下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
A319/320月檢工作單A319/320MONTHLYCHECK編寫Originator/日期Date:Auditor/Date:Approval/Date:版本號(hào) 一、說明 二、概述 三、工作內(nèi)容IMS項(xiàng)目PARTIMPD檢查檢 CheckNitrogenChargePressureOnHydraulicPower CheckNitrogenChargePressureOnAccumulatorByReading CheckoftheElectricalMasterChipDetectorforParticles-Engine CheckoftheElectricalMasterChipDetectorforParticles- CheckoftheIDGOilLevelandOil-FilterDifferential-PressureIndicator(DPI)(ForA/CwithCFM56-5BENGs)(MS242100-02-1)(FIG.9,FIG.10,FIG.11) CheckoftheIDGOilLevelandOil-FilterDifferential-PressureIndicator(DPI)(ForA/CwithV2500ENGs)(MS242100-07-1)(FIG.12,FIG.13,FIG.14)操作測(cè)試執(zhí)行激活ELAC1&2和SEC1STBYPWRSPLY及ELAC1和SEC1&2獲取俯仰控制的邏輯以及側(cè)桿優(yōu)先級(jí)功能測(cè)試。(MS279000-05-1) OperationalTestofLogicsActivatingELAC1&2,&SEC1STBYPWRSPLY&AbilityofSEC1&2toAchievePitchCTL&AbilityofSidestickPriorityFunction勤務(wù) CleaningoftheVacuumWasteLineswithChemicalCleaning ReplenishOil Engine DrainandReplenishOilSystemandinspectionofmagneticchipdetectorforEngine LubricationofMainLandingGearDoorActuatingCylinder。(FIG.19)II部分維修經(jīng)驗(yàn)項(xiàng)目/PARTIIMAINTENANCEEXPERIENCEITEM檢查便攜氧氣瓶面罩(RCB2006- AReferencesIDGServicing-FillingoftheIDGwithOilorAdditionofOilafteraLevelReplenishmentofStarterOilDrainandReplenishOilDrainandReplenishOilDrainandReplenishOilFilltheHydraulicPowerAccumulatorswithNitrogenFillingoftheYellowHydraulicSystem,BrakePressureServicingoftheToiletEnergizetheAircraftElectricalCircuitsfromtheExternalEnergizetheAircraftElectricalCircuitsfromtheEnergizetheAircraftElectricalCircuitsfromEngineDe-energizetheAircraftElectricaldfromtheExternalDe-energizetheAircraftElectricaldfromtheDe-energizetheAircraftElectricaldfromtheEngineEnergizetheGroundServiceNetworkfromtheExternalDe-energizetheGroundServicedfromtheExternalPuttheRelatedHydraulicSystemintheDepressurizedConfigurationBleedingProcedureoftheGreenHydraulicSystemDownstreamoftheEngineBleedingProcedureoftheYellowHydraulicSystemDownstreamoftheBleedingProcedureoftheBlueHydraulicSystemDownstreamoftheBlueE-PressurizetheBlueHydraulicSystemwithaHydraulicGroundPower-PressurizetheBlueHydraulicSystemwiththeBlueElectricDepressurizetheYellowHydraulicDepressurizetheBlueHydraulicRemovaloftheAccumulator-AirPressureInstallationoftheAccumulator-AirPressureRemovaloftheGreenPowerInstallationoftheGreenPowerRemovaloftheAccumulator-AirPressureInstallationoftheAccumulator-AirPressureRemovaloftheBluePowerInstallationoftheBluePowerRemovaloftheAccumulator-AirPressureInstallationoftheAccumulator-AirPressureRemovaloftheYellowPowerInstallationoftheYellowPowerPressurizetheGreenHydraulicSystemfromtheYellowHydraulicSystemthePTUwiththeElectricDepressurizetheGreenandYellowHydraulicSystemsafterOperationofthePressurizetheYellowHydraulicSystemwiththeElectricDepressurizetheYellowHydraulicEISStartEISStopOpentheMainGearDoorsforClosetheMainGearDoorsafterRemovaloftheInstallationoftheRemovaloftheChargingInstallationoftheChargingRemovaloftheAccumulatorPressureInstallationoftheAccumulatorPressurePressurizationofthePotableWaterSystemfromaGroundAir(Ref.38-31-00-100-005-A).CleaningoftheToiletWasteLineswithCrushedCleaningoftheVacuumWasteLineswithChemicalCleaningAgentandCrushedOpentheAvionicsCompartmentDoorsforClosetheAvionicsCompartmentDoorsafterGeneralTorqueTighteningProceduresfortheInstallationofPreformedLockingDevicesGeneralOpeningoftheFanCowlsOpeningoftheFanCowlClosingoftheFanCowlsClosingoftheFanCowlInspectionoftheMagneticChipDetectorsforInspectionoftheOilCheckofFWD,AFTSump,AGB,andTGBscavengePreparationoftheParticlesfromtheGroundRunforadditionalparticleRemovaloftheMagneticChipInstallationoftheMagneticChipRemovalofthe