預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書_第1頁
預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書_第2頁
預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書_第3頁
預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書_第4頁
預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書_第5頁
已閱讀5頁,還剩5頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

中鐵十三局集團(tuán)有限公司合福鐵路安徽段站前二標(biāo)施工過程限制標(biāo)準(zhǔn)化管理手冊(cè)編號(hào):ZT13J-SGZD-HD-XX預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書編制:審核:批準(zhǔn):201年月日發(fā)布201年月日實(shí)施中鐵十三局集團(tuán)有限公司第六工程公司目錄1目的··············································································22編制依據(jù)············································································23適用范圍············································································24作業(yè)打算············································································24.1技術(shù)打算··········································································24.2材料、設(shè)備打算·····································································25.勞動(dòng)組織···········································································25.1勞動(dòng)力組織方式····································································25.2施工人員結(jié)合既定施工方案、機(jī)械、工期要求進(jìn)行合理配置································26材料要求···········································································26.1預(yù)應(yīng)力鋼絞線·····································································36.2錨具、夾具········································································37設(shè)備機(jī)具配置······································································38.張拉程序與工藝流程································································49.施工要求·········································································49.1技術(shù)要求·········································································49.2鋼絞線下料、穿束···································································49.3錨具及千斤頂安裝··································································49.4張拉··············································································59.5伸長(zhǎng)量的計(jì)算和量測(cè)································································510.預(yù)應(yīng)力施工質(zhì)量限制及檢驗(yàn)··························································610.1質(zhì)量限制·········································································610.2質(zhì)量檢驗(yàn)·········································································611.平安及環(huán)保要求····································································7預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書1目的:新建合福鐵路(安徽段)銅陵長(zhǎng)江北引橋(40+56+40)m是施工中重點(diǎn)限制部位,為了確保懸臂澆筑連續(xù)梁張拉的施工質(zhì)量,特編制預(yù)應(yīng)力鋼束張拉作業(yè)指導(dǎo)書,用以指導(dǎo)此類工程施工。