![樁帽施工方案_第1頁(yè)](http://file3.renrendoc.com/fileroot_temp3/2022-1/19/1a738477-234f-425d-a352-c548b1a9099d/1a738477-234f-425d-a352-c548b1a9099d1.gif)
![樁帽施工方案_第2頁(yè)](http://file3.renrendoc.com/fileroot_temp3/2022-1/19/1a738477-234f-425d-a352-c548b1a9099d/1a738477-234f-425d-a352-c548b1a9099d2.gif)
![樁帽施工方案_第3頁(yè)](http://file3.renrendoc.com/fileroot_temp3/2022-1/19/1a738477-234f-425d-a352-c548b1a9099d/1a738477-234f-425d-a352-c548b1a9099d3.gif)
![樁帽施工方案_第4頁(yè)](http://file3.renrendoc.com/fileroot_temp3/2022-1/19/1a738477-234f-425d-a352-c548b1a9099d/1a738477-234f-425d-a352-c548b1a9099d4.gif)
![樁帽施工方案_第5頁(yè)](http://file3.renrendoc.com/fileroot_temp3/2022-1/19/1a738477-234f-425d-a352-c548b1a9099d/1a738477-234f-425d-a352-c548b1a9099d5.gif)
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、寧波舟山港梅山保稅港區(qū)1-5#集裝箱泊位工程3-5#泊位樁帽施工方案一.工程概述梅山保稅港區(qū)3#-5#集裝箱碼頭工程屬高樁梁板式結(jié)構(gòu)。碼頭總長(zhǎng)度994.8m,寬度57m,樁基工程采用1200mm預(yù)應(yīng)力混凝土管樁。樁帽共有520只,七種類型,具體尺寸見表1碼頭樁帽參數(shù) 表1序號(hào)類型尺寸(m)數(shù)量一次澆筑高度1ZM15.8×2.6×1.81661.8m2ZM29.2×2.6×1.8831.8m3ZM36.5×5×2432m4ZM3-17×5×271.2m5ZM3-26.85×5×2451.2m6ZM
2、45.7×5×1.81041.8m7ZM55.8×5.6×1.841.8m二.施工和質(zhì)量檢驗(yàn)評(píng)定依據(jù)高樁碼頭設(shè)計(jì)與施工規(guī)范JTJ291-98水運(yùn)工程測(cè)量規(guī)范JTJ203-94水運(yùn)工程混凝土施工規(guī)范JTJ268-96水運(yùn)工程混凝土質(zhì)量控制標(biāo)準(zhǔn)JTJ269-96水運(yùn)工程混凝土試驗(yàn)規(guī)程JTJ270-98水運(yùn)工程質(zhì)量檢驗(yàn)標(biāo)準(zhǔn)JTS 257-2008三.施工總流程施工準(zhǔn)備 測(cè)量放線 圍囹施工 擱柵底板施工 鋼筋施工 模板施工 現(xiàn)澆混凝土施工 混凝土養(yǎng)護(hù)。 四.技術(shù)要點(diǎn)4.1.圍囹施工4.1.1圍囹施工一般工藝流程樁帽圍囹全部采用吊筋反吊鋼圍囹的施工工藝,一般的工藝
3、流程為:施工準(zhǔn)備測(cè)量放線上鋼圍囹上吊筋標(biāo)高調(diào)整固定吊筋螺母固定鋼圍囹。4.1.2圍囹施工ZM1布置雙層槽鋼。上層采用雙拼25a槽鋼, 槽鋼長(zhǎng)6.5m,沿樁帽長(zhǎng)度方向布置。下層采用25a槽鋼,布置在相鄰ZM1同排樁上,構(gòu)成牽杠圍囹,防止樁帽澆筑時(shí)發(fā)生扭曲變形。吊筋采用米字形布置的6根25反吊鋼圍囹。具體見ZM1圍囹布置圖。ZM2采用雙拼32b槽鋼, 槽鋼長(zhǎng)10m,吊筋采用米字形布置的8根28吊筋反吊鋼圍囹。具體見ZM2圍囹布置圖。ZM3圍囹采用雙層槽鋼結(jié)構(gòu)。ZM3與ZM3-1位于同一排,間隔布置,每個(gè)樁帽都有3根相對(duì)位置相同的樁。其中的單樁下層槽鋼與兩側(cè)其中一個(gè)ZM3-1的相應(yīng)樁使用雙拼36a槽
4、鋼構(gòu)成牽杠,吊筋采用8根28圓鋼反吊鋼圍囹。樁帽范圍內(nèi)槽鋼加強(qiáng)處理。上層 槽鋼采用4組雙拼32a槽鋼,兩槽鋼布置在岸側(cè)單樁兩側(cè),海側(cè)雙樁內(nèi)側(cè),兩外兩組槽鋼布置在樁帽邊緣內(nèi)側(cè),間距3.8m,海側(cè)雙樁外側(cè)。吊筋采用8根28圓鋼反吊鋼圍囹。具體見ZM3圍囹布置圖。ZM3-1圍囹采用雙層槽鋼結(jié)構(gòu)。ZM3-1、ZM3位于同一排,間隔布置,每個(gè)樁帽都有3根相對(duì)位置相同的樁。ZM3-1岸側(cè)單樁與ZM3岸側(cè)單樁下層布置17m雙拼36a槽鋼構(gòu)成牽杠圍囹,吊筋采用米字形布置的6根28吊筋反吊鋼圍囹。ZM3-1海側(cè)雙樁下層布置6m雙拼25a槽鋼,吊筋采用米字形布置的6根28吊筋反吊鋼圍囹。在距樁帽邊緣10CM的海側(cè)
