1、拉索幕墻施工質量控制要點securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipm
2、ent; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall
3、 participate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。 Eight, provided by
4、 the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures f
5、or acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures,
6、 develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the sub-contractor for scaffolding, construction site facilities, equipment
7、 safety protection facilities, safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical o
8、perations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。 Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is
9、strictly prohibited and unauthorized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, firefighting equipment are no
10、t allowed to divert it. Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ”ten does not burn” provisions, prohibited the use of furnaces. Construction such as open flame heating measures must be used, you should obtain the consent o
11、f General fire拉索幕墻施工質量控制要點 南京第一建設事務所有限責任公司 ? 葛群星 摘要 本文結合拉索幕墻的施工過程,對鋼結構框架與拉索幕墻之間連接及玻璃安裝施工質量控制要點簡要論述與分析。 關鍵詞 鋼結構 拉索幕墻 玻璃安裝 施工質量 控制要點 南京青奧體育公園項目市級體育中心拉索幕墻工程1。23萬平方米,地下1層,地上6層,砼框架+鋼結構,總高度為42米,幕墻高度為30。45米,幕墻設計使用年限不少于25年,抗震設防7度,防火設計建筑分類一級,幕墻防雷設計等級二類,幕墻結構安全等級二級,本次監(jiān)理的范圍包括體育館立面的拉索玻璃幕墻. 該工程體育館外周48根柱為直徑78。5CM鋼
12、管柱外包鋼筋混凝土結構,鋼管柱芯注入C40混凝土至10。15米標高,有6跨從一層+0.00起鋼管柱外斜至6層34.00米標高,其余42跨從二層5.400米標高起向上至6層34.00標高傾斜,傾斜夾角角度為75度,整個體育館外形呈底口小上口大口杯型狀,并且上口標高高度不等,本工程拉索玻璃幕墻,玻璃板塊分格為矩形,為了增加工程的美觀性,同時也為了玻璃更好的受力,駁接件選用球鉸夾具,使玻璃和夾具形狀更為統(tǒng)一,在風荷載作用時球鉸結構的中心基本處于玻璃中心,使玻璃在撓度限值內產生自由變形,使玻璃應力大大降低,下面結合本工程拉索幕墻的施工過程,對該拉索結構的關鍵節(jié)點進行簡述: securely, no t
13、hrowing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting mat
14、erial, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry firefighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; S
15、ide facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。. Eight, provided by the General machinery and
16、 equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery
17、, is strictly prohibited in the case of unqualified acceptance or acceptance into use。 Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and mana
18、gement systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records。 Ten, the sub-contractor for scaffolding, construction site facilities, equipment safety protection facilit
19、ies, safety signs and warning signs may be supplemented, removed, changed。 If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed。 Plenary and small mechanical operations, special operati
20、ons and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。 Hoisting personnel must abide by hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and una
21、uthorized operations use electric appliances, machinery and equipment。 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places nonsmoking and the use of open flames, firefighting equipment are not allowed to divert it。 Weld
22、ing and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General firesecurely, no thr
23、owing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting mater
24、ial, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry firefighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; Sid
25、e facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。 Eight, provided by the General machinery and eq
26、uipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, i
27、s strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and managem
28、ent systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the subcontractor for scaffolding, construction site facilities, equipment safety protection facilities,
29、 safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical operations, special operations
30、and personnel, required training, after passing the examination by the relevant departments, with valid ID posts. Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and unauth
31、orized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places nonsmoking and the use of open flames, fire-fighting equipment are not allowed to divert it。 Weldin
32、g and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn” provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General fire1 拉索耳板定位焊接 應控制預埋件
33、、后植埋件材質質量,通過測量放線對豎、橫向拉索耳板定位,對焊接質量、標高、角度位置進行驗收,由于勁鋼柱母材材質是Q345B,設計要求拉索耳板材質必須與母材相匹配,焊縫等級為一級,要求施工單位進行超聲波探傷自檢檢測,監(jiān)理人員進行旁站,發(fā)現問題后進行整改,然后進行復查,監(jiān)理經過施工方自檢檢測記錄,上報給業(yè)主,由業(yè)主安排有資質的第三方檢測單位再進行按設計規(guī)范要求進行抽檢,抽檢全數合格后,經監(jiān)理部隱蔽驗收后,方可進行防腐工序處理。 2 豎、橫拉索的布設 form (3), and accident hidden processing standard (4), and site security lo
34、g 3, and security supplies acceptance records (business license, and production license, and factory certificate, and products detection report or its He proved material attached Hou) 4, and construction site temporary electricity archives (1), and site temporary electricity electrical operation sec
35、urity technology lowdown (2), and construction site temporary electricity acceptance table (3), and grounding resistance test records (4), and mobile and the handheld mobile tool regularly insulation resistance test records (5), and electrical daily visits maintenance records (6), and construction s
36、ite electrical equipment check records table (7), and distribution box each ten special check records table 5, and pit support nursing acceptance table (1), and pit adjacent buildings settlement observation records table (1 ), Deformation monitoring of Foundation pit support records in table 6, form