aticInstallationofthe aticRemovaloftheCleaningoftheStarterSightInspectionofStarterMagneticChipInstallationoftheResultoftheOperationalTestoftheLogicsthatActivatestheELAC1&2andSEC1STBYPWRSPLYnotSatisfactory(forcorrectiveaction)OperationalTestoftheTHSActuatorElectricalControloroftheELAC1andSEC1&2onPitchControlnotok(forcorrectiveaction)BExpendablePartOrJ221P018OrM83248-1-2sealing2S3225-4SB80-00134動(dòng)機(jī)的飛POSTSB80-0006S9413-8seal4seal4sealing2sealing2sealing2以上件號(hào)供參考,請(qǐng)根據(jù)飛機(jī)實(shí)際構(gòu)型參考對(duì)應(yīng)IPCNoACCESSPLATFORM2M(6FT)-NoSAFETYCLIP-CIRCUITNowarningNoTISSUENoMAGNIFYINGGLASSPOWERNoTorquewrench:rangetobetween5and15lbf.in(0.060.17NoTorquewrench:rangetobetween10and25lbf.in(0.110.28NoNoLIGHTSOURCE-NoMIRROR-NoCONTAINER10L(21/2NoFILLINGEQUIPMENT OIL,DH13PMNoACCESSPLATFORM3M(10FT)-NoLUBRICATINGNoSAFETYSLEEVE-GROUNDTestingMedium-LeakDetection-OxygenV01-cleaningTextile-LintfreeCottonengineV02-Cleaner-ToiletSystemSpecificPhosphateEsterHydraulicFluid-GeneralPower-SyntheticOilbaseGrease-GeneralPurposeSyntheticOilbaseGrease-GeneralPurposeSyntheticEsterbaseGrease-GeneralPurposeNonAqueousCleaner-General-NonAqueousCleaner–PetroleumBasedE、適用性A319/A320MONTHLYCHECKSPECIFICATION’isapplicabilityforallA319/320aircraftsinShenzhenairline.DonotsigninA319/A320MONTHLYCHECK NOTE:Nosignisneededininspectcolumn.Ifdiscovertheoperationstepandthelatestversionmanualareinconformityintheprocesssuchastheoperation,pleasecarryouttherelatedworkaccordingtothelatestversionmanual. ThesetaskcardsPARTIMSITEM第IMS(1)PerformMS291000-14-1(AMMTASK29-10-00-200-008-A)執(zhí)行MS291000-14-1(AMMTASK29-10-00-200-008-A)(2)PerformMS324411-01-1(AMMTASK32-44-11-200-001-A)執(zhí)行MS324411-01-1(AMMTASK32-44-11-200-001-A)(1)PerformMS279000-05-1 (AMMTASK27-96-00-710-018-A)執(zhí)行MS279000-05-1 (AMMTASK27-96-00-710-018-A)(1)PerformMS383100-06-1 (AMMTASK38-31-00-100-018-A)執(zhí)行MS383100-06-1 (AMMTASK38-31-00-100-018-A) (4)PerformMS321000-02-1(AMMTASK12-22-32-640-001-A)執(zhí)行MS321000-02-1(AMMTASK12-22-32-640-001-A)。(1)PERFORMR2006-03INSPECTIONPORTABLEOXYGENBOTTLEMASKS(REFERTORELIABILITYRESOLUTIONR2006-03)BHYD/ELECY工作內(nèi)容三、PRODUCE/工作內(nèi)PARTIMSITEM/I部分MS檢查CHECKNITROGENCHARGEPRESSUREONHYDRAULICPOWERACCUMULATORS(Ref.AMMTASK29-10-00-200-008-A)JobSet-Makesurethatthehydraulicsystemsaredepressurizedandputtheminthemaintenanceconfiguration.(Ref.AMMTASK29-00-00-864-001).PuttheWARNINGNOTICE(S)inpositionto snottopressurizetheGreen,BlueandYellowhydraulicsystems:-intheflightcompartmentonthehydraulicsectionoftheoverheadpanel-onthegroundservicepanelsoftheGreen,BlueandYellowhydraulicOpen,safetyandtagthis(these)circuitGetOpentheaccesspanels195BBand打開接近面板195BB和Openonemaindoorofthemainlandinggear(Ref.AMMTASK32-12-00-010-NOTE:YoucanopentheleftortherightMLGdoor,butaccessisbetterfromtheleftside工作內(nèi)容DoaCheckoftheNitrogenChargePressureoftheGreen,BlueandYellowSystem Refertothenitrogenpressuregagesoneachofthesystemaccumulators(1070GM),(2070GM)and(3070GM)andmakesurethattheprechargepressureisasfollows:參考每個(gè)液力系統(tǒng)儲(chǔ)壓器上的氮?dú)鈮毫Ρ?1070GM2070GM)(3070GM)讀(Ref.Fig.PressureValueSHEET提示:請(qǐng)?jiān)贏320月檢工作單記錄壓力NOTE:RecordthepressureinA320MONTHLYCHECKNOTE:Awaitingtimeofonehourmakesthemeasurementmoreaccuratebecauseofthetemperaturecompensationoftheaccumulator.Iftheaccumulatorpressureisinthegivenlimits(between"P"and"P"minus15bar(217.5566psi),nomorestepsisnecessary.。