5、位置,設(shè)置一組下層雙拼32a槽鋼反吊在上層雙拼36b槽鋼上,用于擱置預(yù)制靠船構(gòu)件。上層槽鋼共四組,其中2組為6.5m 36b槽鋼,另外2組為8m雙拼36b槽鋼。 36b槽鋼布置在岸側(cè)單樁兩側(cè),海側(cè)雙樁內(nèi)側(cè),岸側(cè)伸出樁帽30CM,海側(cè)到預(yù)制靠船構(gòu)件處;雙拼36b槽鋼布置在樁帽邊緣內(nèi)側(cè),間距3.8m,海側(cè)雙樁外側(cè)。海岸側(cè)均伸出樁帽30CM。預(yù)制構(gòu)件沿海岸側(cè)穿孔,采用加強(qiáng)處理的雙拼25a槽鋼從孔中穿過(guò),擱置在下層槽鋼上。岸側(cè)擱置在雙拼25a槽鋼上,海側(cè)擱置在雙拼32a槽鋼上。具體見ZM3-1圍囹布置圖。ZM3-2與ZM3-1結(jié)構(gòu)基本一致,就在海側(cè)比ZM3-1短15CM,因此采用與ZM3-1相同的圍囹
6、系統(tǒng),詳見ZM3-2圍囹布置圖。ZM4有3根樁基,其中雙樁反吊一組雙拼25a槽鋼,吊筋采用米字形布置的4根28圓鋼反吊鋼圍囹。剩余的1根樁與左右兩個(gè)同類型樁帽的相應(yīng)樁使用雙拼36a槽鋼,吊筋采用米字形的8根28圓鋼反吊鋼圍囹。樁帽范圍內(nèi)槽鋼加強(qiáng)處理。具體見ZM4圍囹布置圖。樁帽ZM5圍囹采用雙層槽鋼結(jié)構(gòu)。下層為兩根25a槽鋼,布置在樁帽上下游方向樁的最外側(cè),反吊在上層槽鋼上。上層為4組雙拼槽鋼,兩組為雙拼25a槽鋼,沿上下游方向,分別布置在岸側(cè)單樁的海側(cè)和海側(cè)單樁的岸側(cè),吊筋采用米字形的4根28圓鋼反吊鋼圍囹。另外兩組為雙拼36a槽鋼,沿上下游方向,分別布置在海側(cè)單樁的海側(cè),岸側(cè)單樁的岸側(cè),吊
7、筋采用米字形的6根28圓鋼反吊鋼圍囹。具體見ZM5圍囹布置圖。4.1.3 圍囹施工質(zhì)量要求圍囹應(yīng)具有足夠的強(qiáng)度、剛度和穩(wěn)定性。圍囹施工后及時(shí)復(fù)測(cè)標(biāo)高,注意鋼圍囹標(biāo)高整體一致性。吊筋必須采用雙螺母、雙墊片,并將螺帽與吊筋點(diǎn)焊。吊筋搭接焊長(zhǎng)度和焊接質(zhì)量必須滿足規(guī)范要求,吊筋彎起點(diǎn)與樁角接觸嚴(yán)密。鋼圍囹破損處必須進(jìn)行補(bǔ)強(qiáng)處理。單根橫梁槽鋼應(yīng)為通長(zhǎng)槽鋼,槽鋼接長(zhǎng)時(shí)需破口對(duì)焊并加焊加勁板。若沉樁偏位較大時(shí),需視具體情況做加強(qiáng)處理,應(yīng)及時(shí)與技術(shù)部門聯(lián)系。吊筋割除和修補(bǔ)時(shí)應(yīng)鑿深3cm以上,并及時(shí)進(jìn)行封閉和修補(bǔ)。4.2.鋼筋施工4.2.1鋼筋施工工藝流程鋼筋配料(圍囹、格柵、底板施工)測(cè)量放樣運(yùn)輸?shù)绞┕がF(xiàn)場(chǎng)架
8、立、綁扎、焊接成型 放置砼保護(hù)層墊塊檢查驗(yàn)收。4.2.2 碼頭樁帽鋼筋施工要求1) 鋼筋原材料進(jìn)場(chǎng)必須有質(zhì)保書,經(jīng)母材試驗(yàn)或焊接試驗(yàn)合格后方可配料加工。2) 鋼筋按圖施工,規(guī)格、數(shù)量正確,綁扎整齊、牢固。鋼筋半成品加工所進(jìn)行的彎鉤、折曲或其它加工時(shí),均采用不會(huì)損傷材料的冷彎方式進(jìn)行。級(jí)鋼筋彎頭為半圓形時(shí),其彎曲直徑至少為鋼筋直徑的2.5倍,級(jí)鋼筋末端作90°或135°彎曲時(shí),其彎曲直徑不得小于鋼筋直徑的4倍。3) 焊接數(shù)量和質(zhì)量要符合設(shè)計(jì)和規(guī)范要求。進(jìn)行閃光對(duì)焊前,每批次鋼筋制作進(jìn)行冷彎試驗(yàn),監(jiān)理工程師旁站檢查。試驗(yàn)及檢查合格后投入使用。進(jìn)行搭接焊時(shí),鋼筋接頭做成雙面焊縫或
9、單面焊縫。4) 雙面焊縫長(zhǎng)度不少于5d(d為鋼筋直徑),單面焊縫長(zhǎng)度不少于10d。在焊縫長(zhǎng)度內(nèi)的鋼筋略微彎曲,使焊接成型的鋼筋保持在同一軸線上。焊接接頭位置要求錯(cuò)開。5) 電弧焊所采用的電焊條滿足設(shè)計(jì)及規(guī)范要求,焊縫表面平整,無(wú)明顯凹陷、焊瘤。6) 預(yù)留外伸筋規(guī)格、數(shù)量、尺寸、位置要正確。7) 鋼筋綁扎所用鉛絲頭必須扭入鋼筋骨架內(nèi),在混凝土澆筑前必須墊好保護(hù)層墊塊,確保鋼筋保護(hù)層厚度。鋼筋凈保護(hù)層厚度80mm?;炷翂|塊強(qiáng)度和密實(shí)性必須不低于樁帽混凝土體。8) 由于節(jié)點(diǎn)插筋在樁帽澆筑時(shí)預(yù)埋,要注意節(jié)點(diǎn)插筋的間距、位置和垂直度。9) 清除長(zhǎng)期外露鋼筋表面松脫的熱軋氧化皮鐵銹、油脂或其他物質(zhì)。10
