


下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、解讀高層建筑二級(jí)負(fù)荷消防設(shè)備設(shè)計(jì)Interpretation of the high-rise building fire equipment secondary loaddesign高層修建依據(jù)其運(yùn)用性質(zhì)、火災(zāi)風(fēng)險(xiǎn)司長(zhǎng)、分散和補(bǔ)救難度等進(jìn)行分類(lèi)。1O18層住所應(yīng)屬二類(lèi)高層修建。其間首要通道和樓梯間照明用電、客梯用電、排污泵和日子水泵用電為二級(jí)負(fù)荷,其消防用電負(fù)荷:消防操控室、火災(zāi)主動(dòng)報(bào)警及聯(lián)動(dòng)操控設(shè)備以及閥門(mén)等用電應(yīng)為二級(jí)負(fù)荷。High-rise building according to the use of nature, fire risk, director of classify,
2、 dispersion and remedial difficulty. 1 o 18 floors residence should belong to the category of high-rise building. During the primary channel and stair illume, passenger lift pump, sewage pump, and days for electricity utilization secondary load, and its fire load: active alarm and fire control room,
3、 fire linkage control equipment and valves, etc. Electricity should be the secondary load.高層住所宜在底層或地下一層設(shè)置10(6)0.4kV戶內(nèi)變電所或在室外設(shè)置預(yù)裝式變電站。變壓器低壓側(cè)電壓為0.4kV時(shí)。單臺(tái)變壓器容量不宜大于1250kVA 預(yù)裝式變電站變壓器,單臺(tái)容量不宜大于800kYA。二級(jí)負(fù)荷供電體系停電影響較大,宜由兩回路供電,供電變壓器也宜選兩臺(tái)(兩臺(tái)變壓器可不在同一變電所)。當(dāng)線路自上一級(jí)配電所用電纜引來(lái)時(shí)有必要選用兩根電纜組成的電纜線路。其每根電纜應(yīng)能接受 100的二級(jí)負(fù)荷。且互為熱備用
4、。High-rise residence should be set on the ground floor or underground 10 (6) / 0.4 kV indoor substation or in the outdoor setting preinstalled type transformer substation. When the voltage is 0.4 kV transformer low voltage side. Single transformer capacity should not be greater than 1250 kva preinst
5、alled type transformer substation, single capacity should not be greater than 800 kya. Secondary load influence on power system blackouts, and appropriate by the two circuits of power supply, power supply transformer and appropriate chooses two (two are not in the same substation transformer). When
6、used cable line from the upper level distribution cause it necessary to use two cables of cable line. The each cable should be able to accept 100% of the secondary load. And hot standby each other.JGJ162008民用修建電氣設(shè)計(jì)規(guī)范(以下簡(jiǎn)稱(chēng)新民partition, unfavorable branch lines across the fire zone.高層修建二級(jí)負(fù)荷消防設(shè)備設(shè)計(jì),二類(lèi)高層寓
7、居修建中火災(zāi)主動(dòng)報(bào)警維護(hù)目標(biāo)分級(jí)為二級(jí),所以此類(lèi)修建物內(nèi)消防設(shè)備供電干線及分支干線,應(yīng)選用有機(jī)絕緣耐火銅芯電力電纜,其分支線路和操控線路,系結(jié)尾雙電源切換箱放射式至相應(yīng)消防設(shè)備的線路,它們同在一個(gè)防火分區(qū)內(nèi)且線路較短,當(dāng)采納必定防火辦法如穿管暗敷防水板,宜選用與消防供電干線或分支干線耐火等級(jí)降一類(lèi)的電線或電纜即阻燃型銅芯電線或電纜。High-rise building fire equipment secondary load design, second class upper walls built in alarm active fire maintenance target class
8、ification for level 2, so this kind of building material in fire equipment supply main and branch lines, should choose organic insulating refractory copper power cable, the branch circuit and control circuit, the radial end is double the power switch box to corresponding fire control equipment of th
9、e line, they present a fireproof partition and short circuit, when adopted must fire protection measures such as wearing dark apply, appropriate chooses and fire power supply main trunk or branch rated drop type of wire or cable that is flame retardant copper wire or cable.有機(jī)絕緣耐火銅芯電力電纜在電氣豎井內(nèi)或電纜溝內(nèi)敷設(shè)時(shí)
10、可不穿導(dǎo)管維護(hù),但應(yīng)采納與非消防用電電纜阻隔辦法;選用明敷、吊頂內(nèi)敷設(shè)或架空地板內(nèi)敷設(shè)時(shí),應(yīng)穿金屬導(dǎo)管或封閉式金屬線槽維護(hù),且維護(hù)管或線槽應(yīng)采納涂防火涂料等防火辦法:當(dāng)線路暗敷時(shí) 應(yīng) 穿金屬導(dǎo)管或難燃型剛性塑料導(dǎo)管維護(hù)鍋爐出渣機(jī),并應(yīng)敷設(shè)在不焚燒布局內(nèi),且維護(hù)層厚度不小于30mm。Organic insulating refractory copper power cable or cable laying in the electrical shaft can not wear catheter maintenance, but should be adopted with the fire
11、 power cable cut off; Choose Ming fu, ceiling installation or overhead floor laying, should wear metal conduit or enclosed metal trough maintenance, and maintenance of fire retardant coating tube or slot should be adopted, such as fire prevention measures: when the line is dark apply. Should wear metal conduit
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 零售快消品行業(yè)庫(kù)存管理優(yōu)化方案
- 電商物流配送無(wú)人機(jī)項(xiàng)目可行性報(bào)告
- 三農(nóng)村林業(yè)資源保護(hù)與管理方案
- 縣域農(nóng)村污水治理可行性研究報(bào)告
- 醫(yī)療機(jī)構(gòu)內(nèi)部溝通與協(xié)作指南
- 有機(jī)蔬菜種植可行性報(bào)告
- 車(chē)輛調(diào)度系統(tǒng)操作手冊(cè)
- 項(xiàng)目進(jìn)展匯報(bào)與未來(lái)規(guī)劃陳述
- 金融行業(yè)風(fēng)險(xiǎn)評(píng)估和管理模型構(gòu)建研究方案設(shè)計(jì)
- 無(wú)線傳感器網(wǎng)絡(luò)設(shè)備手冊(cè)
- ISO22000培訓(xùn)知識(shí)基礎(chǔ)課件
- GCP原則及相關(guān)法律法規(guī)課件
- 厚樸種苗質(zhì)量分級(jí)DB50-T 1259-2022
- 我的家鄉(xiāng)新疆-我愛(ài)你課件
- 液化天然氣(LNG)相關(guān)的知識(shí)培訓(xùn)
- 施工升降機(jī)安全管理培訓(xùn)課件
- 2017華東六省一市優(yōu)質(zhì)課課件連乘問(wèn)題11月29日
- 部編版(統(tǒng)編)一年級(jí)語(yǔ)文下冊(cè)每課練習(xí)題(全冊(cè)全套)
- DB62∕T 4134-2020 高速公路服務(wù)區(qū)設(shè)計(jì)規(guī)范
- 《影視鑒賞(第二版)》課件2-0故事片引子
- 青島版科學(xué)一年級(jí)下冊(cè)《塑料》教學(xué)設(shè)計(jì)
評(píng)論
0/150
提交評(píng)論