扣件式鋼管腳手架施工方案_第1頁(yè)
扣件式鋼管腳手架施工方案_第2頁(yè)
扣件式鋼管腳手架施工方案_第3頁(yè)
扣件式鋼管腳手架施工方案_第4頁(yè)
扣件式鋼管腳手架施工方案_第5頁(yè)
已閱讀5頁(yè),還剩19頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

潮安迎賓館二期工程 腳手架施工方案潮安迎賓館 D棟商鋪腳手架工程專項(xiàng)施工方案編制單位: 央邦建設(shè)集團(tuán)股份有限公司編 制:審 核:審 批:編制日期:央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第1頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案目 錄編制依據(jù)及工程概況········································3施工程序··················································3搭設(shè)材料··················································4腳手架搭設(shè)················································5拆除·····················································12檢查與驗(yàn)收···············································13安全管理·················································15懸挑架計(jì)算(卸荷三角架)··································16連墻桿計(jì)算···············································20落地式雙排腳手架計(jì)算·····································20央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第2頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案扣件式鋼管外腳手架施工方案編制依據(jù)及工程概況1.1.編制依據(jù)1.1.1.《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》 (JGJ130-2001)1.1.2.《建筑施工安全檢查標(biāo)準(zhǔn)》(JGJ59-99)1.1.3.《建筑施工高處作業(yè)安全技術(shù)規(guī)范》(JGJ80-91)1.1.4.《北京市建筑施工現(xiàn)場(chǎng)安全防護(hù)基本標(biāo)準(zhǔn)》1.2.工程概況工程名稱:潮安迎賓館建設(shè)單位:東森實(shí)業(yè)有限公司建設(shè)地點(diǎn):廣東省潮州市潮安區(qū)潮安大道北側(cè)、金里路西側(cè)結(jié)構(gòu)類型:本工程設(shè)計(jì)為框架結(jié)構(gòu), 設(shè)計(jì)為混凝土預(yù)制管樁基礎(chǔ)。工程規(guī)模:潮安迎賓館項(xiàng)目位于潮州市潮安區(qū)潮安大道北側(cè)、金里路西側(cè),擬建D棟為商鋪、樓高4層、首層占地面積約為5630㎡,未設(shè)置地下室。擬建游泳池面積約為8000㎡、最深池底相對(duì)標(biāo)高-2.30M(相對(duì)潮安大道路面),在游泳池中設(shè)置4個(gè)水上吧臺(tái)。D棟設(shè)計(jì)結(jié)構(gòu)類型為鋼筋混凝土框架結(jié)構(gòu),擬建建筑物的工程重要性為三級(jí), 安全等級(jí)為二級(jí),巖石勘察等級(jí)為乙級(jí)。施工程序擺放掃地大橫桿→逐根樹立立桿 (隨即與掃地大橫桿扣緊)→裝掃地央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第3頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案小橫桿(隨即與立桿或掃地大橫桿扣緊 )→安第一步大橫稈 (隨即與各立桿扣緊)→安第一步小橫桿→安裝第二步大橫扦→安裝第二步小橫桿→加設(shè)臨時(shí)斜撐桿(上端與第二步大橫仔扣緊.在裝設(shè)兩道連墻桿后可拆除 )→第三、四步大橫桿和小橫桿→連墻桿→接立桿→加設(shè)剪刀撐→鋪腳手板→鋪設(shè)安全網(wǎng)。