10、) 鋼筋遇預(yù)埋件或安裝預(yù)留孔適當(dāng)移位,并采用鋼筋加強(qiáng)措施。11) 鋼筋制作綁扎偏差按“下表”執(zhí)行。鋼筋制作允許偏差、檢驗(yàn)數(shù)量和方法 序號(hào)項(xiàng)目允許偏差(mm)檢驗(yàn)單元和數(shù)量單元側(cè)點(diǎn)檢驗(yàn)方法1長(zhǎng)度+5,-15每根鋼筋或每片網(wǎng)片(按類別各抽查10%,且不少于10片或10根)1用鋼尺量2彎起鋼筋彎折點(diǎn)位置±2013箍筋邊長(zhǎng)d10mm±42d10mm±104點(diǎn)焊鋼筋網(wǎng)片尺寸長(zhǎng)、寬±102用鋼尺量網(wǎng)眼尺寸±102對(duì)角線差151翹首101放在水平上用鋼尺量鋼筋骨架綁扎與裝設(shè)允許偏差、檢驗(yàn)數(shù)量和方法 序號(hào)項(xiàng)目允許偏差(mm)檢驗(yàn)單元和數(shù)量單元測(cè)點(diǎn)檢驗(yàn)方法1鋼筋
11、骨架外輪廓尺寸長(zhǎng)度+5,-10每個(gè)構(gòu)件(一次性施工的梁、板、樁等小型構(gòu)件抽查10%且不少于3件:大型構(gòu)件逐件檢查2用鋼尺量骨架主筋長(zhǎng)度寬度+5,-103用鋼尺量?jī)啥撕椭胁扛叨?5,-1032受力鋼筋層(排)距±103用鋼尺量?jī)啥撕椭胁咳齻€(gè)斷面,取最大值3受力鋼筋間距±1534彎起鋼筋彎起點(diǎn)位置±202用鋼尺量5箍筋、構(gòu)造筋間距樁±203用鋼尺量?jī)啥撕椭胁窟B續(xù)三檔,取最大值梁±103板±2036固定膠囊套筋位置垂直向+0,-104用鋼尺量中部連續(xù)三檔4.3.模板施工4.3.1模板施工工藝流程模板配料組拼涂刷脫模劑測(cè)量放線鋪設(shè)擱柵、底板、
12、釘三角條及止?jié){條(綁扎鋼筋)立模板模板整體拼接固定螺桿立豎夾條模板調(diào)直加固局部模板縫貼膠帶紙封閉檢查驗(yàn)收。4.3.2模板選用原則1) 為確保工程質(zhì)量,模板采用竹膠板,底模采用30mm厚竹膠板,擱柵采用100mm×150mm木枋,間距200mm。2) 根據(jù)樁帽尺寸,ZM1、ZM2、ZM4、ZM5立模高度均為1.9m;ZM3、ZM3-1、ZM3-2立模高度均為2.1m。3) ZM1、ZM2模板釘50×100mm豎格條木方加強(qiáng),設(shè)置拼裝時(shí)較短邊壓較長(zhǎng)邊釘固。模板豎夾條采用雙拼14槽鋼,橫夾條采用48鋼管,對(duì)拉螺桿設(shè)上下二道,下道16對(duì)拉對(duì)拉螺桿,上道12螺桿和撐拉桿。4) ZM3
13、、ZM3-1、ZM3-2、ZM4、ZM5有倒角,部分模板采用定型模板。模板外側(cè)為橫夾條,采用10槽鋼,間距330mm。橫加條外為豎夾條,采用16槽鋼,間距650mm。豎夾條外側(cè)設(shè)置兩道橫夾條,模板頂部和底部各一道。頂部采用16槽鋼,底部采用雙拼32b槽鋼。對(duì)拉螺桿設(shè)上下二道,模板頂部對(duì)拉螺桿采用16圓鋼,底部螺桿選用32精軋螺紋鋼。詳見樁帽模板結(jié)構(gòu)圖。4.3.3模板施工要求1) 按施工方案進(jìn)行施工。2) 木模板的下料、組拼必須符合質(zhì)量要求。3) 立模允許偏差按規(guī)范有關(guān)標(biāo)準(zhǔn)控制。底部對(duì)拉螺桿需擰雙螺母。4) 模板與預(yù)制構(gòu)件、樁周等接縫處須粘貼PE密封條止?jié){。底板四周應(yīng)釘三角條,三角條下面壓海棉條
14、止?jié){,三角條側(cè)面釘塑料軟管止?jié){。螺桿在混凝土中穿過(guò)的,應(yīng)采用“H”型螺母,確保螺桿割除深度,利于螺桿孔修補(bǔ)。5) 混凝土施工中,避免振搗棒撞擊模板,拆模后要及時(shí)清除模板表面浮漿,并整齊堆放。6) 定期保養(yǎng)維修模板,脫模劑要涂刷均勻。7) 模板制作和安裝允許允許偏差按“下表”執(zhí)行。模板制作的允許偏差、檢驗(yàn)數(shù)量和方法序號(hào)項(xiàng)目允許偏差(mm)檢驗(yàn)單元和數(shù)量單元測(cè)點(diǎn)檢驗(yàn)方法1木模板長(zhǎng)度與寬 度±5每塊模板(逐件檢查)4用鋼尺量相鄰兩板表面錯(cuò)牙11用鋼板尺和楔形塞尺量取大值表 面平整度51用2靠尺和楔形塞尺量取大值2鋼模板長(zhǎng)度與寬 度±2每塊模板(逐件檢查)4用鋼尺量表 面平整度21
15、用2靠尺和楔形塞尺量取大值連接孔眼位置13用鋼尺量抽檢三處現(xiàn)澆構(gòu)件模板安裝允許偏差、檢驗(yàn)數(shù)量和方法序號(hào)項(xiàng)目允許偏差(mm)檢驗(yàn)單元和數(shù)量單元測(cè)點(diǎn)檢驗(yàn)方法1軸線樁帽10每個(gè)構(gòu)件(逐件檢查)2用鋼尺量2前沿線帽梁53用鋼尺量3標(biāo)高樁帽0,-102用水準(zhǔn)儀檢查4截面尺寸樁帽±104用鋼尺量四邊5頂面兩對(duì)角線差短邊3151用鋼尺量短邊32516全高豎向傾斜3H,-101用經(jīng)緯儀或吊線和鋼尺量7側(cè)向彎曲矢高L/1000且不大于251拉線用鋼尺量,取大值8預(yù)埋件、預(yù)留孔位置10每個(gè)預(yù)埋件(抽查10%,且不少于3個(gè))1用鋼尺量4.3.4模板吊安鋼絲繩選取鋼絲繩選用G為1400Mpa的6×
