




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
第20講預(yù)應(yīng)力混凝梁橋后張法施工主講:曾紹武
陜西鐵路工程職業(yè)技術(shù)學(xué)院2能夠掌握后張法的施工過(guò)程。目標(biāo)1能夠繪制后張法施工工藝流程圖。目標(biāo)2能夠模擬組織后張法施工。目標(biāo)3能力目標(biāo)target1objective2objective3Canmastertheconstructionprocessoftheposteriortensionmethod.Abilitytodrawthepostconstructionprocessflowchart.Cansimulatetheorganizationafterthetensionmethodofconstruction.任務(wù)導(dǎo)入:大中跨徑的預(yù)應(yīng)力混凝簡(jiǎn)支梁整孔預(yù)制,一般都采用后張法施工。中鐵十八局西潼高速改擴(kuò)建工程尤河大橋項(xiàng)目部,引橋15孔30米簡(jiǎn)支箱梁為工程實(shí)例,介紹后張法是要點(diǎn)。Taskintroduction:thewholeholeoftheprestressedcoagulationsimplesupportbeamwithlargeandmediumspanisprefabricated,whichisgenerallyconstructedbythepost-tensionmethod.InYouxiBridgeprojectdepartmentofXitongExpresswayreconstructionandexpansionprojectofChinaRailway18thBureau,the15holesand30metersoftheapproachbridgeistheprojectexample,andtheZhangmethodisthekeypointafterintroduction.預(yù)應(yīng)力混凝土后張法施工項(xiàng)目任務(wù)
1后張法施工工藝--主線3后張法施工過(guò)程所用設(shè)備后張法施工工藝實(shí)施方法123Post-tensionmethodconstructiontechnology--themainlineEquipmentusedinthepost-tensionconstructionprocessImplementationmethodofposttensionconstructiontechnology后張法箱梁制造工藝
一、制梁臺(tái)底模準(zhǔn)備Manufacturingprocessofbacktensionboxbeam1.Beammakingstagebottomformworkpreparation二.底腹板鋼筋綁扎
任務(wù)1鋼筋和預(yù)應(yīng)力筋報(bào)檢內(nèi)容?任務(wù)1解析:鋼筋規(guī)格、間距、尺寸、
數(shù)量、彎曲形式,位置。BindofbottomreinforcementTask1reinforcementandprestressedreinforcementinspectioncontent?Task1analysis:reinforcementspecification,spacing,size,quantity,bendingform,position.任務(wù)2:怎么保證預(yù)應(yīng)力位置?任務(wù)2解析:定位鋼筋,最少每50cm
要求和鋼筋籠焊接牢固Task2:Howtoensuretheprestressedposition?Task2analysis:positioningsteelbar,atleastevery50cmrequirementsandsteelcageweldingfirmly123任務(wù)3:通過(guò)圖片分析抽拔式和埋置式制孔器區(qū)別?任務(wù)3解析:形狀、工作原理、材質(zhì)Task3:Analyzethedifferencebetweendrawingtypeandburiedholemakerthroughpictures?Task3analysis:shape,workingprinciple,material三、內(nèi)模安裝
打磨清理內(nèi)模、安裝3.InternalmodeinstallationGrindingandcleaningtheinternalmoldandinstallation四、模板安裝:端模板安裝
4.Templateinstallation:terminaltemplateinstallation模板安裝:側(cè)模板安裝,模板安裝調(diào)整,檢查軸線、標(biāo)高,接縫、預(yù)埋件、連接件Templateinstallation:sideformworkinstallation,formworkinstallationandadjustment,checktheaxis,elevation,joints,embeddedpartsandconnections五、頂板鋼筋安裝
5.Installationofroofsteelreinforcement六、澆筑混凝土
混凝土運(yùn)輸、振搗