搭設(shè)材料3.1.鋼管3.1.1. 鋼管規(guī)格及材質(zhì)要求鋼管均采用 48×3.5mm高頻焊接鋼管。其材質(zhì)應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)《碳素結(jié)構(gòu)鋼》(GB/T-700)中Q235-A級(jí)鋼的規(guī)定。3.1.2. 外觀檢查鋼管外觀應(yīng)平直光滑,沒(méi)有裂縫、折痕、結(jié)疤、分層、嚴(yán)重銹蝕(內(nèi)、外壁)和硬彎曲等現(xiàn)象。鋼管必須涂有防銹漆。3.1.3. 鋼管上嚴(yán)禁打孔3.2. 扣件3.2.1. 材質(zhì)采用可鍛鑄鐵制作的扣件,其材質(zhì)應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)《鋼管腳手架扣件》(GB15831)的規(guī)定。3.2.2. 外觀檢查扣件使用前應(yīng)進(jìn)行質(zhì)量檢查, 有裂紋、缺爪、螺栓斷絲或滑絲的嚴(yán)禁使用。3.3. 腳手板央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第4頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案均采用50mm厚、寬度不少于200mm的松木,其材質(zhì)應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)《木結(jié)構(gòu)設(shè)計(jì)規(guī)范》(GBJ5)中Ⅱ級(jí)材質(zhì)的規(guī)定,不得使用腐朽的腳手板。3.4. 安全網(wǎng)3.4.1.平網(wǎng)平網(wǎng)材質(zhì)、網(wǎng)繩直徑、網(wǎng)眼尺寸、斷裂強(qiáng)度應(yīng)符合現(xiàn)行標(biāo)準(zhǔn)《安全網(wǎng)》(GB5725-1997)的規(guī)定。3.4.2. 密目安全立網(wǎng)密目安全立網(wǎng)的網(wǎng)目密度不低于 800目/100cm2,其技術(shù)要求應(yīng)符合《密目式安全立網(wǎng)》(GB16909-1997)的規(guī)定3.4.2. 阻燃安全網(wǎng)必須具有阻燃性,其續(xù)燃、陰燃時(shí)間均不超過(guò) 4s。腳手架搭設(shè)4.1. 搭設(shè)基本尺寸外架搭設(shè)基本尺寸表(m)立桿縱距立桿橫桿水平距La步距連墻桿備注橫距作業(yè)層非作業(yè)1.501.001.80La/2La不大于二步三跨4.2. 底座4.2.1. 墊板定位。 立桿應(yīng)事先進(jìn)行尺寸排列設(shè)計(jì),使墊板準(zhǔn)確地放在定位線上。4.2.2. 墊板長(zhǎng)度。 墊板宜采用長(zhǎng)度不少于 2跨、厚度不小于50mm央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第5頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案的木墊板或槽鋼。4.2.3.立桿墊座。墊座采用150×150×10鋼板,中間加焊100㎜長(zhǎng)φ20的鋼筋;為防止位移,將墊塊鋼板用2寸鐵釘固定在下部木墊板上。4.3. 掃地桿設(shè)置4.3.1. 落地式腳手架均設(shè)縱、橫向掃地桿。4.3.2. 縱向掃地桿距底座≯200mm,橫向掃地桿用直角扣件固定在緊靠縱向掃地桿下方的立桿上。4.4.立桿4.4.1. 立桿接長(zhǎng)。 除頂層、頂部可采用搭接外,其余各層各步距接頭必須采用對(duì)接扣件連接。對(duì)接、搭接與搭設(shè)應(yīng)符合下列規(guī)定:(1)立桿對(duì)接頭位置兩根相鄰立桿的對(duì)接接頭不應(yīng)設(shè)置在同一步內(nèi), 同步內(nèi)隔一根立桿的兩個(gè)接頭在高度方向錯(cuò)開的距離不宜小于 500mm;各接頭中心至主節(jié)點(diǎn)的距離不宜大于步距的 1/3。(2)立桿搭接搭接長(zhǎng)度不應(yīng)小于 1m,應(yīng)采用不少于 2個(gè)旋轉(zhuǎn)扣件固定,端部扣件蓋板的邊緣至桿端距離不應(yīng)小于 100mm。4.4.2. 頂層立桿立桿頂端應(yīng)高出女兒墻 1.2m,高出檐口上皮 1.5m。4.4.3. 立桿與拋撐。開始搭設(shè)立桿時(shí),應(yīng)每隔 6跨設(shè)置一根拋撐,直至連墻件安裝穩(wěn)定后,方可根據(jù)情況拆除。