IftheaccumulatorpressureismorethanthecorrectpressureAdjusttheaccumulatorpressureasnecessary(Ref.AMMTASKIftheaccumulatorpressureis"P"minusmorethan15bar(217.5566psi),dothestepsthatfollow:工作內(nèi)容Adjusttheaccumulatorpressuretothecorrectnominalvalue"P"(Ref.AMMTASK12-14-29-614-001).After20minutesdoacheckoftheaccumulatorpressure:提示:請(qǐng)?jiān)贏320月檢工作單記錄壓力NOTE:RecordthepressureinA320MONTHLYCHECKIftheaccumulatorpressurehasthecorrectvalue"P", plus/minus7bar(101.5264psi):如果儲(chǔ)壓器壓力在正確”P”的加/7(101.5264psi)范圍內(nèi)-nomorestepsare.Iftheaccumulatorpressureis7bar(101.5264psi)ormoreabovethecorrectvalue“P”:-reducetheaccumulatorpressuretothecorrectvalueIftheaccumulatorpressureis"P"minusmorethan7bardothis-DoaleakcheckwiththeoxygenleakdetectorTestingMedium-LeakDetection-OxygenSystem(MaterialNo.14CCB6) onthegasmanifoldoftheaccumulator.用氧氣滲漏探測(cè)試驗(yàn)介質(zhì)(MaterialNo14CCB6)在儲(chǔ)壓器上的氣管上做Ifitispossibletostoptheleaksandpressurizetheaccumulator(Ref.AMMTASK12-14-29-614-001).Ifitisnotpossibletostoptheleaks,replacetheaccumulator,gage,chargingvalveormanifoldasnecessary:-Greenhydraulicsystem(Ref.AMMTASK29-11-42-000-001)/(Ref.AMMTASK29-11-42-400-001)/(Ref.AMMTASK29-11-21-000-001)/(Ref.綠系統(tǒng)(參考TASKAMM29-11-42-000-001參考AMM工作內(nèi)容29-11-42-400-001參考AMMTASK29-11-21-000-001參考AMMTASK29-11-21-400-001).-Bluehydraulicsystem(Ref.AMMTASK29-12-42-000-001)/(Ref.AMMTASK29-12-42-400-001)/(Ref.AMMTASK29-12-21-000-001)/(Ref.AMMTASK29-12-21-400-001).藍(lán)系統(tǒng)(參考AMMTASK29-12-42-000-001參考AMM29-12-42-400-001參考AMMTASK29-12-21-000-001參考AMMTASK29-12-21-400-001).-Yellowhydraulicsystem(Ref.AMMTASK29-13-42-000-001)/(Ref.AMMTASK29-13-42-400-001)/(Ref.AMMTASK29-13-21-000-001)/(Ref.29-13-42-400-001參考AMMTASK29-13-21-000-001參考AMMTASK29-13-21-400-001).Iftherearenoexternal1Replacethe GreenhydraulicSystem(Ref.AMMTASK29-11-42-000-001)/(Ref.AMMTASK29-11-42-400-001).綠系統(tǒng).(參考AMMTASK29-11-42-000-001)/(參考AMMTASK BluehydraulicSystem(Ref.AMMTASK29-12-42-000-001)/(Ref.AMMTASK29-12-42-400-001).藍(lán)系統(tǒng)(參考AMMTASK29-12-42-000-001)/(參考AMMTASK YellowhydraulicSystem(Ref.AMMTASK29-13-42-000-001)/(Ref.AMMTASK29-13-42-400-001).黃系統(tǒng)(參考AMMTASK29-13-42-000-001)/(參考AMMTASK2Dotheapplicablebleeding-DothebleedingprocedureoftheGreenhydraulicsystemdownstreamoftheenginepump(Ref.AMMTASK29-00-00-870-003)-DothebleedingprocedureoftheBluehydraulicsystemdownstreamoftheBlueE-pump(Ref.AMMTASK -DothebleedingprocedureoftheYellowhydraulicsystemdownstreamoftheenginepump(Ref.AMMTASK29-00-00-870-007).BHYD/ELECY工作內(nèi)容NOTE:Whenyoudothebleedingprocedure,nitrogen,whichhasgoneintothehydraulicsystemfromthedefectiveaccumulator,isremoved.CloseMakesurethattheworkareaiscleanandclearoftool(s)andotherClosetheaccesspanels195BBand關(guān)閉接近面板195BBClosetheapplicablemaindooroftheMLG(Ref.AMMTASK32-12-00-410-Removethewarning.Removethesafetyclip(s)andthetag(s)andclosethis(these)circuit‘工作內(nèi)容2.FunctionalCheckofParking/EmergencyBrakeAccumulatorbyReadingtheChargePressureontheAccumulatorGauge((Ref.AMMTASK32-44-11-200-001-A)通過(剎車)儲(chǔ)壓器上的(氣壓)表功能檢查氮?dú)鈮毫Γ▍⒖糀MMTASK32-44-11-200-001-A)WARNING:MAKESURETHATTHEGROUNDSAFETY-LOCKSAREINPOSITIONONTHELANDINGGEAR.1.JobSet-MakesurethatthewheelchocksareinEnergizetheGroundService Ontheparkingbrakepanel110VU,makesurethatthePARKINGBRKcontrol-switch(73GG)isintheOFFposition.MakesurethattheYellowhydraulicsystemisdepressurized.