16、19鋼絲繩,安全系數(shù)取5.0,換算系數(shù)取0.82,鋼絲繩與構(gòu)件夾角為60°以上。重量G=2,2點(diǎn)吊,取N=2S=Q/N×1/sin=2/2×1/sin60°=1.15tP=KS=5×1.15=5.75t選用直徑6.2mm鋼絲繩其有效破斷拉力為14.32×1400×0.85=17t5.75t,滿足要求。4.4.混凝土施工根據(jù)工程特點(diǎn),混凝土澆筑選用陸上商品混凝土或攪拌船澆筑?;炷潦┕ひ螅?) 原材料要有質(zhì)保書、檢驗(yàn)報(bào)告,做好配合比設(shè)計(jì)。2) 澆筑混凝土前,應(yīng)檢查模板、支架、鋼筋和預(yù)埋件的正確性,應(yīng)掌握水文氣象預(yù)報(bào)。3) 澆
17、筑混凝土前應(yīng)將模板內(nèi)的木屑、泥水和鋼筋預(yù)埋件上的灰漿、油污清除干凈。4) 混凝土澆筑時(shí)分層下灰,單層厚度不超過(guò)60CM,頂層不超過(guò)30CM。澆筑頂層混凝土?xí)r要準(zhǔn)備一些碎石,當(dāng)頂層混凝土浮漿過(guò)厚時(shí),人工拋灑碎石降低浮漿厚度。5) 混凝土的澆筑應(yīng)連續(xù)進(jìn)行,如因故中斷,其允許產(chǎn)歇時(shí)間應(yīng)在混凝土初凝時(shí)間內(nèi)。6) 澆筑混凝土過(guò)程中,應(yīng)避免混凝土產(chǎn)生離析現(xiàn)象?;炷磷愿咛巸A落時(shí),其自由傾落高度不宜超過(guò)2m 。7) 插入式振搗器至模板的距離不應(yīng)大于振搗器有效半徑的1/2,振搗器應(yīng)垂直插入混凝土中,并快插慢拔,上下抽動(dòng),以利均勻振實(shí),保證上、下層結(jié)合成整體。振搗器應(yīng)插入下層混凝土中不少于50mm。8) 混凝土
18、澆筑完畢后應(yīng)及時(shí)加以覆蓋,結(jié)硬后保濕養(yǎng)護(hù)。養(yǎng)護(hù)方法:不拆側(cè)模直接澆水養(yǎng)護(hù);拆模覆蓋土工布澆水養(yǎng)護(hù)。同時(shí)日澆水養(yǎng)護(hù)次數(shù)必須保證混凝土潮濕為準(zhǔn),混凝土潮濕養(yǎng)護(hù)時(shí)間必須確保在15天以上。9) 必須采用淡水進(jìn)行養(yǎng)護(hù)。10) 混凝土強(qiáng)度未達(dá)到2.5MPa以前,人不得在已澆筑的結(jié)構(gòu)上行走、運(yùn)輸工具或架設(shè)上層結(jié)構(gòu)的支撐和模板。五.職業(yè)健康安全管理措施11) 進(jìn)入施工現(xiàn)場(chǎng)必須戴好安全帽,水上作業(yè)必須穿好救生衣。12) 各道工序所用設(shè)備、電動(dòng)工具使用前必須進(jìn)行絕緣檢測(cè),符合安全使用要求才能使用,并嚴(yán)格遵守安全技術(shù)操作規(guī)程。13) 裝運(yùn)鋼圍囹等所用的鋼絲繩在使用前要進(jìn)行檢查,符合安全要求才能使用。14) 用船裝運(yùn)
19、施工材料要核實(shí)重量,禁止超載,并妥善放置,以免船只搖晃而發(fā)生傾瀉。15) 圍囹、鋼筋、模板在收工前必須加固完畢, 鋪底板要隨鋪隨釘不留活動(dòng)板。16) 木工作業(yè)、鋼筋作業(yè),混凝土澆注作業(yè)、電焊(氣割)作業(yè)均必須遵守各工種的安全技術(shù)操作規(guī)程。17) 夜間作業(yè)時(shí)照明必須充分,并不準(zhǔn)一個(gè)作業(yè)點(diǎn)上單人作業(yè)。18) 加工好的成品、半成品應(yīng)按規(guī)格品種分別堆放整齊、穩(wěn)當(dāng),防止傾倒和塌落。19) 在綁扎底層鋼筋時(shí),在潮水漲上前要盡量綁扎完,未綁扎完的鋼筋要避免被涌浪打落下落的措施。20) 綁扎上層鋼筋時(shí)要設(shè)置支撐,作業(yè)人員不要集中在一起操作,間距較大時(shí)要鋪設(shè)35mm厚以上的木板,以免踏空傷人。21) 嚴(yán)禁在鋼筋
20、上和銳利物上拖拉電源線,防止電源線碰破和拉斷。22) 作業(yè)人員不得站在側(cè)?;蛑紊喜僮鳌?3) 模板夾條不得使用腐朽,扭裂,劈裂的木材。24) 立模時(shí)模板應(yīng)就位一塊臨時(shí)固定一塊。上部立模時(shí)應(yīng)掛外掛架,模板應(yīng)從上往下傳遞,下面禁止有人。25) 拆除模板應(yīng)按順序進(jìn)行,嚴(yán)禁猛撬硬敲或拉倒,完工前不得留有松動(dòng)和懸掛的模板。26) 用輸送泵送混凝土,管子接頭應(yīng)接牢,管子的架子必須牢固。船上送混凝土必須用人把住下灰口時(shí),最好用繩子。指揮人員要注意海面涌泥,通知有關(guān)人員及時(shí)避讓,以防止晃動(dòng)撞擊上人。27) 輸水皮管盡量不要從用電設(shè)備、電箱旁邊通過(guò),以免皮管漏水而淋濕跑電。28) 在結(jié)構(gòu)上養(yǎng)護(hù)人員需要上下時(shí),
21、不能隨身拖帶輸水皮管。29) 吊機(jī)、電焊機(jī)等用電設(shè)備使用前必須進(jìn)行絕緣檢測(cè),使用時(shí)必須遵守該設(shè)備的安全技術(shù)操作規(guī)程。30) 安裝鋼圍囹指要有人觀察海面涌來(lái)浪情況,以免潑打構(gòu)件落?;蜃矒羯先?。31) 多人合運(yùn)鋼筋,起、落、轉(zhuǎn)、停要聽從指揮,動(dòng)作要一致;人工上下立體傳送不得在同一垂直線上。六、圍囹、模板計(jì)算書1計(jì)算主要參數(shù)1.1 允許撓度:跨中f/ L=1/250、懸臂f/ L= 1/4001.2 鋼材允許抗彎和抗拉強(qiáng)度:= 1.7×105KN/m21.3 木材允許抗彎和抗拉強(qiáng)度:= 9×103KN/m21.4 鋼材彈性模量E=2.1×108KN/m21.5 木材彈性
