




下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Control Phase 30-Jul-03,Six Sigma Green Belt,Project Description,Project Title: The coil resistance of X15-150 Green Belt: JB Zhu Department: BEL ME Champion / Manager: BH Koh / KS Park End customer: Seagate,Project Description,Problem Statement: The resistance of X15-150 coil is close to upper limi
2、t per winding result, and customer complained three times the resistance out spec. days. Goal/Objective Statement: Currently, the resistance of X15-150LP coil is close to upper limit. But, since we built small quantity samples every lot, so the readings of resistance are consistent and the Cpk is go
3、od. So I will study the mean at the first stage instead of the Cpk, the target is to make the mean of each winding match the spec. mean. For long term target, it is to make the Ppk greater than 1.5 and the resistance match the spec. mean. Other Benefits: 1. Improve the DPPM and prevent scrap. 2. Imp
4、rove the process capability and eliminate customer complain.,Team Member,NameOrganization JB ZhuME Actuator and coil - Leader/Data analysis CL YangME Actuator - Actuator ME JX GuoME Actuator - Coil Post Zhi Ping LiME Coil - Coil winding LY YangME Coil - Measurement,Update Trend Chart,Below is the la
5、test trend chart. This trend chart is based on the coils are all wound by 0.201mm wire. The target of last time is 5.814, per the baseline which is 5.863 this time, the target does not met. Per this trend chart, update the target as 5.82.,Project Timeline,PhaseDeliverablesPlan Due DateActual Complet
6、e Date DTrend Chart April 2, 2003April 04, 2003 + MFishboneMarch 31, 2003March 29, 2003 GR&RApril 01, 2003April 02, 2003 FMEAApril 08, 2003April 07, 2003 + ATrend ChartApril 30, 2003May 5, 2003 Multi-VariMay 7, 2003May 10, 2003 Hypothesis TestsMay 7, 2003May 10, 2003 ANOVAMay 8, 2003May 12, 2003 + I
7、DOE PlanJune 16, 2003June 16, 2003 DOE AnalysisJune 23, 2003June 23, 2003 Revise SettingTBD + CUpdate Trend ChartJuly 28, 2003July 28, 2003 Process Control PlansJuly 29, 2003July 29, 2003 +,Improve phase result,Recall the result from Improve Phase The KPIVs found from Improve phase are: Coil ID & Wi
8、nding Tension Revised setting 0.201mm wire with 2.5N winding tension Reconfirmation run result. Because we have no 0.200 mm wire on hand so we use 0.201mm wire, and the winding tension is 2.5N to reconfirm the setting. 5.8013-0.2270*0.201+0.119*2.5-0.0167*0.201*2.5=6.044 But the actual resistance is
9、 5.689, that suggest the equation is not adequate, there may be other noise factor which will also affect on the coil resistance.,Process Control Plan,Since number of turns is fixed factor, and the wire ID is determined per each lot wire, so the winding tension is the main KPIV will be monitored in
10、future. Current, the technician tests the winding tension every shift. For wire replacement and program adjustment, will also test the winding tension. Current does not monitor the wire ID per each spool, there is just IQC audit each lot. The technician who is responsible for the product will also r
11、esponsible for the monitoring and take action.,Control Chart,Conclusion,Per the control chart at last page, the UCL is 5.901 and the LCL is 5.826. The coil resistance are all measured at coil winding level. Because the coil leads cant be cut at the right length at coil winding level, there must rema
12、in about 20mm for each lead for coil post process convenience. So the actual resistance will be less than the measured value. Will consider to have a compensation next time when make the trend chart.,Issues / Barriers,The experiments are limited by the wire, the special ID wire must be ordered specially, so the cost will increase largely. And the lead time will be too lo
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 鼻科學解剖學合同
- 車輛抵押貸款服務合同模板下載
- 智能制造企業(yè)代理記賬及智能制造財務合同
- 老人發(fā)熱護理課件
- 消防安全月檢查記錄表
- 路燈安全生產(chǎn)管理制度
- 安全管理資格證書查詢
- 美術課件作品介紹
- 美術人物介紹課件
- 消防安全巡視檢查表
- 職場溝通:職場溝通與人際關系處理(山東管理學院)知到智慧樹章節(jié)答案
- 商業(yè)步行街物業(yè)管理方案
- 日語被動態(tài)練習
- 鋼板樁安全技術交底
- 旅游大數(shù)據(jù)與智慧旅游教學大綱
- 金屬廢棄物生物冶金提取與利用
- 湖南省長沙2024年七年級下冊生物期末試卷附答案
- 2023-2024學年第二學期期末學業(yè)質量檢測八年級語文試卷
- 農村房子繼承人放棄繼承協(xié)議書
- WS 329-2024 麻醉記錄單標準
- 2024-2029全球及中國福利管理系統(tǒng)行業(yè)市場發(fā)展分析及前景趨勢與投資發(fā)展研究報告
評論
0/150
提交評論