注意采用抽拔式制孔器時(shí)間。Six,pouringconcreteconcretetransportation,vibrationpayattentiontotheuseofdrawingtypeholemakertime.蒸汽養(yǎng)護(hù)篷布遮蓋溫度計(jì)鍋樓蒸汽鍋爐七、養(yǎng)護(hù):薄膜灑水、噴霧、蒸汽養(yǎng)護(hù)Seven,maintenance:filmsprinklingwater,spray,steamcuringsteam-curedthermometerThepotfloorsteamboilerClosurecover八、拆模Eight,moldremoval卷?yè)P(yáng)機(jī)穿鋼束穿束機(jī)械穿鋼束九、穿預(yù)應(yīng)力筋:任務(wù)1穿束前清孔、穿束方法和設(shè)備?任務(wù)1解析:空壓機(jī),卷?yè)P(yáng)機(jī),穿束機(jī)
9.Wearprestressedtendons:Task1:Clearholes,piercingmethodandequipmentbeforepiercing?Task1analysis:aircompressor,winist,throughmachineThehoistpassesthroughthesteelbeamMechanicalmechanicalthroughsteelharness穿束二期張拉錨環(huán)鋼絞線十、張拉:任務(wù)1設(shè)備選用、雙控含義、安全?任務(wù)1解析:設(shè)備:穿心式千斤頂,設(shè)備標(biāo)定雙控:應(yīng)力控制、伸長(zhǎng)量控制安全:張拉速度,不能超過(guò)張拉控制應(yīng)力人不能在設(shè)備后,夾片安裝牢靠Task1Analysis:Equipment:piercingjack,equipmentcalibrationdoublecontrol:stresscontrol,elongationcontrolSafety:thetensionspeed,cannotexceedthetensioncontrolstresspersoncannotbeinstalledaftertheequipment,theclipisfirmlyTask1Equipmentselection,doublecontrolmeaning,safety?十一、清孔、壓漿:壓漿泵壓漿壓漿頭任務(wù)1注意所用的設(shè)備,要求?任務(wù)1解析:壓漿泵、壓接管頭漿體膨脹,飽滿流出Task1analysis:pressureslurrypump,pressurecontrolheadslurryexpansion,fulloutflowTask1Notetheequipmentused,requirements?Xi.Holecleaningandgrouting:封錨前封端十二、封端:stopend后張法施工工藝實(shí)施方案后張法施工工藝后張法施工過(guò)程所用設(shè)備
13123小結(jié):Post-tensionmethodofconstructiontechnologyEquipmentusedinthepost-tensionconstructionprocessPost-tensionconstructiontechnologyimplementationplan(1)橋墩施工情境:10*25m簡(jiǎn)支梁橋,雙柱橋墩,柱高12-30m,矩形柱為1.4*1.8m,橋下無(wú)水。要求編制后張法施工方案,制定相應(yīng)的實(shí)施方案。(2)教材P199,5.21,5.23
作業(yè)卡片關(guān)鍵:根據(jù)橋梁施工情境和施工單位的人員、材料、設(shè)備條件來(lái)選擇經(jīng)濟(jì)合理的施工方法。(1)Pierconstructionsituation:10*25msimplysupportedbeambridge,doublecolumnpier,columnheight12-30m,rectangularcolumnis1.[]4*1.[]8m,nowaterunderthebridge.Itisrequiredtopreparethepost-methodconstructionplanandformulatethecorrespondingimplement
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 家庭房屋裝修協(xié)議合同書二零二五年
- 公司信用擔(dān)保合同樣本
- 住建部合同樣本樣本
- 個(gè)人借用汽車合同樣本
- 精裝修施工現(xiàn)場(chǎng)臨時(shí)用電方案資料
- 中學(xué)“提升工程2.0”校本研修方案
- 信封供貨合同標(biāo)準(zhǔn)文本
- 主題班會(huì)教案:積極心態(tài)-健康成長(zhǎng)主題班會(huì)教案
- 會(huì)計(jì)崗位聘用合同樣本
- 代運(yùn)營(yíng)協(xié)議合同樣本
- 河南鄭州航空港區(qū)國(guó)際教育集團(tuán)招聘考試真題2024
- 中小學(xué)校長(zhǎng)在教師大會(huì)上講話:以八項(xiàng)規(guī)定精神引領(lǐng)教育高質(zhì)量發(fā)展根深?重明?規(guī)立?法新?行遠(yuǎn)
- 2025山東航空股份限公司社會(huì)招聘易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2024年開(kāi)封尉氏縣事業(yè)單位招聘工作人員筆試真題
- 全球化背景下的中國(guó)外交政策試題及答案
- 食品安全管理制度打印版
- 建筑公司管理制度大全
- GB/T 45251-2025互聯(lián)網(wǎng)金融個(gè)人網(wǎng)絡(luò)消費(fèi)信貸貸后催收風(fēng)控指引
- 西交大政治考題及答案
- 鐵路施工安全教育培訓(xùn)
- 【MOOC期末】《英美文學(xué)里的生態(tài)》(北京林業(yè)大學(xué))期末中國(guó)大學(xué)慕課MOOC答案
評(píng)論
0/150
提交評(píng)論