22、模量E=2.0×107KN/m22 圍囹計(jì)算2.1 ZM1強(qiáng)度驗(yàn)算(a)跨中驗(yàn)算:樁帽跨中最大間距L=3mq=25×1.8×1.3×1.2=70.2 KN/mM =1/8qL2 =1/8×70.2×32=79 KN·m W= M /=79/(1.7×105)=4.64×10-4m3故選用雙拼25a,W=2×2.7×10-4 =5.4×10-4m3>W,滿足要求 撓度驗(yàn)算:f=5qL4/384EI=5×70.2×34/(384×2.1
23、5;108×2×3369×10-8) =5.23×10-4m<L/250=12×10-3m滿足要求(b)懸臂驗(yàn)算:ZM1懸臂長(zhǎng)度為1.4mq=25×1.8×1.3×1.2=70.2 KN/mM =1/2qL2 =1/2×70.2×1.42=69 KN·m W= M /=69/(1.7×105)=4.04×10-4m3 雙拼25a滿足條件撓度驗(yàn)算:f=qL4/8EI=70.2×1.44/(8×2.1×108×2×
24、3369×10-8) =2.38×10-4m<L/400=7.5×10-3m 滿足要求(c)吊筋計(jì)算:?jiǎn)螛冻休d力F=25×2.6×2.9×1.8×1.2=407KN選用2根25精軋螺紋鋼:2×490×980=960KN滿足要求2.2 ZM2強(qiáng)度驗(yàn)算(a)跨中驗(yàn)算:樁帽跨中最大間距L=5.4mq=25×1.7×1.3×1.2=66.3 KN/mM =1/8qL2 =1/8×66.3×5.42=241 KN·m W= M /=241/(1.7&
25、#215;105)=1.41×10-3m3故選用雙拼36b,W=2×7.03×10-4 =14.06×10-4m3>W,滿足要求 撓度驗(yàn)算:f=5qL4/384EI=5×66.3×5.44/(384×2.1×108×2×12651×10-8) =0.014m=5.4/250=0.022m滿足要求(b)懸臂驗(yàn)算:ZM2最大懸臂長(zhǎng)度為2m,q=25×1.7×1.3×1.2=66.3 KN/mM =1/2qL2 =1/2×66.3×22
26、=132 KN·m W= M /=132/(1.7×105)=7.8×10-4m3雙拼36b滿足條件撓度驗(yàn)算:f=qL4/8EI=66.3×24/(8×2.1×108×2×12651×10-8) =2.5×10-3m<L/400=5×10-3m 滿足要求滿足要求(c)精軋螺紋鋼計(jì)算:?jiǎn)螛冻休d力F=25×19.2×1.2=576KN選用2根25精軋螺紋鋼筋:2×490×980=960KN滿足要求2.3 ZM4強(qiáng)度驗(yàn)算1.岸側(cè)兩根樁計(jì)算:(a)
27、跨中驗(yàn)算:跨中最大間距L=1.2mq=25×1.8×1.45×1.2=78.3KN/mM =1/8qL2 =1/8×78.3×1.22=14.1KN·m W= M /=14.1/(1.7×105)=8.3×10-5m3故選用雙拼25a,W=2×2.69×10-4 =5.38×10-4m3>W,滿足(b)撓度驗(yàn)算:f=5qL4/384EI=5×78.3×1.24/(384×2.1×108×2×3369.2×10-
28、8) =1.5×10-4m<L/250=4.8×10-3m(c)懸臂驗(yàn)算:懸臂長(zhǎng)度為0.7m,q=25×1.8×1.45×1.2=78.3KN/mM =1/2qL2 =1/2×78.3×0.72=19.2KN·m W= M /=19.2/(1.7×105)=1.13×10-4m3雙拼25a滿足條件撓度驗(yàn)算:f=qL4/8EI=78.3×0.74/(8×2.1×108×2×3369.6×10-8) =1.7×10-4m&l
29、t;L/400=1.8×10-3m 滿足要求(d)單樁承載力F=25×1.8×5×2.9×1.2/2=392KN選用400KN鋼抱箍2.海側(cè)單樁計(jì)算(a)懸臂驗(yàn)算:懸臂長(zhǎng)度為1.9m,q=25×1.8×1.45×1.2=78.3KN/mM =1/2qL2 =1/2×78.3×1.92=141.4KN·m W= M /=141.4/(1.7×105)=8.32×10-4m3故選用雙拼36a,W=2×6.60×10-4 =1.32×10-3
30、m3>W,滿足撓度驗(yàn)算:f=qL4/8EI=78.3×1.94/(8×2.1×108×2×11874.2×10-8) =2.6×10-3m<L/400=4.75×10-3m 滿足要求(d)吊筋計(jì)算:?jiǎn)螛冻休d力F=25×23.5×1.2=705KN選用8根28吊筋可承載的力為:3.14×(0.027)2/4×2.1×105×sin60×8=832KN滿足要求2.4 ZM5強(qiáng)度驗(yàn)算1.槽鋼驗(yàn)算(a)海側(cè)單樁海側(cè)槽鋼布置:懸臂長(zhǎng)度2.2mq