(Ref.AMMTASKOpen,safetyandtagthis(these)circuit 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGANDSTEERING/SYS1/IND SafetyPuttheWARNINGNOTICE(S)inpositiontol snottopressurizetheyellow工作內(nèi)容onthepanel40VUintheontheGroundServicePaneloftheyellowhydraulicsystem,accessdoorD.GetPuttheACCESSPLATFORM2M(6FT)-ADJUSTABLEinpositioninzone2.A.CheckoftheNitrogenFillNOTE:Ifyoudothischeckimmediayafteraircraftlanding,letthepressure stableforonehourtogetamoreaccuratevalue(temperaturecompensationoftheaccumulator)1個(gè)小時(shí)進(jìn)行穩(wěn)定以得到精確的測(cè)量值(儲(chǔ)壓Onthebrakemanifold在剎3016GMOperatethemanualdepressurizationbuttononthebrakereliefvalve3067GMtoreleasethehydraulicpressureinthebrakesystem.Letthepressure establefortenminutesbeforeyoureadthevalueonthepressuregage.Refertothebrake-accumulatorpressure-gage2585GMonthebrakeYellow-pressureaccumulator2582GM.Makesurethatthefillpressureisasfollows:deg.deg."P""P"工作內(nèi)容0提示:請(qǐng)?jiān)贏320月檢工作單記錄溫度和壓NOTE:RecordTEMPandPRESSUREinA320MONTHLYCHECK(a)Ifthevalueontheaccumulatorpressuregageiscorrect(value"P"plusorminus50psi(3.45bar)): Noothermaintenanceisnecessary,gotopara-無需做工作,轉(zhuǎn)到段3結(jié)束此項(xiàng)檢查Ifthevalueontheaccumulatorpressuregageismorethanvalue"P"plus50psi(3.45bar):-Adjustthenitrogenpressureasnecessary (Ref.AMMTASK12-14-32-614-002).如果儲(chǔ)壓器壓力值大于"P50psi3.45參照手冊(cè)按需調(diào)整壓力值(RefAMMTASK12-14-32-614-002Ifthevalueontheaccumulatorpressuregageisbetweenvalue"P"minus50psi(3.45bar)and"P"minus217.56psi(15.00bar).Adjustthenitrogenpressureasnecessary (Ref.AMMTASK12-14-32-614-002)..如果儲(chǔ)壓器壓力值在"P50psi3.45bar)"P217.56psi15.00bar)Ifthevalueontheaccumulatorpressuregageislessthanvalue"P"217.56psi(15.00bar)(Adjustthenitrogenpressureasnecessary(Ref.AMMTASK12-14-32-614-002) 工作內(nèi)容PressurizetheYellowhydraulicsystemwiththeelectricpump(Ref.AMMTASK29-24-00-863-001).Inthecockpit,doacheckofthebrakeaccumulatorpressureonthetriplepressure-indicator60GG.Letthepressureincreaseto3000psi(206.84bar)and estable.psi(206.84bar)并穩(wěn)定。Whentheaccumulatorpressureisstable,stoptheelectric·Onthebrakemanifold3016GM,operatethemanualdepressurizationbuttononthebrakerelief-valve3067GMtodepressurizetheaccumulator3After20minutes,doagainthecheckofthevalueontheaccumulatorpressure Iftheaccumulatorpressurehasthecorrectvalue"P"plusor101.53psi(7.00·NomorestepsarebIftheaccumulatorpressureismorethanthecorrectvalue"P"101.53psi(7.00·ReducetheaccumulatorpressuretothecorrectvaluecIftheaccumulatorpressureislessthanthecorrectvalue"P"101.53psi(7.00bar),doaleakcheckwithTestingMedium-LeakDetection-OxygenSystem(MaterialNo.14CCB6) on:·質(zhì)(MaterialNo.14CCB6)做滲漏測(cè)試,在如下部件:Thechargingvalve2586GM,·Theaccumulatorpressure-gage2585GM,工作內(nèi)容·TheadapteratthetopendoftheaccumulatorIfyoufindleaks,doacheckofthespecifiedtorquevalueontheapplicablenutorconnectionwhereyoufindaleak.Then,adjustthenitrogenpressure (Ref.AMMTASK12-14-32-614-002).檢查。然后調(diào)節(jié)氮?dú)鈮毫?