4.4.4. 立桿必須用鋼管與墻可靠的連接。央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第6頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案4.5. 縱向水平桿(大橫桿)4.5.1.搭設(shè)相對(duì)位置??v向水平鋼管宜設(shè)置在立桿內(nèi)側(cè), 其長(zhǎng)度不應(yīng)小于3跨。4.5.2.接長(zhǎng)方法??v向水平桿接長(zhǎng)宜采用對(duì)接扣件連接,也可采用搭接。搭接長(zhǎng)度≮1m,應(yīng)等間距設(shè)置3個(gè)扣件,桿端距扣件蓋板邊緣≮100mm。4.5.3. 對(duì)接扣件交錯(cuò)布置。 兩根相鄰縱向水平桿的接頭不宜設(shè)置在同步或同跨內(nèi);不同步或不同跨兩個(gè)相鄰接頭在水平方向錯(cuò)開的距離不應(yīng)小于500m;各接頭中心至最近主節(jié)點(diǎn)的距離不宜大于縱距的 1/3。4.5.4. 縱向水平桿搭設(shè)交圈。在封閉型腳手架的同一步中, 縱向水平桿應(yīng)四周交圈。4.6.橫向水平桿(小橫桿)4.6.1. 與主節(jié)點(diǎn)關(guān)系。主節(jié)點(diǎn)處必須設(shè)置一根橫向水平桿,用直角扣件固定在緊靠縱向水平桿上面的立桿上,且嚴(yán)禁拆除。4.6.2. 搭設(shè)位置。橫向水平桿兩端用直角扣件固定在縱向水平桿的上面。4.6.3. 靠墻一側(cè)外伸長(zhǎng)度。在雙排腳手架中,橫向水平桿靠墻一端的外伸長(zhǎng)度不應(yīng)大于立桿橫距的 0.4倍,且不大于500mm。橫向水平桿桿端搭設(shè)離裝飾面距離:宜≯ 100mm。4.6.4. 橫向水平桿在主節(jié)點(diǎn)處,桿端伸出扣件邊緣不應(yīng)小于 100mm.4.7. 連墻桿4.7.1. 距主節(jié)點(diǎn)距離央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第7頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案連墻桿宜靠近主節(jié)點(diǎn)設(shè)置,偏離主節(jié)點(diǎn)的距離不應(yīng)大于 300mm。4.7.2. 設(shè)置順序連墻桿應(yīng)從底層第一步縱向水平桿處開始設(shè)置。當(dāng)搭至有連墻件的構(gòu)造點(diǎn)時(shí),在搭設(shè)完該處的立桿、縱向水平桿、橫向水平桿后,應(yīng)立即設(shè)置連墻桿。如腳手架施工操作層高出二步時(shí), 應(yīng)采取臨時(shí)措施,直到上一層連墻桿搭設(shè)完后方可根據(jù)情況拆除。4.7.3. 連墻桿布置的最大間距應(yīng)符合下表的規(guī)定連墻桿布置最大距離腳手架高度豎向間距水平間距每根連墻桿覆蓋面積(m2)≤50m——————雙排架2(h)3(La)≤3.6×4.5(m2)>50m注:h—步距,La—縱距4.7.4. 連墻桿與墻的連接方法在剪力墻上或在框架柱上預(yù)埋φ63mm塑料管,連墻鋼管一端穿過(guò)預(yù)埋塑料管,緊靠墻的兩面設(shè)置扣件;連桿另一端與架體的縱向水平桿或立桿相連接。因本腳手架高度超過(guò)24M,故必須采用剛性連墻桿。嚴(yán)禁使用僅有拉筋的柔性連墻件。4.8. 腳手板4.8.1. 作業(yè)層的腳手板應(yīng)鋪滿、鋪穩(wěn),離開墻面≤ 150mm。4.8.2. 腳手板應(yīng)設(shè)置在三根橫向水平桿上。4.8.3. 腳手板接頭。 腳手板的鋪設(shè)可采用對(duì)接平鋪或搭接鋪設(shè)。對(duì)接鋪設(shè)時(shí),接頭處必須設(shè)置兩根橫向水平桿,兩桿間的距離≯ 300mm,腳手板外伸長(zhǎng)度 130~150mm;當(dāng)采用搭接鋪設(shè)時(shí),接頭必須支在橫向水平桿上,搭接長(zhǎng)度≥200mm,底部的板伸出橫向水平桿的長(zhǎng)度≥ 100mm。央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第8頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案4.8.4. 在拐角、斜道平臺(tái)口處的腳手板,應(yīng)與橫向水平桿可靠連接,防止滑動(dòng)。4.8.5. 腳手板垂直鋪設(shè)間距。 規(guī)范規(guī)定,自頂層作業(yè)層的腳手板向下每12m滿鋪一層腳手板。