FORENSIC
STRUCTURAL
ENGINEERING:INVESTIGATIONS,
CAUSES
&
REFURBISHMENT
OFCRACKINGIN
A
POST-TENSION
SLAB
BRIDGEANAIRENE
LOREA–INGENIERíA
ZERO
S.L.FORENSIC
STRUCTURALENGINEERING:
INVESTIGATIONS,
CAUSES
&REFURBISHMENT
OF
CRACKINGINAPOST-TENSIONSLABBRIDGESCENARIOCURRENT
STAT
E
OF
THE
BRIDGEOPERATING
PROCEDUREHYPOTHETICALCAUSESIDEALISATIONOFTHESTRUCTUREGEOMETRYPOST-TENSIONING
TENDONSREINFORCEMENTSMATERIALSSTAGESMODEL
ISSUESSIMULATION
ANDANALYSISGLOBALRESISTANCESERVICEABILITYLIMITSTATESREFURBISHMENTCONCLUSIONSFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
THEBRIDGEAGETYPOLOGY–12
years–post-tension
concrete
slab
bridgePC-45MPaMAINFEATURES
–curved
in
plan
R=70m–skewed
abutments–structural
concrete
upperspine–h.b
=1.10+0.25+1.05
=
2.40m–L.c=
48.0m–L.a
=37.5m‰
slenderness=L/20‰
apparent
slend.
=L/37FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGEEXCESIVE
CRACKING
-overpasses
crack
width
limit–bottom
footpath-
abt.2–bottom
deck-
abt.2abt.2footpathdeckFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGE–upperspine
-topface–upperspine
–sideface
abt.2FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGE–upperspine
-sideface
abt.1FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDUREHYPOTHETICAL
CAUSESIDEALISATIONSIMULATIONREFURBISHMENTREPAIRANALYSISFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDURE-HYPOTHETICAL
CAUSESEARLY
THERMALCRACKcrack
inducer.REINFORCEMENTDIRECTIONnot
orthogonal.CONCRETED
INAUGUSTWITH40
DEGREESdecreaseof
concrete
resistance
(fck
andfct).THESPINEWAS
CONCRETED
INTWO
STAGESconstruction
joint,
partlybonded
usinganepoxyresin.THEFOOTPATH
WAS
EXECUTEDWITH0.50MTHICK
PAVEMENTnot
prescribed
in
the
project.FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDURE-IDEALISATION
OF
THESTRUCTURE
-GEOMETRYBIM
MODELFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-POST-TENSIONING
TENDONSBIM
MODEL32tendons
24strandsFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-REINFORCEMENTSBIM
MODELFEMMODELEmbebedreinforcementFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-REINFORCEMENTSFEMMODEL
DETAILSFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSCONCRETE
‰
TOTA
LSTRAINCRACK
MODEL.
ROTATED.Noinformation
but
the
onesin
theconstruction
project.Mean
values(MC-2010).CompressivebehaviourThorenfeldt
curveTensile
behaviourHordijk
curvef.cm.t00=
63.70MPaFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSNONLINEARTENSION
SOFTENINGPlain
concreteFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSSTEEL‰
ISOTROPICPLASTICITY.
STRAINHARDENING.B500S
Reinforcing
SteelY1860SPost-tensioning
SteelReinforcementCarbon
FiberBarCarbon
Fibertendon
CONFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-STAGES1stSELFWEIGHT
+POST-TENSIONING
FORCES+BEARING
ANCHORAGE2nd3rd4th5th6th7thDEAD
LOADS:
FOOTPATHS
ANDROADWAYFOOTPATHS
DEAD
LOAD
REMOVALSUPPORTOFFOOTPATHS
SLABONABUTMENTSRESTITUTION
OFNEWFOOTPATHS
PAVEMENTUNIFORM
TRAFFIC
LOADGLOBALRESISTANCE-UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MODEL
ISSUESREINFORCEMENTLAP
ANDANCHORAGEPerfect
bond
of
reinforcement.Avoid
duplicity
of
laped
bars.Other
possibilityuseof
bond-slip
by
interfaces
butnotpractical
for
many
bars
(3600embebed
reinforcements).FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MODEL
ISSUESTRANSVERSEBEAMAT
SUPPORTSLinearelastic
behaviourof
material.Avoid
local
failure
for
the
introduction
oftendon
forces
atanchorages.FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBALRESISTANCE
FACTOR
METHOD
MODEL
CODE
20107th
STEPGLOBALRESISTANCE-UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBAL
STABILITY
-VERTICALDEFORMATION
dz
(m)STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENT
5xTRLOADDZ(M)v.s.