參考AMMTASK12-14-32-614-002).Ifyoucannotstoptheleaks,replacethedefectiveequipment(s)asReplacetheaccumulator2582GMand/oritsadapter(Ref.AMMTASK32-44-11-000-001)and(Ref.AMMTASK32-44-11-400-001). (參考AMMTASK32-44-11-400-001Replacetheaccumulatorpressure-gage2585GM(Ref.AMMTASK32-44-14-400-001).和(參考AMMTASK32-44-14-400- Replacethechargingvalve2586GM更換充氣活門2586GM(AMMTASK32-44-13-000-001)和(參考AMMTASK32-44-13-400-001).IftherearenoexternalReplacetheaccumulator2582GM(Ref.AMMTASK32-44-11-000-001)and(Ref.AMMTASK32-44-11-400-001).更換儲(chǔ)壓器2582GM(參考AMMTASK32-44-11-000-001)和(參考AMMTASK32-44-11-400-001). Ifyoureplacetheaccumulator,bleedtheYellowhydraulicsystem downstreamoftheenginepumptoremovethenitrogenthatcanbeinthehydraulicsystem(becauseoftheaccumulator).3.Close-工作內(nèi)容Removethesafetyclip(s)andthetag(s)andclosethis(these)circuit 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGAND 121VUHYDRAULIC/BRAKINGANDSTEERING/SYS1/IND RemovalofMakesurethattheworkareaiscleanandclearoftool(s)andotherRemovethewarningRemovetheaccessClosePuttheaircraftbacktoitsinitial‘Figure32-44-11-991-00400-00-B/-AccumulatorNitrogenFill-PressureONA/CALL工作內(nèi)容3.CheckoftheElectricalMasterChipDetectorforParticles-Engine(AMMTASK79-00-00-281-002-A)(ForA/CwithCFM56-5BENGs)1.JobSet-A.SafetyOnthecenterpedestalontheENGpanel115VU:在操作臺(tái),發(fā)動(dòng)機(jī)面板115VU上:(a)putaWARNINGNOTICE(S) snottostarttheMakesurethattheengine1(2)shutdownoccurrednotlessthan5minutesbeforeyoudothisprocedure.MakesurethattheONlegendoftheENG/FADECGNDPWR/1(2)pushbuttonswitchisoff.Putawarningnotice snottoenergizetheFADECB.Openthefancowl 打開風(fēng)扇整流罩:(參考AMMTASK71-13-00-010- 2.procedures(RefFig3)A.InspectionoftheElectricalMasterChipDetector(1)InspecttheElectricalMasterChipDetector(EMCD) (Ref.AMMTASK79-00-00-281-004).工作內(nèi)容Ifanyfindings,doacheckofFwd,AftSump,AGBandTGBScavengeScreens(Ref.AMMTASK79-00-00-281-003) forfurthertroubleshooting.Ifanyfindings,performGroundRunforAdditionalParticleCollection AMMTASK79-00-00-281-006) forfurthertroubleshooting.Ifnofindings,nofurther3.Close-A.CloseMakesurethattheworkareaiscleanandclearoftool(s)andotherClosethefancowldoors:(Ref.TASK71-13-00-410-FOR1000EM1 437AL,438ARFOR1000EM2 447AL,448AR(3)Removethewarning工作內(nèi)容4.CheckMasterMagneticChipDetectorforEvidenceofMetallicDebris-Engine(AMMTASK79-00-00-200-013-A)(ForA/CwithV2500ENGs)WARNING:DONOTGETENGINEOILONYOURSKINFORALONGTIME.FLUSHTHEOILFROMYOURSKINWITHWATER.THEOILISPOISONOUSANDCANGOTHROUGHYOURSKINANDINTOYOURBODY.WARNING:BECAREFULWHENYOUWORKONTHEENGINECOMPONENTSIMMEDIAYAFTERTHEENGINEISSHUTDOWN.THEENGINECOMPONENTSCANSTAYHOTFORUPTOONEHOUR.CAUTION:DONOTLETENGINEFUELOROILFALLONTHEENGINE.UNWANTEDFUELOROILMUSTBEREMOVEDIMMEDIAYWITHACLEANLINTFREECLOTH.THEFUELOROILCANCAUSEDAMAGETOTHESURFACEPROTECTIONANDTOSOMEPARTS.1.JobSet-A.SafetyOnthecenterpedestal,ontheENGpanelPutaWARNINGNOTICE(S) snottostarttheMakesurethattheengine1(2)shutdownoccurrednotlessthan5minutesbeforeyoudothisOntheoverheadmaintenancepanelMakesurethattheONlegendoftheENG/FADECGNDPWR/1(2)pushbuttonswitchisPutaWARNINGNOTICE(S) snottoenergizetheFADEC2.工作內(nèi)容RemovetheMasterMCD(Ref.RemovetheMasterMCD.(Ref.AMMTASK79-22-45-000-010)拆下主磁性碎屑探測(cè)器(參考AMMTASK79-22-45-000-010InspectthemasterMCDformetallicMetallicdebrisnotReturnenginetoMetallicdebrisInspectallMCD's(Ref.AMMTASK79-00-00-200-011)andoilfilter(Ref.AMMTASK79-00-00-200-012).