31、=25×1.8×1.4×1.2=75.6KN/mM =1/2qL2 =1/2×75.6×2.22=183KN·mW= M /=183/(1.7×105)=1.08×10-3m3選用雙拼36a:W=2×6.6×10-4 =1.32×10-3m3>W,滿足要求撓度驗(yàn)算:f=qL4/8EI=75.6×2.24/(8×2.1×108×2×12700×10-8) =4.15×10-3m<L/400=5.5×
32、;10-3m 滿足要求(b)海側(cè)單樁岸側(cè)槽鋼布置:跨中間距1.8mq=25×1.8×1.5×1.2=81KN/mM =1/8qL2 =1/8×81×1.82=32.8KN·m W= M /=32.8/(1.7×105)=1.93×10-4m3選用雙拼25a,W=2×2.69×10-4 =5.38×10-4m3>W,滿足要求同理,岸側(cè)單樁岸側(cè)布置雙拼36a槽鋼,岸側(cè)單樁海側(cè)布置雙拼25a槽鋼下層槽鋼選用雙拼25a,作為加強(qiáng)槽鋼結(jié)構(gòu)穩(wěn)定性處理。2.吊筋計(jì)算(a)中間兩根樁吊筋計(jì)算:?jiǎn)?/p>
33、樁承載力F=25×13×1.2/4=390KN選用4根28吊筋可承載的力為:3.14×(0.027)2/4×2.1×105×sin60×4=417KN滿足要求(b)海岸側(cè)兩根樁吊筋計(jì)算:?jiǎn)螛冻休d力F=25×18×1.2=540KN選用6根28吊筋可承載的力為:3.14×(0.027)2/4×2.1×105×sin60×6=624KN滿足要求2.5 ZM3強(qiáng)度驗(yàn)算(a)下層懸臂驗(yàn)算:ZM3最大懸臂長(zhǎng)度為1.8mF=25×1.45×1.5&
34、#215;2×1.2=130.5KNM =FL =130.5×1.8=235KN·m W= M /=235/(1.7×105)=1.38×10-3m3選用雙拼36b,W=2×7×10-4 =1.4×10-3m3>W,滿足條件撓度驗(yàn)算:f= FL3/3EI =130.5×1.83/(3×2.1×108×2×12651×10-8) =4.75×10-3mL/400=4.5×10-3m 基本滿足要求(b)上層跨中驗(yàn)算:橫梁跨中最大間距L
35、=2.3m,q=25×1.9×1.3×1.2=74.1KN/mM =1/8qL2 =1/8×74.1×2.32=48.9KN·m W= M /=48.9/(1.7×105)=2.88×10-4m3故選用雙拼25a,W=2×2.70×10-4 =5.4×10-4m3>W,滿足撓度驗(yàn)算:f=5qL4/384EI=5×74.1×2.34/(384×2.1×108×2×3369.6×10-8) =1.9×10
36、-3m<L/250=6.8×10-3m(c)上層懸臂驗(yàn)算:ZM3最大懸臂長(zhǎng)度為2.3m,q=25×2.3×1.3×1.2=89.7KN/mM =1/2qL2 =1/2×89.7×2.32=237KN·m W= M /=237/(1.7×105)=1.39×10-3m3雙拼36b, W=2×7×10-4 =1.4×10-3m3>W,滿足條件撓度驗(yàn)算:f=qL4/8EI=89.7×2.34/(8×2.1×108×2×1
37、2651×10-8) =5.9×10-3mL/400=5.8×10-3m 基本滿足要求所以上層圍囹選用雙拼36b。(d)鋼抱箍計(jì)算:?jiǎn)螛蹲畲蟪休d力F=25×24.6×1.2=738KN選用2個(gè)400KN鋼抱箍,滿足要求海側(cè)兩根樁計(jì)算:?jiǎn)螛蹲畲蟪休d力F=25×18×1.2=540KN選用2個(gè)400KN鋼抱箍,滿足要求2.6 ZM3-1強(qiáng)度驗(yàn)算ZM3-1分2次澆筑,第一次澆筑高度1.2m。第2次澆筑高度0.8m。(a)上層跨中驗(yàn)算:跨中最大間距L=1.7mq=25×1.2×1.3×1.2=46.8K
38、N/mM =1/8qL2 =1/8×46.8×1.72=16.9KN·m W= M /=16.9/(1.7×105)=1×10-4m3故選用單根32b,W=5.09×10-4 m3>W,滿足要求撓度驗(yàn)算:f=5qL4/384EI=5×46.8×1.74/(384×2.1×108×8140×10-8) =2.98×10-4m<L/250=6.8×10-3m滿足要求,考慮上下游兩根承受靠船構(gòu)件槽鋼采用36b,為保證頂標(biāo)高相同,所以上層全采用36b槽
39、鋼。(b)上層懸臂驗(yàn)算:ZM3-1最大懸臂長(zhǎng)度為2.2m承擔(dān)KG1單根槽鋼海側(cè)擱置點(diǎn)受力F海1.94×F海=(5.38+2.5×1.2×1.2)×25/2×1.34F海=77.5KN沿海岸測(cè)上層槽鋼與3號(hào)槽鋼即承擔(dān)KG1槽鋼擱置槽鋼單處受力F上游= F海=77.5KNq=25×1.2×1.3×1.2=46.8KN/mM =1/2qL2+FL=1/2×46.8×2.22+77.5×2.2=283.8KN·m W= M /=283.8/(1.7×105)=1.67
40、15;10-3m3三拼36b, W=3×7.03×10-4 =2.11×10-3m3>W,滿足條件撓度驗(yàn)算:f=qL4/8EI+FL3/3EI=46.8×2.24/(8×2.1×108×3×12700×10-8)+ 77.5×2.23 /(3×2.1×108×3×12700×10-8)=5.15×10-3m<L/400=5.5×10-3m滿足要求(c)岸側(cè)單樁下層懸臂驗(yàn)算:ZM3-1最大懸臂長(zhǎng)度為1.7m,F(xiàn)=25