本工程要求從第一步架起,每隔6層(10.80m)滿鋪一層腳手板。4.8.6. 腳手板探頭應(yīng)用直徑 3.2mm的鍍鋅鐵絲固定在支承桿上。4.9. 剪刀撐4.9.1. 雙排腳手架應(yīng)設(shè)剪刀撐與橫向斜撐。4.9.2. 剪刀撐的設(shè)置應(yīng)符合下列規(guī)定:高度在24m以上雙排腳手架,應(yīng)在外側(cè)立面整個(gè)長(zhǎng)度和高度上連續(xù)設(shè)置剪刀撐。每道剪刀撐寬度不應(yīng)小于4跨,并不應(yīng)小于6m,斜桿與地面的傾角宜在45o~60o之間。每道剪刀撐跨越立桿的根數(shù)宜按下表規(guī)定:剪刀撐跨越立桿的最多根數(shù)剪刀撐斜桿與地面的傾角 45o 50o 60o剪刀撐跨越立桿的最多根數(shù) 7 6 5(3) 剪刀撐桿的接長(zhǎng)。 剪刀撐接長(zhǎng)宜采用搭接,搭接長(zhǎng)度≮1m,用3個(gè)扣件連接,桿端距扣件蓋板邊緣≮ 100mm。(4) 應(yīng)用旋轉(zhuǎn)扣件固定在與之相交的橫向水平桿的伸出端或立桿上 ,旋轉(zhuǎn)扣件中心線至主節(jié)點(diǎn)的距離不宜大于 150mm。剪刀撐從架體端部開始設(shè)置。央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第9頁(yè) 共24頁(yè)潮安迎賓館二期工程 腳手架施工方案剪刀撐、橫向斜撐搭設(shè):應(yīng)隨立桿、縱向和橫向水平桿同步搭設(shè),各底層斜桿下端均必須支承在墊板上。4.10. 橫向斜撐的設(shè)置4.10.1. 橫向斜撐應(yīng)在同一節(jié)間,由底至頂層呈之字型連續(xù)布置。4.10.2. 高度在24m以上的封閉型腳手架,除拐角應(yīng)設(shè)置橫向斜撐外,中間應(yīng)每隔 6跨設(shè)置一道。4.11. 門洞4.11.1.雙排腳手架門洞采用上升斜桿、平行弦桿桁架結(jié)構(gòu)型式。本工程采用挑空一根立桿,斜桿與地面的傾角α應(yīng)在45o~60o之間。門洞桁架的型式如下圖示:雙排腳手架門洞處的空間桁架,除下弦平面外,應(yīng)在其余5個(gè)平面內(nèi)的圖示節(jié)間設(shè)置一根斜腹桿,詳見下圖示。斜腹桿宜采用旋轉(zhuǎn)扣件固定在與之相交的橫向水平桿的伸出端上,旋轉(zhuǎn)扣件中心線至主節(jié)點(diǎn)的距離不宜大于 150mm。(3)斜腹桿應(yīng)采用通長(zhǎng)桿件。4.11.2. 門洞桁架下的兩側(cè)立桿應(yīng)為雙立桿,副立桿高度應(yīng)高于門洞1~2步。4.11.3. 門洞桁架中伸出的上下弦桿的桿件端頭, 均應(yīng)增設(shè)一個(gè)防滑扣件,該扣件應(yīng)緊靠主節(jié)點(diǎn)處的扣件。央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第10頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案門洞處上升斜桿、平行弦桿桁架圖4.12. 扣件安裝要求4.12.1. 扣件規(guī)格必須與鋼管外徑相匹配。4.12.2. 螺栓擰緊力矩不應(yīng)小于 40N·m,且不大于60N·m。4.12.3. 在主節(jié)點(diǎn)固定橫向水平桿、縱向水平桿、剪刀撐、橫向撐等用的直角扣件、旋轉(zhuǎn)扣件的中心點(diǎn)的相互距離不應(yīng)大于 150mm。4.12.4. 對(duì)接扣件開口應(yīng)朝上或朝內(nèi)。4.12.5 各桿件端頭伸出扣件蓋板邊緣的長(zhǎng)度不應(yīng)小于 100mm。4.13. 欄桿與擋腳板的搭設(shè)4.13.1. 欄桿與擋腳板均應(yīng)搭設(shè)在外立桿的內(nèi)側(cè)。4.13.2. 上欄桿上皮高度應(yīng)為 1.2m。4.13.3. 中欄桿應(yīng)居中設(shè)置。4.13.4. 擋腳板高度不應(yīng)小于 180mm。4.14. 安全網(wǎng)搭設(shè)央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第11頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案4.14.1. 網(wǎng)材的合格性。 新安全網(wǎng)必須有產(chǎn)品合格證書,舊網(wǎng)必須有允許使用的證明書或有合格的檢驗(yàn)記錄(現(xiàn)場(chǎng)承載力合格性試驗(yàn)) 。4.14.2.