檢查所有的磁性碎屑探測(cè)器(參考AMMTASK79-00-00-200-011)和滑油濾(參考AMMTASK79-00-00-200-012)InstalltheMasterInstallcleanMaster 3.Close-A.PuttheaircraftbacktoitsinitialMakesurethattheworkareaiscleanandclearoftool(s)andotherRemovethewarning工作內(nèi)容5.CheckChipDetector—EngineStarter(AMMTASK80-11-10-210-001-C)(ForA/CwithCFM56-5BENGs)JobSet-SafetyOnthecenterpedestal,ontheENGpanelPutaWARNINGNOTICE(S) snottostarttheMakesurethattheengine1(2)shutdownoccurrednotlessthan5minutesbeforeyoudothisOntheoverheadmaintenancepanelMakesurethattheONlegendoftheENG/FADECGNDPWR/1(2)pushbuttonswitchisoff.)PutaWARNINGNOTICE(S) snottoenergizetheFADECB.Openthefancowldoors:(Ref.TASK71-13-00-010-FOR1000EM1 (ENGINE-1)437AL,438AR 447AL,448AR2.A.Removalofstartermagneticplugfor(1)Removetheknurledmagneticplug(90)fromoildrainplug(a)Pushandturncounter-clockwisetoreleasetheplug工作內(nèi)容NOTE:Theoildrainplug(110)hasabuilt-incheckvalvetopermitremovalofmagneticplug(90)withoutdrainingoilfromthestarter.B.InspectionoftheMagneticPlugProbeNOTE:Beforeexaminationformetalparticles,carefullypreventafurthercontaminationofthemagneticplugprobebymetalparticlesfromthetoolboxorworkarea.Examinethemagneticplugprobeforthetyandtypeofthecontaminants.Ifthecontaminanitionyouseeontheprobelooksimportant,doasfollows:NOTE:Carbonanddirtmayformsludgeontheprobealongwithmetalparticles,andcausemisleadingappearanceinthetyofcontamination.CleantheprobewithTISSUEPAPERandretaintheremovedExaminethemetalliccontaminantsunderaMAGNIFYINGGLASSPOWER10X.Usetheinspectioncriteriawhichfollow:AsmallaccumulationoffinesliversandrelativelyflatflakesofmetalshowsanormalAlargeraccumulationofparticles,orparticleslargerthan0.1in.(2.54mm)inanydirection,showthereissomeinternaldamageandthatastarterreplacementisnecessary.(Ref.TASK80-11-10-000-002)and(Ref.TASK80-11-10-400-002).壞,必須更換啟動(dòng)機(jī)(Ref.TASK80-11-10-000-002)和(Ref.TASKCInstallationofMagneticPlugafter -65的起動(dòng)機(jī)為POSTCFM-5BS/B80-0006構(gòu)型; -27/-28的起動(dòng)機(jī)為POSTCFM-5BS/B80-0013構(gòu)型。RemoveanddiscardthetwoO-ringsCP2442)andputthemontheknurledmagneticplug工作內(nèi)容(3)Installtheknurledmagneticplug(90)inoildrainplug(a)PushinwardandturnclockwisetoengagelockingD.Dotheservicingofthestarter,ifnecessary(Ref.TASK12-13-80-610-3.Close-A.CloseMakesurethattheworkareaiscleanandclearoftool(s)andotherClosethefancowldoor:(Ref.TASK71-13-00-410-FOR1000EM1 (ENGINE-1)437AL,438AR 447AL,448ARRemovethewarningEngineStarterEngineStarter工作內(nèi)容CheckoftheIDGOilLevelandOil-FilterDifferential-PressureIndicator(DPI)(AMMTASK24-21-00-210-046-A)(ForA/CwithCFM56-5BENGs)(WARNING:BECAREFULWHENYOUWORKONTHEENGINECOMPONENTS YAFTERTHEENGINEISSHUTDOWN.THEENGINECOMPONENTSCANSTAYHOTFORUPTOONEHOUR.WARNING:BECAREFULWHENYOUUSECONSUMABLEMATERIALS.OBEYTHEMATERIALMANUFACTURER'SINSTRUCTIONSANDYOURLOCALCAUTION:DONOTDOTHISTASKIFTHEIDGISBEFOREYOUDOACHECKOFTHEIDGOILLEVEL,MAKESURETHATTHEIDGISCONNECTED.ADISCONNECTEDIDGCANCAUSEANINCORRECTTYINDICATIONANDTHUSINCORRECTSERVICING.IFTHELEVELISTOOHIGHORTOOLOW,DAMAGECANOCCURTOTHEIDGWHENIT導(dǎo)致確的滑油量顯示以及不正確的勤務(wù)工作。