2編制依據(jù):《鐵路預(yù)應(yīng)力混凝土連續(xù)梁懸臂澆注施工技術(shù)指南》TZ324-2010《高速鐵路橋涵工程施工質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》TB10752-2010/J1148-2011《鐵路混凝土工程施工技術(shù)指南》鐵建設(shè)[2010]241號(hào)《高速鐵路橋涵工程施工技術(shù)指南》鐵建設(shè)[2010]241號(hào)3.適用范圍新建合福鐵路(安徽段)銅陵長(zhǎng)江北引橋(40+56+40)m懸臂澆筑連續(xù)梁張拉施工。4.作業(yè)打算4.1技術(shù)打算張拉人員仔細(xì)熟識(shí)圖紙規(guī)定的施工方法、張拉依次、張拉時(shí)間、張拉應(yīng)力及張拉伸長(zhǎng)量;熟識(shí)規(guī)范規(guī)定的張拉要求,及質(zhì)量標(biāo)準(zhǔn),計(jì)算鋼絞線實(shí)際下料長(zhǎng)度、施工時(shí)與設(shè)計(jì)張拉力對(duì)應(yīng)的張拉油表值、鋼絞線各張拉階段伸長(zhǎng)值。4.2材料、設(shè)備打算4.2.1依據(jù)圖紙?jiān)O(shè)計(jì),運(yùn)用的鋼絞線為1×7-15.2-1860-GB鋼絞線,鋼絞線運(yùn)用前由試驗(yàn)室對(duì)每批鋼絞線進(jìn)行檢驗(yàn),檢驗(yàn)合格后才能運(yùn)用。4.2.2錨具運(yùn)用前由試驗(yàn)室進(jìn)行外觀、硬度、錨固性能及工藝性能的抽樣檢驗(yàn),檢驗(yàn)合格的錨具才能運(yùn)用。4.2.3張拉千斤頂?shù)念~定張拉噸位為張拉力的1.5倍,張拉千斤頂在運(yùn)用前必需經(jīng)過校正,校正系數(shù)不大于1.05,校正有效期為1個(gè)月,且張拉次數(shù)不得超過300次,千斤頂拆修或更換配件應(yīng)重新校正。壓力表的表面最大讀數(shù)為張拉力的1.5倍,0.4級(jí)校正有效期為1個(gè)月。且壓力表應(yīng)與張拉千斤頂配套運(yùn)用。5.勞動(dòng)組織5.1勞動(dòng)力組織方式:采納架子隊(duì)組織模式。5.2施工人員應(yīng)結(jié)合施工方案、工期要求、機(jī)械配置等合理支配。張拉油表限制人員4人,限制張拉力及油表讀數(shù)。伸長(zhǎng)量測(cè)量人員4人。張拉工班長(zhǎng)1人,負(fù)責(zé)張拉速度等整個(gè)協(xié)調(diào)工作。電工1人。6.材料要求6.1預(yù)應(yīng)力鋼絞線依據(jù)圖紙?jiān)O(shè)計(jì),運(yùn)用的鋼絞線為1×7-15.2-1860-GB鋼絞線,豎向采納Ф25PSB785精軋螺紋鋼,精軋螺紋鋼和鋼絞線運(yùn)用前由試驗(yàn)室對(duì)每批鋼絞線、精軋螺紋鋼進(jìn)行檢驗(yàn),檢驗(yàn)合格后才能運(yùn)用。6.2錨具、夾具錨具運(yùn)用前由試驗(yàn)室進(jìn)行外觀、硬度、錨固性能及工藝性能的抽樣檢驗(yàn),檢驗(yàn)合格的錨具才能運(yùn)用。7.設(shè)備機(jī)具配置張拉千斤頂和張拉油泵采納柳州OVM產(chǎn)品,張拉工作前提前標(biāo)定,詳細(xì)數(shù)量見下表:預(yù)應(yīng)力施工主要機(jī)械設(shè)備配備表序號(hào)設(shè)備名稱型號(hào)數(shù)量1油泵ZB4-50042千斤頂YCW400B43千斤頂YCW60B24千斤頂YDC240QX25卷揚(yáng)機(jī)5T26倒鏈1T48.張拉程序與工藝流程張拉程序?yàn)椋?→0.10σk(作伸長(zhǎng)量標(biāo)記)→0.2σk(作伸長(zhǎng)量標(biāo)記)→σk(靜停5分鐘)→補(bǔ)拉σk(測(cè)伸長(zhǎng)量)→錨固。(σk為張拉時(shí)的限制應(yīng)力,包括預(yù)應(yīng)力損失在內(nèi),其值依據(jù)設(shè)計(jì)圖紙要求而定,初應(yīng)力取σk的10%。)回油自鎖錨固,測(cè)總回縮量,數(shù)據(jù)復(fù)核回油自鎖錨固,測(cè)總回縮量,數(shù)據(jù)復(fù)核補(bǔ)油至σk,測(cè)伸長(zhǎng)值,校核伸長(zhǎng)值σk(持荷5min)0.10σk/0.2σk作伸長(zhǎng)值標(biāo)記起先張拉安裝千斤頂錨具安裝穿束管道清理施工打算預(yù)應(yīng)力張拉工藝流程圖9.施工要求9.1.技術(shù)要求預(yù)應(yīng)力施工是連續(xù)梁工程中最為關(guān)鍵的工序,其施工質(zhì)量的好壞將干脆影響連續(xù)梁的有效預(yù)應(yīng)力值及最終質(zhì)量。每梁段施工必需在混凝土強(qiáng)度達(dá)到設(shè)計(jì)值95%以上、彈性模量達(dá)設(shè)計(jì)值100%、齡期不少于5d及規(guī)范要求后進(jìn)行。連續(xù)梁帶模預(yù)張拉時(shí),內(nèi)模板應(yīng)松開,不應(yīng)對(duì)梁體壓縮造成阻礙。9.2鋼絞線下料、穿束鋼絞線進(jìn)場(chǎng)并檢驗(yàn)合格后,進(jìn)行鋼絞線下料,依據(jù)圖紙說明,鋼絞線下料長(zhǎng)度=工作長(zhǎng)度+1.56穿束前,先用空壓機(jī)吹凈孔內(nèi)雜物,并將錨墊板口內(nèi)的混凝土清除干凈,下好料的鋼絞線兩端用膠布纏牢,整體穿束。穿好的鋼絞線應(yīng)疏整,順直,不得纏在一起。9.3錨具及千斤頂安裝(1)錨具安裝前先清洗干凈,然后再安裝。先裝工作錨和工作夾片,安裝時(shí)留意工作錨在錨墊板限位槽內(nèi),工作夾片用套管打入錨孔,外露端應(yīng)平齊,否則取下重新安裝。工作錨和工作夾片安裝好后,再安裝錨環(huán),錨環(huán)應(yīng)緊扣工作錨。