

下載本文檔
版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、4,000,000 tons laterite-nickel ore Project inIndonesia Feasibility Study ReportChapter 1 General Introduction1.1 Overview of the project . 71.2 Research conclusions of the project established.:. .81.2.1 Market prospects.81.2.2 Supply of the raw material. . . 81.2.3 Policy protection. . .91.2.4 Capit
2、al assuranee.91.2.5 Organization guarantee. . . . . 91.2.6 Tech ni cal support.91.2.7 HR buildi ng. . 91.2.8 Risk control. .101.2.9 Financial Benefit conclusion.111.2.10 Social benefits conclusion.111.2.11Feasibility compositive estimation of the projectestablished. . 111.3 Main technical and econom
3、ic indexes.11Chapter 2 Background of the Project2.1 The background of construction. . .132.2 The necessity of construction.132.3The feasibility of construction.132.3.1 Economic feasibility232. Policyfeasibility. .14233. Technical feasibility. 142.3.4 Model feasibility. .142.3.5 Organization and HR f
4、easibility. .15Chapter 3 Project Analysis and Forecasting3.1 The market scale survey. .153.2The market compete nee survey.163.3 The market prospect forecasting.173.4 The product schemes and con structi on scale. 173.5 The forecast of the product sales revenue-. .18Chapter 4 Construction conditions a
5、nd site selection4.1 Resources and raw materialg.184.2 Selection area for the construction.194.3 Site selection.19Chapter 5 Plant Know-How.13.205.1 Project composition5.2 Tech nical soluti ons in production. .215.2.1Selection of process technical scheme-.215.2.2 Process flow.235.2.3 Brief outline of
6、 the process. .255.3 29 full intelligent tunnel kiln. . . .265.3.1 Brief descripti on of the tunnel kil n developme nt :.265.3.2 Structure of the tinnel kil n .275.3.3 Kiln structure.295.3.4 Main technical parameters of the tunnel kiln.345.3.5 Comparative advantages and disadvantages of the rotary a
7、nd tunnelkiln.355.424 sets 3. 6m two-stage gas furnace, air-cooled, cooling process coldgas stati ons . :. 365.4.1 Overview of gas furnace. .365.4.2 Planning design basis.375.4.3 Project scale and main technical requirements. .385.4.4 Nati onal sta ndard (adopted or referenced). 385.4.5 Desig n of g
8、as station.395.4.6 Brief outline of the process and advantagesin energy saving anden vir onment protection.435.4.7 Flowing process.445.4.8 Main characters of 3.6m two stages generator.485.4.9 Electronic control and instrument system in gas station.495.4.10 Pipe network system in gas station. 495.4.1
9、1 Coal feeding system.515.4.12 Gas wet desulfurization. 515.4.13 Manufacturing standards, testing standards, acceptance criteria,detection means. 555.4.14 Gas preparation and safe production of gas station.565.4.15 Gas preparation and firefighting of gas station. 575.4.16 The organization and workin
10、g personnels of the gas station.575.4.17 Direct cost calculating. 575.4.18 Device configuration detail of gas system.585.5 Material balance, water balance, nickel element balance, gas balance, andequipment capacity matched of the project.615.5.1 Material balance, water balance, nickel element balanc
11、e, gas balance625.5.2 Main equipment scheme in production.645.6 Working system.685.7 Production inspection.685.8General layout and transportation, utility and ancillary engineering. 68Chapter 6 Environmental Protection and Labor Safety6.1 Environmental state of the construction region .776.2 The mai
12、n pollution sources and contaminants of the project.776.3 The environmental protection standards to be adopted. 776.4 Environment control scheme.786.5 Investment estimation of the environment protection.806.6 Evaluation conclusions of the environment impact.816.7 Labor protection and production safe
13、ty. 816.7.1 Analysis of risk、 occupational harmfulness in the production.816.7.2 The main countermeasures in labor safety design.826.8 Energy saving .85Chapter 7 Business Organizations and Labor Quota7.1 Business organizations.877.2 Labor requirement and personnel training. 88Chapter 8 The Implement
14、ation Schedule of the Project8.1 The various stages of the implementation.898.2 The implementation schedule of the project.898.3 The cost of the implementation.89Chapter 9 Financial Estimation of the Project9.1 Total investment estimation.899.2 Funds raising.90Chapter 10 Financial Economy and Social
15、 Benefits10.1 Production costs and sales revenue estimation.9010.2 Financial evaluation and risk assessment. 92Chapter 11 Conclusions and Recommendations11.1 Conclusions.9311.2 Recommendations.941.1 項(xiàng)目概況7400萬(wàn)噸印尼紅土泥鎳礦項(xiàng)目可行性研究報(bào)告1.2立項(xiàng)研究結(jié)論第一章總論第三章 項(xiàng)目分析及預(yù)測(cè)1.2.1 項(xiàng)目產(chǎn)品市場(chǎng)前景81.2.2 項(xiàng)目原料供應(yīng)問(wèn)題81.2.3 項(xiàng)目政策保障問(wèn)題91.2.4
16、 項(xiàng)目資金保障問(wèn)題91.2.5 項(xiàng)目組織保障問(wèn)題91.2.6 項(xiàng)目技術(shù)保障問(wèn)題91.2.7 項(xiàng)目人力保障問(wèn)題91.2.8 項(xiàng)目風(fēng)險(xiǎn)控制問(wèn)題101.2.9 項(xiàng)目財(cái)務(wù)效益結(jié)論111.2.10 項(xiàng)目社會(huì)效益結(jié)論111.2.11 項(xiàng)目立項(xiàng)可行性綜合評(píng)價(jià)111.3 主要技術(shù)經(jīng)濟(jì)指標(biāo)匯總11第二章 項(xiàng)目背景2.1 項(xiàng)目建設(shè)背景132.2 項(xiàng)目建設(shè)必要性132.3 項(xiàng)目建設(shè)可行性132.3.1 經(jīng)濟(jì)可行性132.3.2 政策可行性142.3.3 技術(shù)可行性142.3.4 模式可行性142.3.5 組織和人力資源可行性153.1 項(xiàng)目市場(chǎng)規(guī)模調(diào)查153.2 項(xiàng)目市場(chǎng)競(jìng)爭(zhēng)調(diào)查163.3 項(xiàng)目市場(chǎng)前景預(yù)測(cè)173.