如果滑油位過高或過低,在IDG工作JobSet-SafetyOnthecenterpedestal,ontheENGpanelPutaWARNINGNOTICE(S)inposition snottostarttheMakesurethattheengine1(2)shutdownoccurrednotlessthan5minutesbeforeyoudothisprocedure.OntheoverheadmaintenancepanelMakesurethattheONlegendoftheENG/FADECGNDPWR/1(2)pushbuttonswitchisoff.PutaWARNINGNOTICE(S)inpositiontol snottoenergizetheFADEC工作內(nèi)容B.Opentheaccesspanelofthefan438DRorFOR1000EM2(ENGINE-2)448DRor448ARCheckoftheOilWARNING:DONOTGETTHEFLUIDONYOURSKINORINYOUREYES.IFYOU-FLUSHITAWAYWITHCLEAN-GETMEDICALDoacheckoftheoillevelsight-glasstomakesurethatnocontaminationpreventsthecorrectviewoftheoillevel.Ifthereiscontamination,cleantheoillevelsight-glasswithcleaningagents.Afteryoucleantheoillevelsight-glass:-removetheremainingsolventandcontaminationwithaclean,drycloth,-blowcompressedaironthesight-glasstodryLettheIDG establefor5minutesminimumaftertheengineOneachengine,usethesightglassthatisintheverticalpositiontodothecheckoftheoilIftheoillevelisbelowthegreenbandorabovetheyellowband,dotheoilservicing(Ref.AMMTASK12-13-24-612-041).NOTE:Aninternaloilconsumptionof1ccispermittedforeachflighthourorwhentheenginesoperate.提示:每飛行1小時(shí)或發(fā)動(dòng)機(jī)的每次允許有1cc滑油內(nèi)耗工作內(nèi)容IDGServicingFillingoftheIDGwithOilorAdditionofOilafteraLevelCheckIDG勤務(wù)-給IDG加滑油或油面檢查后補(bǔ)加滑油WARNING:BECAREFULWHENYOUWORKONTHEENGINECOMPONENTSIMMEDIAYAFTERTHEENGINEISSHUTDOWN.THEENGINECOMPONENTSCANSTAYHOTFORUPTOONEHOUR.WARNING:WEARGOGGLES,INSULATEDGLOVESANDOTHERPROTECTIVEHOTOILCANBURNYOUREYESANDIFOILTOUCHESYOUREYESORSKIN,GETMEDICALCAUTION:DONOTOPERATETHE-IFITCONTAINSTOOMUCH-IFITDOESNOTCONTAINENOUGHIFYOUDO,YOUCANCAUSEDAMAGETOTHECAUTION:USEONLYNEWCANSOFOILWHENYOUFILLTHEIDGWITHOILORADDOILTOTHEIDG.THECONTAMINATIONINOILTHATSTAYSINOPENCANSCANCAUSEFASTDETERIORATIONOFTHEOILANDWILLDECREASETHELIFEOFTHEIDG.CAUTION:REMOVETHEREMAININGOILFROMTHEFILLINGEQUIPMENT.FILLTHEEQUIPMENTONLYWITHNEWCANSOFOILBEFOREYOUFILLTHEIDGWITHOILORADDOILTOTHEIDG.THECONTAMINATIONINTHEOILTHATSTAYSINTHEFILLINGEQUIPMENTCANCAUSEFASTDETERIORATIONOFTHEOILANDWILLDECREASETHELIFEOFTHE 誡:從加油設(shè)備中取出剩余的滑油.用加油設(shè)備加油到IDG或者給IDG加油前只能只CAUTION:DONOTUSESOLVENTSTHATCONTAINCHLORINETOCLEANEQUIPMENT(PUMP,HOSES,ANDFUNNEL)USEDTOFILLTHEIDGWITHOIL.工作內(nèi)容CHLORINECONTAMINATIONOFTHEOILCANCAUSEFASTDETERIORATIONOFTHEOILANDWILLDECREASETHELIFEOFTHECAUTION:DONOTDOTHESERVICINGOFADISCONNECTEDIDG.CONTINUEDOPERATIONOFADEFECTIVEIDGCANCAUSEDAMAGE.JobSet-Energizethegroundservicenetwork(Ref.AMMTASK24-42-00-861-001)SafetyOnthecenterpedestal,ontheENGpanelaPutaWARNINGNOTICE(S)inposition snottostarttheMakesurethattheengine1(2)shutdownoccurrednotlessthan5minutesbeforeyoudothisprocedure.OntheoverheadmaintenancepanelMakesurethattheONlegendoftheENG/FADECGNDPWR/1(2)pushbuttonswitchisoff.PutaWARNINGNOTICE(S)inpositiontol snottoenergizetheFADEC1(2).Openthefancowldoors(Ref.AMMTASK71-13-00-010-040) 工作內(nèi)容 d)Makethethrustreverserunserviceable(Ref.AMMTASK78-30-00-481-041)2)WARNING:POINTTHEOVERFLOWDRAINHOSEINTOACONTAINERWHENYOUCONNECTTHEHOSETOTHEOVERFLOWDRAINHALF-COUPLING.THISWILLPREVENTBURNSFROMTHEHOTOILSPRAY.HOTOILCANCAUSEBURNSTOEYESANDSKIN.CAUTION:DONOTUSEDEVICESOTHERTHANTHEAPPROVEDOVERFLOWDRAIN-HOSEFITTING.HARDMETALOBJECTSSUCHASSCREWDRIVERSCANCAUSEDAMAGETOTHEOVERFLOWDRAINHALF-COUPLINGSEAT.PutaCONTAINER10L(21/2USGAL)belowtheIDGRemovethedustcap(3)fromtheoverflowdrainhalf-couplingPuttheendoftheoverflowdrainhose(7)oftheFILLINGEQUIPMENT-OIL,DH13PMTYPintheCONTAINER10L(21/2USGAL).DothissteptodepressurizetheIDGaConnecttheoverflowdrainhose(7)oftheFILLINGEQUIPMENT- DH13PMTYPtotheoverflowdrainhalf-coupling(4).NOTE:Someoilcancomeoutoftheoverflowdrainhose(7)oftheFILLINGEQUIPMENT- OIL,DH13PMTYPwhenyouconnectit.