37、work supporting system acceptance table 7, template removal request form 8, a special type of scaffold (pick, try hung, attached lifting scaffolding) tables 9, scaffold erection acceptance acceptance form (General, high-rise scaffolding) 10, scaffolding removed (including the main component) applica
38、tion form 11, Derrick and crane installation acceptance form 。. Site temporary power electrician safety technology gives the low-down (reference tables) construction construction construction organization name project name 5-41 content security technology to give the low-down the content must be app
39、roved by the technical training hold special operations after passing the examination certificate; The ease with which engaged in electrical work must meet the electrician required。 On the more difficult and more complex electrical engineering shall not be completed by the lower-level electrician; E
40、lectricians must be familiar with the technical specifications of the temporary electricity in construction site safety; All insulation, testing tools, and should be properly kept, it is strictly prohibited to use, and should be inspected regularly, check; Line no load on or off, and prohibit the ch
41、arged operation; Dangerous job, someone must monitor at the safe distance; When debugging and maintenance of electric power transmission, in addition to reliable power measures, should be hung at the switch box ”action to suppress the closing sign, and with special care; Targeted security gives the
42、low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan three copies of the form, team and keep a, filed a report, the security sector。 Temporary electricity in construction site acceptance form project name supply planning capacity (KW) rated cu
43、rrent a wire cross section ? plant protection system serial number check acceptance requirements results 1-construction organization design of temporary power supply onsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to th
44、e area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to c
45、arry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; Side facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the
46、 low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams .。 Eight, provided by the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package
47、in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use。 Nine, all subcontractors and G
48、eneral units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with th
49、e requirements, borrowing unit must be checked and written handover records。 Ten, the sub-contractor for scaffolding, construction site facilities, equipment safety protection facilities, safety signs and warning signs may be supplemented, removed, changed。 If needed change, must be approved by the
50、head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed。 Plenary and small mechanical operations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。
51、 Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and unauthorized operations use electric appliances, machinery and equipment。 12, the subcontractor must strictly implement
52、 the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, fire-fighting equipment are not allowed to divert it。 Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the
53、”ten does not burn provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General fire由于體育館每跨跨矩及高度均不等,要求施工單位進行現場細致的統(tǒng)計、測算,按編號順序下定單,該工程所有的拉索為不銹鋼“堅朗品牌,豎索直徑為18MM,橫索直徑為20,,和18MM兩種規(guī)格,體育館主體部分采用拉索點式玻璃幕墻系統(tǒng),拉索幕墻的荷載組合:自重,風荷載,地
54、震荷載,溫度荷載,系統(tǒng)采用水平魚腹形雙層索,豎向承重索,穩(wěn)定索結構,水平索主要承受水平,豎向承重索主要承受點式幕墻自重,豎向后部穩(wěn)定索主要起穩(wěn)定結構工作,拉索進場后,監(jiān)理人員開箱檢查產品合格證、產品說明書、出廠檢測報告,同時要求隨機抽取進行見證取樣,由業(yè)主委托的資質檢測單位進行復檢,合格報告出具后,準許施工單位按照編號順序安裝調試,監(jiān)理部組織人員進行驗收。 ,拉索撐桿及球形鉸不銹鋼夾具安裝 securely, no throwing tools and waste; The deployment of material should be tuned on the ground after t
55、he first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to F
56、ireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations。 With materials stimulate the allergic persons, shall participate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt
57、; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams .。 Eight, provided by the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before
58、 delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. N
59、ine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condit
60、ion and in accordance with the requirements, borrowing unit must be checked and written handover records。 Ten, the subcontractor for scaffolding, construction site facilities, equipment safety protection facilities, safety signs and warning signs may be supplemented, removed, changed。 If needed chan
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 金屬圍欄施工方案
- 幼兒園獲獎公開課:小班數學《幫瓢蟲找家》教案
- 礦山隧道堵漏施工方案
- 發(fā)展鄉(xiāng)村特色產業(yè)助推新型農村集體經濟的價值及舉措論述
- 優(yōu)化勞動用工制度的策略及實施路徑
- 食品加工企業(yè)物流運輸與配送安全fa
- 低空經濟公司未來發(fā)展戰(zhàn)略
- 基于問題導向的高中物理教學策略研究
- 中外名建筑賞析知到課后答案智慧樹章節(jié)測試答案2025年春濰坊工程職業(yè)學院
- 河北省石家莊高三第二次教學質量檢測文綜政治試題
- 早產兒與低出生體重兒袋鼠式護理技術規(guī)
- 進化醫(yī)療-跨物種腫瘤基因治療的開拓者
- 法理學復習題+答案
- 信息化系統(tǒng)平臺試運行方案
- 統(tǒng)編版(2024新版)七年級下冊道德與法治期末復習背誦知識點提綱
- 《田野調查方法》課件
- 2024年度寧夏回族自治區(qū)國家電網招聘之環(huán)化材料類題庫檢測試卷B卷附答案
- 火電工程達標投產考核標準(2024版)
- 2024年云南省中考物理真題含解析
- 《信號工程施工》課件全套 穆中華 項目1-3 信號圖紙識讀、施工技能訓練、信號聯鎖試驗
- 全新網絡安全教案:應對2024年網絡威脅
評論
0/150
提交評論