiàn)場生活垃圾集中到垃圾箱中定期清運;建筑垃圾在現(xiàn)場適當位置集中堆放,四周使用竹芭進行隔離,定期委托環(huán)保部門清運。4.3 相
41、關(guān)附圖(附圖)5. 明浜處理根據(jù)總平面圖顯示和地質(zhì)資料看,根據(jù)高效沉淀池、均質(zhì)濾料濾池圖紙看,再根據(jù)以往經(jīng)驗,本工程可能有砂石墊層、明浜必須進行處理,用砂石墊層回填夯實。5.1處理技術(shù)要點處理范圍為浜寬度+2側(cè)各2m。不合格的淤泥土、雜土或腐蝕土等徹底挖除,直至溝底老土層;溝浜四周將原有邊坡挖成階梯形;土方要按照20cm分層回填并夯(壓)實;每層測定填土密實度;換填過程中保持坑內(nèi)無積水。5.2不良土方的挖除先在浜兩側(cè)開挖排水溝,然后將不合格的淤泥土、雜土或腐蝕土等徹底挖除,直至溝底老土層。溝浜四周按照要求將原有邊坡挖成階梯形,每級階梯高度控制在20cm左右,寬度為50cm。砂石墊層處理流程圖位
42、置、深度復(fù)測機具、材料供應(yīng)計劃制定施工方案現(xiàn)場道路、挖排水盲溝挖掘不良土層排水、抽水運走制定堆放場挖掘換填取運粘土分層鋪填防護、防污壓路機分層壓實 自檢監(jiān)理認可進行上層填方作業(yè)監(jiān)理認可合格合格5.3回填和夯實、碾壓挖到老土面后,按壓實度要求將老土壓實,土壤過軟無法碾壓時,可與設(shè)計協(xié)商先填筑一層50cm左右厚度的礫石砂。并用砂石封面。用優(yōu)質(zhì)砂石按照每2030cm分層回填夯實,間隔填筑至地面高度。松鋪厚度控制在30cm,壓實厚度為20cm。壓路機由浜中央向兩側(cè)進行碾壓5-6遍,第一遍與最后一遍為靜壓。中間幾遍可用小頻率振動碾壓,速度控制在3-5km/h。邊坡部位采用人工夯實?;靥顣r兩側(cè)設(shè)排水溝,中
43、心向兩側(cè)雙向留設(shè)2%-3%的橫坡,以利于施工期間的排水。攤鋪過程中加強排水,保持干燥,嚴禁在水中進行攤鋪。填浜時如遇流沙難以挖盡,采用大石塊拋石,后用碎石嵌密填平,再鋪一層50cm厚砂礫,然后分層回填夯實,頂部20cm范圍采用c10混凝土加固。三 、主要施工方案1. 主要技術(shù)難點及其對策:1.1 砂石墊層處理 難點分析根據(jù)現(xiàn)場地質(zhì)條件,如果砂石填筑質(zhì)量不過關(guān),定會造成建筑不均勻沉降、總體建筑物和場地塌陷、總體管道不均勻沉降和爆裂等嚴重后果。本工程需要處理砂石深度較深、工期緊,在填筑流程控制、碾壓控制以及土方平衡方面,都存在較大的困難。 主要對策:我公司充分注意到軟弱地基的處理質(zhì)量對于今后總體道
44、路、場地和總體管道質(zhì)量及使用壽命的直接關(guān)聯(lián)。我們將嚴格控制填筑層的分層厚度和壓實指標;同時嚴格控制填筑材料的含水率,加大過程中的檢測力度,結(jié)合工程施工技術(shù)規(guī)范的要求,采取正確的措施進行填筑,確?,F(xiàn)場范圍內(nèi)的溝浜填筑壓實度達到95的標準。 關(guān)鍵的技術(shù)要點:將不合格的淤泥土、雜土或腐蝕土等徹底挖除,直至溝底老土層。溝浜四周將原有邊坡挖成階梯形,用優(yōu)質(zhì)土方在最佳含水率的條件下按照每20cm分層回填夯(壓)實。1.2 底板混凝土 難點分析:大體積混凝土構(gòu)件最忌裂縫,但由于大體積混凝土收縮、徐變等因素,控制裂縫的難度非常大?;炷翝沧r施工流程控制難度大,容易出現(xiàn)冷縫。澆注時分層不當或澆灌速度不當,都容