(2)張拉限位器安裝時(shí)與工作錨對(duì)正安裝。(3)千斤頂安裝時(shí)需留意千斤頂油路方向,進(jìn)油、回油油路不得裝反。(4)工具錨安裝時(shí)應(yīng)與千斤頂緊扣,工具夾片安裝前應(yīng)纏裹塑料布,并抹少量黃油,以便于張拉完成后卸頂。9.4張拉(1)依據(jù)圖紙?jiān)O(shè)計(jì)要求,本工程張拉要求砼強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度達(dá)到設(shè)計(jì)值95%以上及彈性模量達(dá)到設(shè)計(jì)值100%,且齡期不少于5天時(shí)進(jìn)行張拉。(2)張拉前,先檢查千斤頂和錨具是否安裝好,千斤頂進(jìn)、回油油路是否正確,確認(rèn)無誤后方可進(jìn)行張拉。(3)張拉先縱向再豎向精軋螺紋鋼,最終張拉橫向。張拉時(shí),縱向采納兩端張拉,兩側(cè)對(duì)稱張拉,由外側(cè)向內(nèi)側(cè),先長(zhǎng)后短張拉依次。豎向和橫向均采納單端張拉。每加5MPa相互通報(bào)一次,便于調(diào)整兩端張拉速度,保持兩端一樣,張拉達(dá)到100%并測(cè)量完伸長(zhǎng)量后,計(jì)算實(shí)際伸長(zhǎng)量,并與設(shè)計(jì)伸長(zhǎng)量進(jìn)行比較,當(dāng)誤差大于6%時(shí),應(yīng)暫停張拉,查明緣由并實(shí)行調(diào)整措施后再進(jìn)行張拉。(4)張拉至限制應(yīng)力后,持荷5min,錨固;若油壓稍有下降,須補(bǔ)油到設(shè)計(jì)噸位的油壓值,然后再卸載,卸載時(shí)應(yīng)兩端同時(shí)進(jìn)行,并限制卸載速度,卸載速度不能太快。張拉時(shí)分級(jí)加載,依據(jù)10%σk→20%σk→100%σk→補(bǔ)油至100%σk對(duì)應(yīng)的張拉力分別量測(cè)伸長(zhǎng)值。張拉限制采納張拉應(yīng)力和伸長(zhǎng)值雙控,以張拉應(yīng)力限制為主,以伸長(zhǎng)值進(jìn)行校核,當(dāng)實(shí)際伸長(zhǎng)值與理論伸長(zhǎng)值差超過6%時(shí),應(yīng)停止張拉,等查明緣由并實(shí)行措施后再進(jìn)行施工。9.5伸長(zhǎng)量的計(jì)算和量測(cè)(1)預(yù)應(yīng)力理論伸長(zhǎng)值的計(jì)算后張法預(yù)應(yīng)力筋理論伸長(zhǎng)值及預(yù)應(yīng)力筋平均張拉力的計(jì)算公式如下:(1)(2)式中:----預(yù)應(yīng)力筋理論伸長(zhǎng)值(mm)----預(yù)應(yīng)力筋的長(zhǎng)度(mm)----預(yù)應(yīng)力筋的平均張拉力(N)----從張拉端至計(jì)算截面孔道長(zhǎng)度(m)----預(yù)應(yīng)力筋截面面積(mm2)----預(yù)應(yīng)力筋的彈性模量(Mpa)----預(yù)應(yīng)力筋張拉端的張拉力(N)----從張拉端至計(jì)算截面曲線孔道部分切線的夾角之和(rad)----孔道每米局部偏差對(duì)磨擦的影響系數(shù),取0.00782----預(yù)應(yīng)力筋與孔道壁的磨擦系數(shù)0.23。(2)實(shí)際伸長(zhǎng)量的量測(cè)及計(jì)算方法預(yù)應(yīng)力筋張拉前,應(yīng)先調(diào)整到初應(yīng)力σ0(一般可取限制應(yīng)力的10%~20%),伸長(zhǎng)量應(yīng)從初應(yīng)力時(shí)起先量測(cè)。實(shí)際伸長(zhǎng)值除張拉時(shí)量測(cè)的伸長(zhǎng)值外,還應(yīng)加上初應(yīng)力時(shí)的推算伸長(zhǎng)量,對(duì)于后張法混凝土結(jié)構(gòu)在張拉過程中產(chǎn)生的彈性壓縮量一般可省略。實(shí)際伸長(zhǎng)值的量測(cè)采納量測(cè)千斤頂油缸行程數(shù)值的方法。在初始應(yīng)力下,量測(cè)油缸外露長(zhǎng)度,在相應(yīng)分級(jí)的荷載下量測(cè)相應(yīng)油缸外露長(zhǎng)度。實(shí)際伸長(zhǎng)值△L的計(jì)算公式如下:△L=B+C-2AA—0~10%σk應(yīng)力下的千斤頂?shù)膶?shí)際引伸量B—20%σk應(yīng)力下的千斤頂?shù)膶?shí)際引伸量C—20%σk~100%σk應(yīng)力下的千斤頂?shù)膶?shí)際引伸量10.預(yù)應(yīng)力施工質(zhì)量限制及檢驗(yàn)10.1質(zhì)量限制10.110.1.2張拉時(shí),預(yù)應(yīng)力筋伸長(zhǎng)值與設(shè)計(jì)伸長(zhǎng)值誤差在10.1.3依據(jù)圖紙?jiān)O(shè)計(jì)要求確定張拉依次,10.110.1《鐵路預(yù)應(yīng)力混凝土連續(xù)梁懸臂澆注施工技術(shù)指南》TZ324-2010《高速鐵路橋涵工程施工質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》TB10752-2010/J1148-2011《鐵路混凝土工程施工技術(shù)指南》鐵建設(shè)[2010]241號(hào)《高速鐵路橋涵工程施工技術(shù)指南》鐵建設(shè)[2010]241號(hào)10.2質(zhì)量檢驗(yàn)10.2.110.2.210.2.3預(yù)應(yīng)力筋用錨具、夾具和連接器進(jìn)場(chǎng)時(shí),必需對(duì)其質(zhì)量指標(biāo)進(jìn)行全面檢查并按批進(jìn)行外觀及外形尺寸、硬度、靜載錨固系數(shù)性能試驗(yàn),其質(zhì)量必需符合設(shè)計(jì)要求和相關(guān)標(biāo)準(zhǔn)的規(guī)定。每50

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論