STEPS0.00E+00050100150200250300350400-5.00E-02-1.00E-01-1.50E-01-2.00E-01-2.50E-01-3.00E-01-3.50E-01-4.00E-01-4.50E-01-5.00E-01A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEVERTICALDEFORMATION
dz
(m)STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECOMPRESSIVESTRESS
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECOMPRESSIVESTRESS
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEPLASTICSTRAIN
STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEPLASTICSTRAIN
STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBAL
VERTICALDEFORMATION
dz
(m)
STAGE
1ST
-
8THGLBUNIF.
TRAFFIC
LOADEXTERIORFOOTPATH
LOADED
–WITHOUT
NEWREINFORCEMENTDZ(M)v.s.
STEPSEXTPAT
H0.00E+00020406080100120-1.00E-02-2.00E-02-3.00E-02-4.00E-02-5.00E-02-6.00E-02-7.00E-02-8.00E-02-9.00E-02-1.00E-01A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEREINFORCEMENTPLASTICSTRAIN
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADEXTERIORFOOTPATH
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECRACK
WIDTH
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADEXTERIORFOOTPATH
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEVERTICALDEFORMATION
dz
(m)
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADINNERFOOTPATH
LOADED
–WITHOUT
NEWREINFORCEMENTDZ(M)v.s.
STEPSINNER
PAT
H0.00E+00020406080100120-1.00E-02-2.00E-02-3.00E-02-4.00E-02-5.00E-02-6.00E-02-7.00E-02-8.00E-02A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEREINFORCEMENTSTRESS
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADINNERFOOTPATH
–WITHOUT
NEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECRACK
WIDTH
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADINNERFOOTPATH
–WITHOUT
NEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
BOTTOM–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
TOP
–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
TOP
–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYREINFORCEMENTSTRESSESFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBON
REINFORCEMENTSFEM
SIMULATIONOTHERANALYTICAL
STUDIESTOP
FACE
–RADIAL
DIRECTIONBOTTOM
DECKFACE
–RADIAL
DIRECTIONVERTICAL
THROUGH
THESPINEBIM
MODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBON
REINFORCEMENTSFRPFIBER
REINFORCED
POLYMERBARS
/TENDONS
BOUND
INANEPOXI
MATRIXSTAGES1st
SELFWEIGHT
+PTFORCES
+ANCHORAGE2nd
DEADLOADS:FOOTPATHS
ANDROADWAY3rd
FOOTPATHS
DEADLOAD
REMOVAL4thSUPPORT
OFFOOTPATHS
SLABON
ABUTMENTSCARBON
REINFORCEMENTS5th
RESTITUTION
OF
NEW
FOOTPATHS
PAVEMENT6th
UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALBIM
MODELFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBONREINFORCEMENTSTRESSESFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBONREINFORCEMENTSTRESSESFSEINVESTIGATIO
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 山東省濟(jì)南市高三語文上學(xué)期開學(xué)考試語文試卷(含答案)
- 2025年粵教滬科版必修3英語上冊階段測試試卷含答案
- 2025年粵教滬科版必修一歷史下冊月考試卷
- 2025年新科版選擇性必修3化學(xué)下冊月考試卷含答案
- 2025年滬科版七年級歷史上冊月考試卷
- 2025年粵教滬科版九年級地理下冊階段測試試卷
- 2025年浙教版選修化學(xué)上冊月考試卷
- 初級金融專業(yè)-初級經(jīng)濟(jì)師《金融專業(yè)知識與實務(wù)》模擬試卷2
- 2025年四川機(jī)電職業(yè)技術(shù)學(xué)院高職單招職業(yè)適應(yīng)性測試近5年??及鎱⒖碱}庫含答案解析
- 2025年唐山幼兒師范高等??茖W(xué)校高職單招語文2018-2024歷年參考題庫頻考點(diǎn)含答案解析
- 2025年上半年長沙市公安局招考警務(wù)輔助人員(500名)易考易錯模擬試題(共500題)試卷后附參考答案
- 2025河北邯鄲世紀(jì)建設(shè)投資集團(tuán)招聘專業(yè)技術(shù)人才30人高頻重點(diǎn)提升(共500題)附帶答案詳解
- 慈溪高一期末數(shù)學(xué)試卷
- 《基于新課程標(biāo)準(zhǔn)的初中數(shù)學(xué)課堂教學(xué)評價研究》
- 貴州省黔東南州2024年七年級上學(xué)期數(shù)學(xué)期末考試試卷【附答案】
- 醫(yī)院廉潔自律承諾書
- 企業(yè)招聘技巧培訓(xùn)
- 學(xué)校校本課程《英文電影鑒賞》文本
- 重大事故隱患判定標(biāo)準(zhǔn)與相關(guān)事故案例培訓(xùn)課件
- 2024年度節(jié)后復(fù)工建筑施工安全培訓(xùn)交底
- 個人借條電子版模板
評論
0/150
提交評論