45、易造成混凝土產(chǎn)生各種缺陷。對養(yǎng)護的要求高。 相應(yīng)對策:優(yōu)化混凝土配合比,使用雙摻技術(shù)、低水化熱水泥、優(yōu)質(zhì)外加劑以及較大粒徑的粗骨料,嚴格控制粗細骨料的含泥量、針片狀含量等。優(yōu)質(zhì)的混凝土具有低水化熱、高流動性、和易性和可泵性的特點,是防止大體積混凝土出現(xiàn)裂縫的關(guān)鍵。分皮分層進行混凝土振搗(二次振搗),確?;炷撩軐嵍?。采用隔熱材料填充袋覆蓋混凝土表面,將混凝土內(nèi)外溫差控制在25以內(nèi)。移除覆蓋物后在表面噴涂高效混凝土養(yǎng)生液保濕致密,實踐證明非常有效果。1.3 地下室墻防裂難點及對策 難點分析:長而薄的混凝土墻澆筑后不可避免會產(chǎn)生收縮變形,如何采取有效的措施,將收縮變形降低到最低程度,確保墻體不出現(xiàn)
46、裂縫是目前建筑施工領(lǐng)域面臨的一個大難題。后澆帶節(jié)點處理有一定的難度,特別是橡膠止水帶。 針對性措施:優(yōu)化混凝土配合比,使用雙摻技術(shù),即摻入適量的粉煤灰和外加劑以減少水泥和水的用量,這樣可以有效降低混凝土的水化熱,同時增加混凝土的和易性、流動性,避免混凝土出現(xiàn)離析現(xiàn)象。使用低水化熱的水泥拌制混凝土,也是降低混凝土水化熱的一個方法。使用氯離子含量低于0.1的高效減水劑,確保混凝土質(zhì)量的同時最大限度的減少水用量,降低水灰比。在征得的設(shè)計允許的前提下,可以進行鋼筋等截面代換,減小墻水平鋼筋規(guī)格和間距,可以有效增強混凝土表面的抗裂能力。在征得設(shè)計允許的前提下,在混凝土中摻入少量的聚丙烯纖維,我們的實踐證
47、明,同普通混凝土相比,體積摻量0.05%(約0.5kg/m3)的聚丙烯纖維混凝土抗裂能力提高近70%,抗?jié)B能力提高60%-70%。避免使用拌制90分鐘以后的混凝土;遵守“斜面分層、薄層澆筑、循環(huán)往復(fù)、一次到頂”的墻體分層澆筑原則,實行二次振搗,我們大量的工程實踐證明,混凝土振搗越密實,其收縮量就越小。加強混凝土的養(yǎng)護,采用高效混凝土養(yǎng)生液可以有效的達到保濕、致密以及防裂的作用。仔細進行后澆帶節(jié)點處理:止水橡膠必須滿足設(shè)計和規(guī)范要求。止水橡膠的安放必須平整,不能有皺曲。后澆地封閉前仔細清理施工縫表面以及止水帶表面。1.4 地坪一次性隨搗隨光難點及其對策 難點分析:澆注面積達到1000m2不留縫,
48、這種地坪即容易因為收縮產(chǎn)生裂縫,防止地下室滲漏。隨搗隨光地坪表面處理有一定難度,處理不好會出現(xiàn)不規(guī)則的表面受水裂縫。表面平整度和光潔度的施工質(zhì)量難以控制。養(yǎng)護不當或者保護不當,都容易造成地坪裂縫或者破壞,施工過程中如何做到周全養(yǎng)護但不影響后道工序施工,是我們要解決的難點之一。 相應(yīng)對策:采用干硬性混凝土澆注地坪,坍落度控制在812cm左右,以減少混凝土的收縮。并在設(shè)計允許的前提下,在混凝土中摻加微量聚丙烯纖維,增大混凝土自身的抗裂能力。澆砼時控制好澆注流程,注意先澆筑梁混凝土到板底標高,然后間隔2小時,待梁混凝土沉陷穩(wěn)定后再澆注上面的板混凝土,防止梁、板相接處出現(xiàn)混凝土沉縮裂縫。使用長柄板耙攤
49、鋪混凝土并用長括尺進行表面刮平;采用先進的機械提漿、機械打磨和機械磨光施工工藝,確保地坪表面的平整度和光潔度。采用高效能的混凝土養(yǎng)生液進行養(yǎng)護,并在下道工序施工是,在地坪表面鋪設(shè)適當?shù)谋Wo材料。1.5防水層施工技術(shù)(地下室和屋面工程) 難點分析:防水層施工質(zhì)量出現(xiàn)問題,造成滲漏現(xiàn)象,是建筑工程施工的質(zhì)量通病。任何一個環(huán)節(jié)沒有嚴格掌控,就會產(chǎn)生滲漏現(xiàn)象。 主要對策:嚴格控制防水層原材料的質(zhì)量,材料進場,除了嚴格檢查產(chǎn)品出廠合格證、質(zhì)量保證書和化學(xué)分析報告外,還需另外抽樣進行復(fù)試。加強對防水層基層質(zhì)量的驗收,確?;鶎悠秸取⒏稍锒确戏浪畬邮┕さ馁|(zhì)量要求。嚴格按照現(xiàn)行防水層施工規(guī)范及質(zhì)量標準進行驗