41、×4.9×1.2=147KNM =FL =147×1.7=250KN·m W= M /=250/(1.7×105)=1.47×10-3m3選用雙拼36b, W=2×7.03×10-4 =1.406×10-3m3>W,基本滿足條件撓度驗(yàn)算:f=FL3/3EI=147×1.73/(3×2.1×108×2×12651×10-8) =4.53×10-3m<L/400=4.25×10-3m 基本滿足要求用雙拼36b,滿足要求
42、。(f)吊筋計(jì)算:?jiǎn)螛蹲畲蟪休d力F=25×18×1.2=540KN 選用2個(gè)400KN鋼抱箍,滿足要求海側(cè)兩根樁吊筋計(jì)算:?jiǎn)胃鶚蹲畲蟪休d力F=(25×25+134.5)×1.2/2=456KN選用1個(gè)400KN鋼抱箍,滿足要求2.7 ZM3-2強(qiáng)度驗(yàn)算ZM3-2分2次澆筑,第一次澆筑高度1.2m。第2次澆筑高度0.8m。(a)上層跨中驗(yàn)算:跨中最大間距L=1.7mq=25×1.2×1.3×1.2=46.8KN/mM =1/8qL2 =1/8×46.8×1.72=16.9KN·m W= M /=1
43、6.9/(1.7×105)=1×10-4m3故選用單根32b,W=5.09×10-4 m3>W,滿足要求撓度驗(yàn)算:f=5qL4/384EI=5×46.8×1.74/(384×2.1×108×8140×10-8)=2.98×10-4m<L/250=6.8×10-3m滿足要求,考慮上下游兩根承受靠船構(gòu)件槽鋼采用36b,為保證頂標(biāo)高相同,所以上層全采用36b槽鋼。(b)上層懸臂驗(yàn)算:ZM3-2最大懸臂長(zhǎng)度為2.05m承擔(dān)KG1單根槽鋼海側(cè)擱置點(diǎn)受力F海1.8×F海=(6
44、.58+2.8×1.2×1.2)×25/2×1.2F海=88.4KN沿海岸測(cè)上層槽鋼與3號(hào)槽鋼即承擔(dān)KG1槽鋼擱置槽鋼單處受力F上游= F海=88.4KNq=25×1.2×1.3×1.2=46.8KN/mM =1/2qL2+FL=1/2×46.8×2.052+88.4×2.05=280KN·m W= M /=280/(1.7×105)=1.64×10-3m3三拼36b, W=3×7.03×10-4 =2.11×10-3m3>W,滿
45、足條件撓度驗(yàn)算:f=qL4/8EI+FL3/3EI=46.8×2.054/(8×2.1×108×3×12700×10-8)+ 88.4×2.053 /(3×2.1×108×3×12700×10-8)=4.46×10-3m<L/400=5.1×10-3m滿足要求(c)岸側(cè)單樁下層懸臂驗(yàn)算:ZM3-1最大懸臂長(zhǎng)度為1.5m,F(xiàn)=25×4.9×1.2=147KNM =FL =147×1.5=220.5KN·m W=
46、M /=220.5/(1.7×105)=1.3×10-3m3選用雙拼36a, W=2×6.59×10-4 =1.32×10-3m3>W,滿足條件撓度驗(yàn)算:f=FL3/3EI=147×1.53/(3×2.1×108×2×11874.2×10-8) =3.32×10-3m<L/400=3.75×10-3m 滿足要求用雙拼36a,滿足要求。(f)吊筋計(jì)算:?jiǎn)螛蹲畲蟪休d力F=25×18×1.2=540KN 選用6根28吊筋可承載的力為:3.1
47、4×(0.027)2/4×2.1×105×sin60×6=625KN滿足要求海側(cè)兩根樁吊筋計(jì)算:?jiǎn)胃鶚蹲畲蟪休d力F=(25×24+164.5)×1.2/2=459KN選用6根25吊筋可承載的力為:3.14×(0.024)2/4×2.1×105×sin60×6=493KN滿足要求3圍囹木強(qiáng)度驗(yàn)算(a)跨中驗(yàn)算:圍囹木布置間距為20cm,跨中最大間距為1.2m。q=25×1.65×0.2×1.2=10 KN/mM =1/8qL2 =1/8×
48、10×1.22=1.8 KN·m W= M /=1.8/(9×103)=2×10-4m3選用10×15方木,W=1/6bh2=1/6×0.1×0.152=3.75×10-4m3>W,滿足(b)懸臂驗(yàn)算:方木懸臂長(zhǎng)度為0.7m,q=25×1.8×0.2×1.2=10.8 KN/mM =1/2qL2 =1/2×10.8×0.72=2.65KN·m W= M /=2.65/(9×103)=2.95×10-4m310×15方木滿
49、足條件。(c)允許最大跨度、最大懸臂:M=W×=3.75×10-4×9×103=3.375 KN·m L=(8 M/q) 1/2=1.58 m最大懸臂為0.79m4模板強(qiáng)度驗(yàn)算ZM1模板(1)模板側(cè)壓力Pmax=8Ks+24KtV1/2攪拌船砼澆筑速度為45m3/h,所以V=45/(2.6×5.8)=2.984m/hKs=2.0,Kt=1.53(5)Pmax=8×2.0+24×1.53×2.9841/2=79.43 KN/m2h= Pmax/r=79.43/25=3.17mp= Pmax ×1.