系結(jié)點(diǎn)。在每個(gè)系結(jié)點(diǎn)上,邊繩應(yīng)與支撐物(架)靠緊,并用一根獨(dú)立的繩系連接,系結(jié)點(diǎn)沿網(wǎng)邊均勻分布,其結(jié)點(diǎn)間的距離不大于750mm。系繩結(jié)點(diǎn)牢固又易解,受力后不會(huì)散脫為準(zhǔn)。不得用鐵絲代替系繩。4.14.3.網(wǎng)與網(wǎng)的連接。多張網(wǎng)連接使用時(shí),相鄰部分應(yīng)靠緊或重疊,連接系繩的材質(zhì)與網(wǎng)繩相同。4.14.4. 架體上水平網(wǎng)的垂直間距。 雙排腳手架內(nèi)水平兜網(wǎng)的垂直布置,與木腳手板每 3步間隔設(shè)置,并在水平網(wǎng)上鋪設(shè)密目網(wǎng)。4.14.5. 立網(wǎng)搭設(shè)。 立網(wǎng)隨腳手架及時(shí)搭設(shè),立網(wǎng)底部必須與腳手架全部封嚴(yán)。拆除5.1. 拆除腳手架前的準(zhǔn)備工作5.1.1. 應(yīng)全面檢查腳手架的扣件連接、 連墻桿、支撐體系等是否符合構(gòu)造要求。5.1.2. 應(yīng)根據(jù)檢查結(jié)果補(bǔ)充施工方案中拆除規(guī)定和措施, 經(jīng)批準(zhǔn)后方可實(shí)施。5.1.3. 應(yīng)清除腳手架子上的其它材料、雜物及地面障礙物。5.1.4. 拆除架體上的臨時(shí)用電線。5.2. 拆除腳手架時(shí)應(yīng)遵守下列規(guī)定5.2.1. 拆除一般順序。 拆除作業(yè)必須由上而下逐層進(jìn)行, 嚴(yán)禁上央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第12頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案下同時(shí)作業(yè)。5.2.2. 拆連墻桿。 連墻桿必須隨腳手架逐層拆除, 嚴(yán)禁先將連墻桿整層或數(shù)層拆除后再拆腳手架。5.2.3. 分段拆除法。 分段拆除高差不應(yīng)大于 2步。如高差大于 2步時(shí),應(yīng)增設(shè)連墻桿加固。5.2.4.拆下部最后一根立桿。當(dāng)腳手架拆至下部最后一根長(zhǎng)立桿的高度(約6.5M)時(shí),應(yīng)先在適當(dāng)位置搭設(shè)臨時(shí)拋撐加固后,再拆除連墻桿。5.2.5. 分立面拆除法。 當(dāng)腳手采取分立面拆除時(shí), 對(duì)不拆除的腳手架兩端,應(yīng)按規(guī)定設(shè)置連墻桿和橫向斜撐加固。5.2.6. 卸料。 卸料時(shí),各構(gòu)配件嚴(yán)禁拋擲至地面。檢查與驗(yàn)收對(duì)腳手架的檢查與驗(yàn)收應(yīng)嚴(yán)格遵照《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》(JGJ130-2001)的要求進(jìn)行。6.1構(gòu)配件檢查驗(yàn)收構(gòu)配件檢查與驗(yàn)收主要內(nèi)容鋼 管 扣新鋼管 舊鋼管 新扣件產(chǎn)品合格證、 銹蝕深度 生產(chǎn)許可質(zhì)檢報(bào)告、外 ≤0.5MM,變 證、質(zhì)量合格觀、管徑、壁厚。形彎曲狀況。 證、防銹。

件舊扣件腳手板外觀檢查,有裂寬≮200mm,縫、變形的嚴(yán)禁使厚不小于50mm,用,有滑絲的螺栓必腐朽的不得使須更換。用。6.2. 腳手架檢查驗(yàn)收央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第13頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案6.2.1. 搭設(shè)階段性檢查與驗(yàn)收腳手架階段性檢查與驗(yàn)收內(nèi)容階段初次中間驗(yàn)收頂層時(shí)間基礎(chǔ)完工后及每搭完10~每作業(yè)層遇有六級(jí)大風(fēng)、大雨達(dá)到設(shè)計(jì)高腳手搭設(shè)前13m高度后加荷前后,冬季開凍后度后6.2.2. 在使用中應(yīng)定期檢查的項(xiàng)目腳手架在使用中定期檢查的項(xiàng)目荷項(xiàng)目桿件底座扣件架體位移載桿件的設(shè)置和連底座是否扣件是否立桿的沉降是否內(nèi)容接,連墻桿、支撐、松動(dòng),立桿是短缺,螺絲與垂直度是否超載門洞桁架等是否符合否懸空,地基是否松動(dòng)超過(guò)規(guī)定構(gòu)造要求是否積水