50、收,我公司將排專職質(zhì)量遠全過程負責(zé)其施工質(zhì)量。2. 主要施工方案 垂直運輸機械的布置和使用:高效沉淀池和均質(zhì)濾料濾池兩棟各布置1臺fo23-b附墻式塔吊(r45m),共2臺,滿足垂直運輸和水平運輸要求;加快施工進度(因工期只為134天)。 圍護:改造生物反應(yīng)池、反沖洗廢液池、提升泵房基礎(chǔ)開挖深度超過5米,屬于深基坑基礎(chǔ),圍護結(jié)構(gòu)采用拉森鋼板樁圍護;高效沉淀池和均質(zhì)濾料濾池基坑開挖深度不超過3米,可以根據(jù)實際情況定,根據(jù)地質(zhì)資料報告放坡開挖。(可以根據(jù)現(xiàn)場情況定改造生物反應(yīng)池因四周有原有的道路,圍護結(jié)構(gòu)采用重力式擋土墻圍護) 降水:改造生物反應(yīng)池、反沖洗廢液池、提升泵房基礎(chǔ)開挖采用10套井點降水
51、。 挖土:采用1.4m3挖土機直接進行,住宅土方一次挖到底標高以上200,地下車庫土方呈2級臺階開挖,機械挖土剩余的200厚土方,人工鏟平到設(shè)計標高。 腳手架:落地腳手架,腳手架外立面綠網(wǎng)滿封。 混凝土:采用商品混凝土,地下室結(jié)構(gòu)以采用2臺汽車移動泵澆筑,45m布料桿。 養(yǎng)護:底板采用二層薄膜+二層麻袋覆蓋保溫養(yǎng)護;樓板表面復(fù)蓋一層麻袋并澆水養(yǎng)護1周; 模板:墻體、樓板、柱采用木模板,木方隔柵,鋼管支撐體系;梁采用定型小鋼模,48鋼管圍檁。 鋼筋:現(xiàn)場加工成型鋼筋。 加藥間、配電間框架填充墻防滲:磚墻與混凝土結(jié)構(gòu)連接采用柔性節(jié)點,有效地解決混凝土與磚墻收縮不一而造成磚墻開裂:磚墻與混凝土柱、墻
52、之間采用波形條拉結(jié),縫間襯橡膠條填充,外側(cè)填充防水、防火填充料。磚墻頂部與梁板離縫30mm,兩側(cè)采用角鋼固定,縫內(nèi)填充防火阻燃材料。 建筑垂直度控制:配備高精度的tc1800全站儀,采用天頂法進行本工程的垂直度測量。基準點將設(shè)置在位移和晃動極小的b1層結(jié)構(gòu)面,各樓層定位均從基準點一次投點進行測量。 計算機信息化管理:本工程大體積混凝土養(yǎng)護、資料管理、材料管理、技術(shù)管理等等一系列管理活動中,采用計算機網(wǎng)絡(luò)辦公系統(tǒng),并應(yīng)用project、autocad等工程管理軟件,最大限度的提高工作效率以及企業(yè)社會效益。四、 施工總進度計劃1. 影響工期的主要因素及其對策1.1 圖紙修改和指定分包商的圖紙深化
53、施工圖紙局部設(shè)計優(yōu)化、修改在所難免,但如果設(shè)計修改量大、面廣,則對工期的影響是非常大的。作為施工總承包方,要求的是設(shè)計修改盡可能提前通知,并在過程中加大與設(shè)計協(xié)調(diào)和溝通的力度,同時做好指定分包商和設(shè)計只見的橋梁、樞紐作用,以便將設(shè)計修改對工期的影響減少到最低程度。1.2 專業(yè)分包的招標及進場本工程綠化、弱電、智能化、消防等工程由業(yè)主指定分包商施工但仍屬總承包管理范圍。為了不影響施工進度,總包方有責(zé)任提醒和協(xié)助業(yè)主方,及時組織專業(yè)分包商的招標工作,并按計劃進場施工。1.3 甲定材料設(shè)備采購及進場本工程相當部分的建筑,安裝材料設(shè)備均是業(yè)主指定或業(yè)主方供應(yīng)(大型設(shè)備采購)。這些材料、設(shè)備的供應(yīng)商的選