17、4 產(chǎn)品方案和建設(shè)規(guī)模173.5 產(chǎn)品銷(xiāo)售收入預(yù)測(cè)18第四章建設(shè)條件與廠(chǎng)址選擇4.1 資源和原材料184.2 建設(shè)地區(qū)的選擇194.3 廠(chǎng)址選擇19第五章工廠(chǎng)技術(shù)方案5.1 項(xiàng)目組成205.2 生產(chǎn)技術(shù)方案215.2.1 工藝技術(shù)方案的選擇215.2.2 工藝流程235.2.3 工藝流簡(jiǎn)述255.329 條 3.2mx168m 全智能化隧道窯265.3.1 隧道窯發(fā)展簡(jiǎn)述265.3.2隧道窯的結(jié)構(gòu)275.3.3 窯體結(jié)構(gòu)295.3.4 隧道窯的主要技術(shù)參數(shù)345.3.5 回轉(zhuǎn)窯與隧道窯優(yōu)缺點(diǎn)對(duì)比355.5.1 項(xiàng)目物料平衡、水平衡、鎳元素平衡、煤氣平衡 625.424 臺(tái) 3. 6m 兩段煤氣
18、發(fā)生爐風(fēng)冷間冷工藝的冷煤氣站365.4.1煤氣發(fā)生爐概述365.4.2規(guī)劃設(shè)計(jì)依據(jù)375.4.3工程規(guī)模及主要技術(shù)要求385.4.4采用或參照的國(guó)家標(biāo)準(zhǔn)385.4.5煤氣站設(shè)計(jì)395.4.6工藝流程簡(jiǎn)述及節(jié)能環(huán)保優(yōu)勢(shì)435.4.7技術(shù)工藝流程445.4.8 3.6m 兩段煤氣發(fā)生爐主要技術(shù)特點(diǎn)485.4.9煤氣站常規(guī)控制電控、儀表系統(tǒng)495.4.10煤氣站管網(wǎng)系統(tǒng)495.4.11上煤系統(tǒng)515.4.12煤氣濕法脫硫515.4.13制造標(biāo)準(zhǔn)、檢測(cè)標(biāo)準(zhǔn)、驗(yàn)收標(biāo)準(zhǔn)、檢測(cè)手段555.4.14煤氣制備和煤氣站安全生產(chǎn)565.4.15煤氣制備和煤氣站消防575.4.16煤氣站生產(chǎn)組織和勞動(dòng)定員575.4.17煤氣直接成本測(cè)算575.4.18煤氣系統(tǒng)設(shè)備配置明細(xì)585.5項(xiàng)目物料平衡、水平衡、鎳元素平衡、煤氣平衡和各設(shè)備產(chǎn)能匹配615.5.2主要生產(chǎn)設(shè)備方案645.5.1 項(xiàng)目物料平衡、水平衡、鎳元素平衡、煤氣平衡 625.6工作制度685.7生產(chǎn)檢驗(yàn)685.8 總圖運(yùn)輸和公用與輔助工程68第六章環(huán)保與勞動(dòng)安全6.1建設(shè)地區(qū)環(huán)境現(xiàn)狀776.2 項(xiàng)目主要污染源和污染物776.3 項(xiàng)目擬采用的環(huán)境保護(hù)標(biāo)準(zhǔn)776.
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- T/CAPEB 00001.6-2022制藥裝備容器和管道第6部分:制造和安裝
- 部門(mén)部長(zhǎng)面試題及答案
- 國(guó)企服務(wù)員考試題及答案
- 德陽(yáng)語(yǔ)文面試題及答案
- 點(diǎn)頭征的臨床護(hù)理
- 合伙協(xié)議糾紛調(diào)解協(xié)議書(shū)
- 房子租約解除合同范本
- 廣告項(xiàng)目合同延期協(xié)議書(shū)
- 律師委托協(xié)議終止協(xié)議書(shū)
- 銀行和村委合作協(xié)議書(shū)
- 智能制造對(duì)融資租賃行業(yè)影響-全面剖析
- 2025年新高考語(yǔ)文【語(yǔ)言運(yùn)用新題型】考前訓(xùn)練試卷附答案解析
- GB 29743.2-2025機(jī)動(dòng)車(chē)?yán)鋮s液第2部分:電動(dòng)汽車(chē)?yán)鋮s液
- 安全人機(jī)工程學(xué)-人因事故分析與預(yù)防報(bào)告課件
- 生物有機(jī)肥試驗(yàn)方案
- 江蘇省南通市合作盟校2025年高考化學(xué)四模試卷含解析
- 2025年小升初語(yǔ)文《分析人物形象》教學(xué)講義及專(zhuān)項(xiàng)練習(xí)題(附答案)
- 超星爾雅學(xué)習(xí)通《中華文化才藝(中國(guó)海洋大學(xué))》2025章節(jié)測(cè)試附答案
- 大數(shù)據(jù)與人工智能在財(cái)務(wù)管理中的深度應(yīng)用研究
- 《AI技術(shù)術(shù)語(yǔ)解析》課件
- 康姿百德入職培訓(xùn)
評(píng)論
0/150
提交評(píng)論