安全措施安全防護(hù)措施是否符合要求6.2.3.搭設(shè)的規(guī)范允許偏差雙排腳手架主要搭設(shè)的允許偏差(mm)序號(hào)內(nèi)容項(xiàng)目技術(shù)要求允許偏差最后驗(yàn)收搭設(shè)高20-80m——±100H=2m±7H=10m±201立桿垂直度搭設(shè)中檢查偏差的高度H=20m——±40H=30m±60H=40m±80H=50m±100步距±202間距縱距——±50橫距±203橫向水平桿外伸長(zhǎng)度外伸500mm——-50主節(jié)點(diǎn)處各扣件中心相互距離a≤150mm同步立桿上兩個(gè)相隔對(duì)接扣件的高差≥500mm4扣件安裝立桿上的對(duì)接扣件至主節(jié)點(diǎn)的距離≤h/3——縱向水平桿上的對(duì)接扣件至主節(jié)點(diǎn)距離a≤L/3扣件螺栓擰緊扭矩40-60N·M5腳手板外伸長(zhǎng)度見規(guī)范(JGJ130-2001)表8.2.4第8項(xiàng)次——央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第14頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案安全管理7.1. 持證上崗。 腳手架搭設(shè)人員必須持證上崗,并定期體檢合格。7.2. 安全保護(hù)用品。 作業(yè)人員必須戴安全帽、系安全帶、穿防滑鞋。7.3. 架體合格后使用。 腳手架的構(gòu)配件質(zhì)量與搭設(shè)質(zhì)量, 應(yīng)檢查驗(yàn)收合格后方準(zhǔn)使用。7.4. 控制荷載。 作業(yè)層上的活荷載不得超過(guò) 2kN/m2。不得將模板支撐、纜風(fēng)繩、砼泵送管等固定在腳手架上;嚴(yán)禁懸掛起重設(shè)備。7.5. 當(dāng)有六級(jí)及六級(jí)以上大風(fēng)和霧、 雨、雪天氣時(shí)應(yīng)停止腳手架搭設(shè)與拆除作業(yè)。雨、雪后上架作業(yè)應(yīng)有防滑措施,并應(yīng)掃除積雪。7.6. 在腳手架使用期間,嚴(yán)禁拆除下列桿件:7.6.1. 主節(jié)點(diǎn)處的縱、橫向水平桿,縱、橫掃地桿。7.6.2. 連墻桿。7.7. 不得在腳手架基礎(chǔ)及其鄰近處進(jìn)行挖掘作業(yè),否則應(yīng)采取措施,并報(bào)安全部門批準(zhǔn)。7.8. 腳手架的北側(cè)為鋼筋加工區(qū)域,應(yīng)搭設(shè)雙層木板( 50mm/層)防護(hù)棚。7.9. 在腳手架上進(jìn)行電、氣焊作業(yè)時(shí),必須有防火措施和專人看守。7.10. 用電線路在架體上時(shí)應(yīng)有絕緣措施,不得亂拉亂拖。7.11. 腳手架接地、避雷措施等應(yīng)符合用電技術(shù)規(guī)范。7.12. 安全網(wǎng)應(yīng)按規(guī)定搭設(shè)和拆除。7.12.1. 使用前合格性檢驗(yàn)。 安全網(wǎng)搭設(shè)后,必須經(jīng)專職安全員央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第15頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案驗(yàn)收合格后方可使用。7.12.2. 使用期間的檢查。 對(duì)安全網(wǎng)使用期間進(jìn)行定期與不定期的檢查,主要查網(wǎng)繩是否有被解開、破損等現(xiàn)象。7.12.3. 清理。 安全網(wǎng)內(nèi)的雜物、垃圾等應(yīng)及時(shí)清理干凈。7.13. 搭拆腳手架時(shí),地面應(yīng)設(shè)圍欄和警戒標(biāo)志,并派專人看守,嚴(yán)禁非操作人員入內(nèi)。8.懸挑架計(jì)算懸挑架用來(lái)每四層卸荷一次,卸荷前架體高度應(yīng)是四個(gè)層高加二個(gè)步距,即架體計(jì)算高度為:2.8×4+1.8×2≈15(m),以一個(gè)縱距(1.5mm)為計(jì)算單元。8.1. 荷載計(jì)算8.1.1. 架體自重標(biāo)準(zhǔn)值每根鋼管承受結(jié)構(gòu)自重標(biāo)準(zhǔn)軸向力:NG1K=0.1248×15=1.87(kN)式中 0.1248(kN/m) —架體單位重,查規(guī)范附錄A,表A -1;15(m)—架體計(jì)算高度。