54、擇、確定和進場對工期直接相關(guān)。作為總承包方,可根據(jù)施工計劃,列出關(guān)鍵路線上的材料,設(shè)備進場計劃,從而可確定材料設(shè)備的選定或招標計劃,配合業(yè)主方及時完成甲供應(yīng)材料設(shè)備的工作。1.4 資金總包方將嚴格履行總承包管理合同與分包合同。業(yè)主方付給總承包方的工程款,施工將優(yōu)先考慮用于分包方。專業(yè)業(yè)主工程款支付遇到暫時困難時,為了保證工程的連續(xù)施工,總包方將提供一定數(shù)量的資金,以解燃眉之急。1.5 施工技術(shù)方案因素我們將優(yōu)化自行施工項目的施工技術(shù)方案,審核指定分包商的技術(shù)方案,協(xié)調(diào)各工種工序的流水搭接方案,以確保工程進度。2. 分階段目標管理計劃 施工準備階段:共10工作日。 各棟樓樁基、基礎(chǔ)、主體結(jié)構(gòu)同時
55、開工,因為對每一個單體來說都只有134天工期,都是比較緊,加大各單體的流水施工作業(yè)。以改造生物反應(yīng)池、高效沉淀池和均質(zhì)濾料濾池為施工主線?;A(chǔ)主體均需要80天工期。 安裝調(diào)試階段為40??⒐を炇眨呵謇淼龋?天。共計134天。3. 施工總進度計劃(見后)4. 工期保證措施4.1圖紙保證:將施工圖紙的協(xié)調(diào)和管理工作規(guī)劃在總進度控制的概念下,我公司將委派專人主動與設(shè)計單位聯(lián)系,約定施工圖到位的時間,為施工創(chuàng)造條件。4.2 施工技術(shù)保證:針對性的編制施工技術(shù)方案,尤其針對影響工程總進度方案做周全詳細的考慮,在此基礎(chǔ)上運用新技術(shù)、新工藝來縮短各個施工工序的施工周期,以科技保障施工進度。做好冬雨、季施工技術(shù)措施,制定針對冬雨季施工的針對性施工方案,避免冬雨季施工對工程進度造成的影響。4.3 編制合理的施工計劃:及時
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度車場租賃及停車場綠化美化服務(wù)協(xié)議4篇
- 科技引領(lǐng)下的宇宙探索進展
- 二零二五年度車輛融資租賃合同違約責(zé)任答辯狀樣本8篇
- 二零二五年度車輛買賣合同含車輛綠色環(huán)保認證3篇
- 二零二五年度草坪圍欄施工與城市排水系統(tǒng)配套合同2篇
- 2025年度個人知識產(chǎn)權(quán)代理傭金協(xié)議4篇
- 二零二五年度櫥柜衣柜模塊化設(shè)計生產(chǎn)合同4篇
- 2025年度個人車位買賣合同范本(寫字樓)3篇
- 高效體育訓(xùn)練學(xué)生體能提升的秘密武器
- 2025年度綠色有機牛奶產(chǎn)銷一體化合作合同范本4篇
- 第八講 發(fā)展全過程人民民主PPT習(xí)概論2023優(yōu)化版教學(xué)課件
- 實體瘤療效評價標準RECIST-1.1版中文
- 王崧舟:學(xué)習(xí)任務(wù)群與課堂教學(xué)變革 2022版新課程標準解讀解析資料 57
- 企業(yè)新春茶話會PPT模板
- GB/T 19185-2008交流線路帶電作業(yè)安全距離計算方法
- 2022年上海市初中畢業(yè)數(shù)學(xué)課程終結(jié)性評價指南
- DIC診治新進展課件
- 公路工程施工現(xiàn)場安全檢查手冊
- 1汽輪機跳閘事故演練
- 禮品(禮金)上交登記臺賬
- 普通高中英語課程標準詞匯表
評論
0/150
提交評論