提示:連接時(shí),一些滑油會(huì)從添加設(shè)備DH13PMTYP的溢流排放管(7)中流工作內(nèi)容CAUTION:USEONLYAPPROVEDTYPES/BRANDSOFLUBRICANTS.DONOTMIXTYPES//BRANDSOFLUBRICANTS.CAUTION:BEFOREYOUCHANGETOANEWBRANDOFOIL,CONTACTTHEIDGMANUFACTURERIFYOUSTARTTHEENGINESINCOLDWEATHERCONDITIONS.BECAUSEOFTHECOMBINATIONOFIDGMODEL,IDGLOW-TEMPERATURESTARTANDOILWITHPOSSIBLELOWELECTRICALCONDUCTIVITY,THEREISARISKOFDAMAGETOTHEIDGROTATINGDIODES.FillingoftheIDGwithNOTE:IncaseofOILtype/brandchange,referto(Ref.AMMTASK24-21-00-612-046).NOTE:Inrain,fogorwetconditions,becarefultopreventwatercontaminationoftheIDGoilduringthefillingprocedure.Removethedustcap(2)fromthepressurefillhalf-couplingConnectthepressurefillhose(1)oftheFILLINGEQUIPMENT- DH13PMTYPtothepressurefillhalf-coupling(6).FilltheIDGwithfilteredSyntheticbaseLubricatingOil-TurbineEngine(MaterialNo.03ABA1)ata umpressureof35psi2.4132bar在油(MaterialNo03ABA1NOTE:TheAMM20-34-00givesalistofapprovedoilbrand-namesforIDGStopthisoperationwhenthetyofoilcollectedfromtheoverflowdrainhose(7)oftheFILLINGEQUIPMENT- OIL,DH13PMTYPis0.95l(0.2510USgal)工作內(nèi)容RemovaloftheDisconnectthepressurefillhose(1)oftheFILLINGEQUIPMENT- DH13PMTYPfromthepressurefillhalf-coupling(6).Installthedustcap(2)onthepressurefillhalf-couplingWaitfortheflowofoilfromtheoverflowdrainhose(7)todecreaseandeonlydrops.RemovetheoverflowdrainhoseInstallthedustcap(3)ontheoverflowdrainhalf-couplingIfyoureplacedapartoftheoilsystem(filter,externalsystemcomponent,drainplug),doadrymotoringforleakcheckbeforeinspection (Ref.AMMTASK71-00-00-710-001).干轉(zhuǎn)檢查滲漏情況(參考AMMTASK71-00-00-710-001)InspectionoftheOilNOTE:Tofilltheexternaloilsystemtoitsumlevelbeforetheoillevelcheck,itisnecessaryto:-Dry-motortheengine(Ref.AMMTASK71-00-00-710-001)fortwominutes,ortoNOTE:TheIDGoiltemperatureisshownonthelowerECAMdisplayunit.Iftheoiltemperatureisthesameastheambientairtemperature,theoiliscold.Iftheoiltemperatureismorethantheambientairtemperature,theoilishot. Inspectionoftheoillevelwithdry工作內(nèi)容CAUTION:IFYOUDRY-MOTORTHEENGINE,MAKESURETHATTHEOILLEVELISSTABLEBEFOREYOUDOTHEINSPECTION.THEOILLEVELWILL ESTABLEONLYAFTER30MINUTES.THUSTHELEVELINDICATIONSONTHESIGHTGLASSWILLNOTBECORRECTBEFORETHEENDOFTHISPERIOD.IFYOUADDOILWHENITISNOTNECESSARY,THEREISARISKTHATYOUWILLCAUSEFAILUREOFTHEIDG.Waitthirtyminutestolettheoilinthe eLookattheoillevelsightglassoftheIftheoilisIftheoillevelisatornearthetopofthegreenband,oilservicingisnotIftheoillevelisbelowthegree
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 岳麓版高中經(jīng)濟(jì)史獲獎(jiǎng)?wù)n件戰(zhàn)后資本主義的調(diào)整
- 內(nèi)蒙古阿拉善盟2025屆高三壓軸卷數(shù)學(xué)試卷含解析
- 廣西賀州市2025屆高考數(shù)學(xué)四模試卷含解析
- 2025屆湖南省桃江縣一中高三下學(xué)期第六次檢測(cè)語文試卷含解析
- 2025屆廣東省清遠(yuǎn)市陽山縣陽山中學(xué)高三第四次模擬考試英語試卷含解析
- 數(shù)據(jù)資產(chǎn)管理體系建設(shè)指南(雷澤佳編制-2024)
- 貴州省貴定縣第二中學(xué)2025屆高三考前熱身語文試卷含解析
- 江蘇省鹽城市、南京市2025屆高三第二次模擬考試語文試卷含解析
- 8.2《登高》課件 2024-2025學(xué)年統(tǒng)編版高中語文必修上冊(cè)
- 《教學(xué)與科研》課件
- 項(xiàng)目總工崗位職責(zé)及考核細(xì)則
- 醫(yī)院三基考試試題
- 華師大版數(shù)學(xué)七年級(jí)上冊(cè)教案4:5.2《平行線的判定》參考教案
- 糖尿病腎病腹膜透析課件
- DL∕T 2045-2019 中性點(diǎn)不接地系統(tǒng)鐵磁諧振防治技術(shù)導(dǎo)則
- 國家開放大學(xué)《勞動(dòng)關(guān)系與社會(huì)保障實(shí)務(wù)》章節(jié)測(cè)試參考答案
- 森吉米爾軋機(jī)-硅鋼軋制工藝技術(shù)
- 《習(xí)作二十年后的家鄉(xiāng)》評(píng)課稿
- 低溫液體的安全處理課件
- 病態(tài)竇房結(jié)綜合癥護(hù)理查房課件
- 《兄弟》作品簡介名著導(dǎo)讀PPT模板
評(píng)論
0/150
提交評(píng)論