




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、Adjustment Procedure for XRD-6000,Shimadzu Corporation Analytical & Measuring Instruments Division Surface Analysis Business Unit Sales Promotion Department June/2002,1. Turn on the XRD-6000 main unit and computer,Then Main window appears on the screen (Normally automatically opened when turn on the
2、 computer. If not opened, then double-click “XRD-6000” icon on the desktop),3. Click “Display & Setup” icon,4. Then following window is appeared.,5. Confirm that door alarm button turns “red” when door is opened. And click “close” button.,6. Then small window appears and ask to calibrate the goniome
3、ter.,7. Click “OK” button. Then goniometer goes to “zero” position automatically. Then ready for adjustment.,8. Confirm that goniometer is stopped at “zero” position.,9. Double-Click “xdbinProSv” file to start this program.,10. Then “Right Gonio System: Optical Adjustment Program (2)” window is appe
4、ared.,11. Select “Lower Range” of Adjust Button.,12. Set slits and Setting Jig on the Goniometer as stated in the window,DS=0.05mm Setting Jig RS=Nothing,13. Click “Start” button. After getting peak, then Result window is appeared.,14. Click “Upper” button. After getting peak then Result window is a
5、ppeared.,Right,Left,15. If the deference between both value are not within 5% of each, then adjust the goniometer height by turning wrench as shown in this picture.,16. Try “Lower Range” and “Upper Range” again till the difference become within 5% of each value.,17. Select “2-theta” of Adjust Button
6、.,18. Set slits and remove Setting Jig on the Goniometer as stated in the window.,DS=0.05mm RS=0.15mm,19. Click “Start” button. After getting peak then result window is appeared.,20. Just click “OK” button.,21. Click “Right Gonio Service” icon,22. Select “Theta” of Adjust Button.,23. Set slits and S
7、etting jig on the goniometer as stated in the window.,DS=0.05mm Setting jig RS=0.15mm,24. Click “Start” button. After getting peak then Result window is appeared.,25. Click “OK” Button. And calibrate the goniometer by clicking “Calibration” button.,26. Select “HV” of Adjust Button.,27. Set slits and
8、 Si standard sample on the goniometer as stated in the window.,DS=1deg Si Standard SS=1deg RS=0.3mm,28. Click “Start” button. After getting peak then Result window is appeared.,29. Click “OK” Button.,30. Select “PHA” of Adjust Button.,31. Click “Start” button. After getting peak then Result window i
9、s appeared.,32. Click “OK” Button.,Daily Adjustment for the goniometer is required just following 2 theta Adjustment. (If you changed some optional sample holder such as Rotational Sample stage, Auto Sample Changer etc, then perform “Theta Adjustment” followed from 22 to 25 as well.),Daily Adjustmen
10、t for XRD-6000,33. Select “2 theta” of Adjust Button.,34. Set slits and remove Jig on the Goniometer as stated in the window,DS=0.05mm RS=0.15mm,35. Click “Start” button. After getting peak then Result window is appeared.,Right,Left,36. If the the peak angle is not less than 0.002deg, then adjust th
11、e goniometer height by turning wrench as shown in this picture.,37. Try “2 Theta Adjustment” again till the peak angle becomes less than 0.002 deg.,Procedure for checking goniometer performance,1. Click “Right Gonio Condition” icon,2. Click “file open” button then “File open” window is appeared. And
12、 select “Kensa” file.,3. Double click “Kensa Si28443” condition.,4. Then “Standard Condition Edit” window is opened.,5. Confirm the all parameters stated in the “Test report”,6. Click “OK” button then “File & Sample Condition Edit” window is appeared.,7. Click “New” button and close this window.,8.
13、Click “Right Gonio Analysis” icon,9. Select “Kensa Si28443” condition and click “Append” button. Repeat selecting appropriate conditions.,10. After selecting all conditions then click “Start” button.,11. Then these condition file are transferred to “Right Gonio System Analysis & spool Program” window.,12. Click “Start” button.,13. Then measurement start and displayed the data on the screen,14. Click “Basic Process” icon,15.Click “XRD Data” icon.,16. Drag and drop the measured data on the “Basic Process” window.,17. Set “System Error Correc
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 企業(yè)培訓(xùn)課件制作app
- 車輛運輸與道路通行證代理合同
- 生態(tài)農(nóng)業(yè)園場地承包與綠色產(chǎn)品開發(fā)合同
- 科技園區(qū)場地租賃印花稅繳納合同
- 餐飲企業(yè)廚房承包與綠色環(huán)保食材采購協(xié)議
- 餐飲企業(yè)員工社會保險與福利待遇合同
- 飼料設(shè)備建設(shè)方案模板
- 應(yīng)急配送設(shè)計方案
- 房屋買賣合同及附屬設(shè)施移交及使用及維護服務(wù)協(xié)議
- 美院雕塑考試題及答案
- 江蘇省南通市部分學(xué)校2025屆數(shù)學(xué)七下期末聯(lián)考試題含解析
- 2025年政治理論時政熱點知識試題庫(附含答案)
- 智能旅游平臺維護合同
- 造粒機銷售合同協(xié)議
- 運動免責(zé)聲明協(xié)議書范本
- 裝修報價單合同協(xié)議
- 聘請合唱團老師合同協(xié)議
- 2024年貴州省凱里市事業(yè)單位公開招聘醫(yī)療衛(wèi)生崗筆試題帶答案
- 河南豫信電科所屬公司招聘筆試題庫2025
- 農(nóng)商行催收培訓(xùn)
- 腦卒中規(guī)范化培訓(xùn)腦出血課件
評論
0/150
提交評論