每根鋼管承受木腳手板(二層)自重的標(biāo)準(zhǔn)軸向力:NG2K=0.35×2×1.5×1.3/2=0.68(kN)式中 0.35(K N)—木板重,查表 4.2.1-1;2—木板鋪設(shè)層數(shù);1.5(m)—縱距;央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第16頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案1.3(m)—腳手板鋪設(shè)寬度,1.3/2為每根立桿受荷寬度。欄桿、木擋腳板標(biāo)準(zhǔn)重NG2K=0.14×1.5×2=0.42(kN)式中 0.14(Kn) —欄桿、木擋腳板重,查表4 .2.1-2每根鋼管承受的架體自重合計(jì)軸力標(biāo)準(zhǔn)值:NGK=1.87+0.68+0.42=2.97(kN)8.1.2. 施工活載標(biāo)準(zhǔn)值本工程主體施工時(shí)僅作為人員的工作面,故選用裝修腳手架的施工均布荷載標(biāo)準(zhǔn)值 2.0(kN)。考慮兩個(gè)作業(yè)層的荷載,每計(jì)算單元的每根鋼管承受的活動(dòng)標(biāo)準(zhǔn)軸向力為:NQK=2.0×2×1.5×1.3/2=3.9(kN)式中 2.0kn/m 2—活載標(biāo)準(zhǔn)值2—受荷層數(shù)1.5×1.3/2—受荷面積8.1.3. 風(fēng)荷載水平風(fēng)荷載標(biāo)準(zhǔn)值為:K=0.7μZ?μS?wO=0.7×1.4×0.78×0.35=0.26(kN/m2)式中 μZ—風(fēng)壓高度變化系數(shù),取高度 55m,C類時(shí)為1.4;S—體型系數(shù),按表4.2.4中取1.3φ=1.3×0.6=0.78。其中考慮密目網(wǎng)的擋風(fēng)面積占50%,則φ=1.2An/AW1.2×0.5/1.0=0.6;W0—基本風(fēng)壓,取 0.35(kN/m2)。央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第17頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案8.2. 立桿穩(wěn)定性驗(yàn)算組合風(fēng)載時(shí):NMW8.201030.151069030120<f=205W0.1864895.081032(N/mm)(符合要求)式中 N—每根立根軸向力設(shè)計(jì)值=1.2NGK+0.85×1.4×NQK1.2×2.97+0.85×1.4×3.9=3.56+4.64=8.2(kN)φ—壓桿穩(wěn)定系數(shù)當(dāng)λ=L0/i=k μh/i=1.155 ×1.5×1800/15.8=197<[λ]=210 查表C得φ=0.186;A—鋼管截面積;M—由風(fēng)載設(shè)計(jì)值產(chǎn)生的立桿段彎矩:WM=0.85×1.42規(guī)范公式(5.3.4)шLah/10WK=0.85×1.4×0.26×1.5×1.82/10=0.15(kN·M);—鋼管截面模量。8.3. 懸挑架(卸荷三角架、承力三角架 )承載力計(jì)算8.3.1. 斜撐桿計(jì)算斜撐桿長(zhǎng)度央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第18頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案Ldc=1.422.823.13(m)Ldb=0.422.822.83(m)三角架計(jì)算簡(jiǎn)圖(2)斜撐桿所受的設(shè)計(jì)軸向力N=8200/0.895=9162(N)(Sinα=2.8/3.13=0.895)dcNdb=8200/0.989=8291(N)(Sinβ=2.8/2.83=0.989)(3)外斜撐所受的彎矩由于立桿與斜撐之間用扣件連接存在一定的偏心,取 e=53mm,側(cè)斜撐所受的彎矩近似為:MCd=8200×53=434.6×103(N·mm)穩(wěn)定系數(shù)φ桿件長(zhǎng)細(xì)比:λdc=μL/I=1.0×3130/15.8=198<[λ]=210斜撐與水平桿的連接是用扣件扣接,視為兩端鉸接,故取μ=1,查表得φ=0.184;外斜撐的穩(wěn)定性驗(yàn)算σNM9162434.6103=W0.1844895.08103=102+86=188<f=2052(N/mm)(符合要求)8.3.2. 內(nèi)斜撐的穩(wěn)定性核算略。連墻桿計(jì)算9.1. 