50、8/3.17=45 KN/m2重心位置:h0=1.8/3=0.6m(2)螺桿計(jì)算模板高度為1.85m (a)海岸側(cè)封頭模板側(cè)壓力P側(cè)=45×2.6×1.8/2=105.3KN下層沿海岸側(cè)方向單根螺桿受力P下=2/3×P側(cè)×1/2=35KN單根25螺桿允許受拉力:F=3.14×0.025×0.025/4×170000=83.4KN滿足要求則上層螺桿受力P上= P側(cè)- P下=105.3-35×2=35.3KN選用4根16螺桿P=/4×0.0152×1.7×105×4=120 KN
51、>P上(b)上下游模板側(cè)壓力P側(cè)=45×5.8×1.8/2=235KN下層沿上下游方向單根螺桿受力P下=2/3×P側(cè)×1/2=78.3KN單根25螺桿允許受拉力:F=3.14×0.025×0.025/4×170000=83.4KN滿足要求則上層螺桿受力P上= P側(cè)- P下=235-83.4×2=68.2KN選用4根16螺桿P=/4×0.0152×1.7×105×4=120 KN>P上ZM2模板(1)模板側(cè)壓力Pmax=8Ks+24KtV1/2攪拌船砼澆筑速度為45
52、m3/h,所以V=45/(2.6×9.2)=1.88m/hKs=2.0,Kt=1.53(5)Pmax=8×2.0+24×1.53×1.881/2=66.3 KN/m2h= Pmax/r=66.3/25=2.65mp= Pmax ×1.8/2.65=45 KN/m2重心位置:h0=1.8/3=0.6m(2)螺桿計(jì)算模板高度為1.85m (a)海岸側(cè)封頭模板側(cè)壓力P側(cè)=45×2.6×1.8/2=105.3KN下層沿海岸側(cè)方向單根螺桿受力P下=2/3×P側(cè)×1/2=35KN單根25螺桿允許受拉力:F=3.14&
53、#215;0.025×0.025/4×170000=83.4KN滿足要求則上層螺桿受力P上= P側(cè)- P下=105.3-35×2=35.3KN選用4根16螺桿P=/4×0.0152×1.7×105×4=120 KN>P上(b)上下游模板側(cè)壓力P側(cè)=45×9.2×1.8/2=372.6KN下層沿上下游方向單根螺桿受力P下=2/3×P側(cè)×1/2=124.2KN單根25螺桿允許受拉力:F=3.14×0.025×0.025/4×170000=83.4KN不滿
54、足要求單根30螺桿允許受拉力:F=3.14×0.03×0.03/4×170000=120KN基本滿足要求則上層螺桿受力P上= P側(cè)- P下=372.6-124.2×2=124.2KN選用6根16螺桿P=/4×0.0152×1.7×105×6=180 KN>P上ZM3模板(1)模板側(cè)壓力Pmax=8Ks+24KtV1/2攪拌船砼澆筑速度為45m3/h,所以V=45/(5×6.5-1.2×1.2)=1.45m/hKs=2.0,Kt=1.53(5)Pmax=8×2.0+24×
55、1.53×1.451/2=60.2 KN/m2h= Pmax/r=60.2/25=2.4mp= Pmax ×2/2.4=50 KN/m2重心位置:h0=2/3=0.67m(2)螺桿計(jì)算模板高度為2.1m (a)海岸側(cè)封頭模板側(cè)壓力P側(cè)=50×5×2/2=250KN下層沿海岸側(cè)方向單根螺桿受力P下=2/3×P側(cè)×1/2=83.3KN單根25螺桿允許受拉力:F=3.14×0.025×0.025/4×170000=83.4KN滿足要求則上層螺桿受力P上= P側(cè)- P下=250-83.3×2=83.4K
56、N選用4根16螺桿P=/4×0.0152×1.7×105×4=120 KN>P上(b)上下游模板側(cè)壓力P側(cè)=50×6.5×2/2=325KN下層沿上下游方向單根螺桿受力P下=2/3×P側(cè)×1/2=108.3KN單根25螺桿允許受拉力:F=3.14×0.025×0.025/4×170000=83.4KN不滿足要求單根30螺桿允許受拉力:F=3.14×0.03×0.03/4×170000=120KN基本滿足要求則上層螺桿受力P上= P側(cè)- P下=325-
57、108.3×2=108.4KN選用6根16螺桿P=/4×0.0152×1.7×105×6=180 KN>P上ZM3-1模板(1)模板側(cè)壓力Pmax=8Ks+24KtV1/2攪拌船砼澆筑速度為45m3/h,所以V=45/(5×7-1.2×1.2)=1.34m/hKs=2.0,Kt=1.53(5)Pmax=8×2.0+24×1.53×1.341/2=58.5 KN/m2h= Pmax/r=58.5/25=2.34mp= Pmax ×1.2/2.34=30 KN/m2重心位置:h0=1.2/3=0.4m(2)螺桿計(jì)算模板高度為2.1m (a)海岸側(cè)封頭模板側(cè)壓力P側(cè)=30×5×1.2/2=90KN下層沿海岸側(cè)方向單根螺桿受力P下=90×1.7
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 五年級(jí)數(shù)學(xué)口算題
- 青島版數(shù)學(xué)七年級(jí)上冊(cè)5.2《代數(shù)式》聽評(píng)課記錄
- 魯教版地理六年級(jí)下冊(cè)6.2《自然環(huán)境》聽課評(píng)課記錄3
- 蘇教版三年級(jí)下冊(cè)《兩位數(shù)乘整十?dāng)?shù)的口算》教案
- 委托經(jīng)營(yíng)管理協(xié)議書范本
- 蘇州蘇教版三年級(jí)數(shù)學(xué)上冊(cè)《周長(zhǎng)是多少》聽評(píng)課記錄
- 產(chǎn)品銷售合作協(xié)議書范本(代理商版本)
- 書稿專用版權(quán)合同范本
- 酒店房屋出租辦公經(jīng)營(yíng)協(xié)議書范本
- 部編版道德與法治九年級(jí)下冊(cè)《1.2復(fù)雜多變的關(guān)系》聽課評(píng)課記錄
- 2025年中國(guó)黃芪提取物市場(chǎng)調(diào)查研究報(bào)告
- 七年級(jí)英語(yǔ)閱讀理解55篇(含答案)
- 管理ABC-干嘉偉(美團(tuán)網(wǎng)COO)
- 肉制品加工技術(shù)完整版ppt課件全套教程(最新)
- (中職)Dreamweaver-CC網(wǎng)頁(yè)設(shè)計(jì)與制作(3版)電子課件(完整版)
- 東南大學(xué) 固體物理課件
- 行政人事助理崗位月度KPI績(jī)效考核表
- 紀(jì)檢監(jiān)察機(jī)關(guān)派駐機(jī)構(gòu)工作規(guī)則全文詳解PPT
- BP-2C 微機(jī)母線保護(hù)裝置技術(shù)說(shuō)明書 (3)
- 硫酸分公司30萬(wàn)噸硫磺制酸試車方案
- 電子電路基礎(chǔ)習(xí)題解答
評(píng)論
0/150
提交評(píng)論