連墻桿的軸向設(shè)計(jì)值NL=NLW+N0 規(guī)范公式(5.4.1)央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第19頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案5.9+5=10.9(kN)式中 N LW—風(fēng)載波產(chǎn)生的連墻桿軸向設(shè)計(jì)值(設(shè)高度為 55m)NLW=1.4шK·AW=1.4шK(2h×3La)1.4×0.26×(2×1.8×3×1.5)5.9(kN)N0—連墻桿約束腳手架平面外變形所產(chǎn)生的軸向力,當(dāng)雙排架時(shí)取5(kN)。9.2. 連墻桿的抗拉計(jì)算連墻桿采用φ48×3.5腳手鋼管,其抗拉應(yīng)力為:σ=NL/An=10900/489=22 <f=205(N/mm2) ( 符合要求)9.3. 每根連墻桿內(nèi)側(cè)所需的抗滑扣件只數(shù)n=NL/8000=10900/8000=1.35 (取2只扣件)式中 8000(N) —直角扣件、旋轉(zhuǎn)扣件(抗滑)承載力設(shè)計(jì)值。10.落地式雙排腳手架計(jì)算本工程腳手架實(shí)際搭設(shè)高度為: 0.30+51.60+1.5=53.40(m)10.1. 采用單立管時(shí)可搭設(shè)的高度 HS計(jì)算10.1.1. 當(dāng)不組合風(fēng)載時(shí)HS=〔φΑf-(1.2HG2K+1.4∑NQK)〕/1.2gK央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第20頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案=〔0.186×489×205-(1.2×1.1+1.4×3.9)103〕/1.2×0.1248×103=〔18.65×103-6.78×103〕/0.15×103=79(m)式中φ—穩(wěn)定系數(shù),同本方案第8.2條;NG2K—構(gòu)配件自重產(chǎn)生的標(biāo)準(zhǔn)軸向力為 :0.68+0.42=1.1 ;NQK——施工荷載產(chǎn)生的標(biāo)準(zhǔn)軸向力總和為39(kN),同本方案第8.1.2條;gK—按規(guī)范附錄A表A-1,取0.1248(Kn/m)10.1.2. 當(dāng)組合風(fēng)載時(shí)Af1.2NG2K0.851.4NQKMWKAWH=S1.2gK=18.651031.21.11030.851.43.910312.61030.1864895.081031.20.124810367(m)式中 MWK——風(fēng)載產(chǎn)生的標(biāo)準(zhǔn)彎矩值MWK=шKLah2/10=0.26×1.5×1.82/10=0.126(kN·m)10.2. 腳手架搭設(shè)高度限值按規(guī)定在上面計(jì)算高度兩式中取較小值 HS=67(m),搭設(shè)高度限值:H]=HS/(1+0.01HS)67/(1+0.01×67)=40(m)央邦建設(shè)集團(tuán)股份有限公司潮安迎賓館項(xiàng)目部 第21頁(yè)共24頁(yè)潮安迎賓館二期工程 腳手架施工方案10.3. 落地式腳手架立桿穩(wěn)定性計(jì)算本工程腳手實(shí)際搭設(shè)高度為 53.40m,計(jì)算搭設(shè)限高為 40m,為安全起見,單立管設(shè)計(jì)搭設(shè)高度為 30m(17個(gè)步高),從30m高度起每4層卸荷一次(懸挑架)。對(duì)30m高單管腳手架穩(wěn)定性計(jì)算如下:10.3.1. 靜荷載計(jì)算每根鋼管承受結(jié)構(gòu)自重標(biāo)準(zhǔn)軸向力:NG1K=0.1248×30=3.74(kN)每根鋼管承受木腳手板(5層)重的標(biāo)準(zhǔn)軸向力:NG2K=0.35×5×1.5×1.3/2=1.71(kN)受欄桿、木擋腳板(2個(gè)作業(yè)層)重的標(biāo)準(zhǔn)軸向力為NG2K=0.42kN(同本方案第8.1.1條)。每根鋼管承受靜荷載的合計(jì)標(biāo)準(zhǔn)軸向力:NGK=3.74+1.71+0.42=5.87(kN)10.3.2. 活荷載產(chǎn)生的軸向力每根立桿承受活荷載(2 層)標(biāo)準(zhǔn)軸向力為 NQK=3.90Kn(同本方案第8.1.2條)。10.3.3. 立桿穩(wěn)定性計(jì)算不組合風(fēng)載時(shí)N/φA=(1.2NGK+1.4NQK)/φA(1.2×5

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論