DB42-T 744-2011 CL建筑體系技術(shù)規(guī)程_第1頁(yè)
DB42-T 744-2011 CL建筑體系技術(shù)規(guī)程_第2頁(yè)
DB42-T 744-2011 CL建筑體系技術(shù)規(guī)程_第3頁(yè)
DB42-T 744-2011 CL建筑體系技術(shù)規(guī)程_第4頁(yè)
DB42-T 744-2011 CL建筑體系技術(shù)規(guī)程_第5頁(yè)
已閱讀5頁(yè),還剩71頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

ICS

P25

DB42湖 北 省 地 方 標(biāo) 準(zhǔn)DB42/T

備案號(hào)

J

CL

建筑體系技術(shù)規(guī)程

specification

for

CLbuilding

system 湖北省質(zhì)量技術(shù)監(jiān)督局湖北省住房和城鄉(xiāng)建設(shè)廳

744-2011

2.1

2.2

4.1

4.2

105.1

105.2

156.1

156.2

166.3

...................................................................................................... 176.4

......................................................................................................196.4.1

196.4.2

206.5

....................................................................................................216.6

............................................................................................................216.6.1

216.6.2

216.7

............................................................................................................226.7.1

226.7.2

226.8

236.8.1

236.8.2

236.8.3

236.9 23

39

.................................................................45

50

54 56 57

58

744-2011

CL

程執(zhí)行過程中如有意見或建議,請(qǐng)寄送湖北省建筑科學(xué)研究設(shè)計(jì)院(地址:武漢市武昌區(qū)中南路

16

號(hào),

744-2011CL

CL

本規(guī)程所指

CL

建筑體系是由自保溫

CL

墻體、裝配整體式或現(xiàn)澆樓(屋)蓋、現(xiàn)澆邊緣構(gòu)件及其

CL

建筑體系在框架結(jié)構(gòu)體系中

CL

墻體采用自承重

CL

復(fù)合墻體,在其它結(jié)構(gòu)體系中

CL

墻體采用CL

CL

CL

2.1

CL

CL

CL

CL

non-load

bearing

CL

wallCL

CL

CL

wallCL

CL

CL

CL

core

CL

of

wall

CL

(CL

1/2

CL

在一定的建筑物高度和層數(shù)范圍內(nèi),CL

復(fù)合剪力墻之間交接處或

CL

復(fù)合剪力墻與實(shí)體剪力墻交接處

CL

inner-column

CL

744-2011

CL

2.2

fff

f——CL

N——軸向力設(shè)計(jì)值;

A——CL

A——CL

B——CL

b——CL

l

Α——導(dǎo)熱系數(shù)的修正系數(shù);D

——CL

K

——CL

CL

建筑體系可使用普通混凝土或輕骨料混凝土。CL

復(fù)合剪力墻現(xiàn)澆部分墻體厚度不大于

100

CL

復(fù)合剪力墻混凝土強(qiáng)度等級(jí)不應(yīng)低于

C25,不宜高于

C50;自承重

CL

復(fù)合墻體混凝土強(qiáng)度等級(jí)

C20。

CL

CL

網(wǎng)架板鋼筋焊接網(wǎng)的材質(zhì)應(yīng)符合《鋼筋焊接網(wǎng)混凝土結(jié)構(gòu)技術(shù)規(guī)程》JGJ

114

343

CL

能應(yīng)符合《絕熱用模塑聚苯乙烯泡沫塑料》GB/T

10801.1

的規(guī)定;也可采用

型擠塑聚苯乙烯板,其物理性能應(yīng)符合《絕熱用擠塑聚苯乙烯泡沫塑料》GB/T

10801.2

CL

12

4.1

CL

建筑體系復(fù)合剪力墻結(jié)構(gòu)抗震等級(jí)應(yīng)按表

確定,其它結(jié)構(gòu)類型按《建筑抗震設(shè)計(jì)規(guī)范》房屋高度(m)≤80≤24≤24

744-2011GB

CL

CL

度及

CL

CL

CL

復(fù)合剪力墻主要用于建筑物的外墻、不采暖樓梯間墻、電梯間墻、分戶墻等有保溫隔熱、隔聲

CL

復(fù)合剪力墻進(jìn)行穩(wěn)定性計(jì)算時(shí),可取墻體兩側(cè)混凝土厚度之和;進(jìn)行承載力計(jì)算時(shí),墻體厚度

CL

12

CL

4.5

CL

CL

80

mm。

CL

CL

12

形、十字形小墻肢

CL

CL

復(fù)合剪力墻采用

法進(jìn)行承載力計(jì)算時(shí),配筋率應(yīng)按兩側(cè)鋼筋截面總面積與兩側(cè)混凝土截面總

CL

l≤1.5B

l≤15

744-2011

180

CL

復(fù)合剪力墻屬于鋼筋混凝土剪力墻,在內(nèi)力分析和截面設(shè)計(jì)時(shí),計(jì)算模型及假定除滿足本規(guī)程

CL

規(guī)范》GB

的相關(guān)要求。自承重

CL

復(fù)合墻體作為圍護(hù)墻和隔墻時(shí),應(yīng)估計(jì)其設(shè)置對(duì)結(jié)構(gòu)抗震的不利

CL

4.2

建筑設(shè)計(jì)應(yīng)符合抗震概念設(shè)計(jì)要求。建筑的平面和立面設(shè)計(jì)宜規(guī)則,不應(yīng)采用嚴(yán)重不規(guī)則的設(shè)計(jì)

GB

CL

36m

CL

程》JGJ3

36m

CL

不滿足上述要求時(shí)應(yīng)計(jì)算墻體穩(wěn)定。可按《高層建筑混凝土結(jié)構(gòu)技術(shù)規(guī)程》JGJ

附錄執(zhí)行。墻體厚

CL

1/30

24m

CL

h≤24mh≤24m其他部位CL

CL

N—重力荷載代表值作用下

CL

—CL

1.51.51.8

1.0

6度7度承重窗間墻最小寬度(m)

744-2011

橫墻:連通內(nèi)外縱墻的橫墻間距不應(yīng)大于

個(gè)開間且不應(yīng)大于

12m,其縱橫墻之間連接構(gòu)造應(yīng)

CL

2)

縱墻:當(dāng)房屋寬度大于

9m

時(shí),除兩道外縱墻外,中部尚應(yīng)布置一定數(shù)量的內(nèi)縱墻,其截面面

CL

4.2.5-1

4.2.5-1

CL

4.2.5-2

4.2.5-1

CL

4.2.5-2

4.2.5-2

0.3

0.5

梁的計(jì)算配筋,且不應(yīng)小于

4φ14;箍筋面積不應(yīng)小于φ6@100。連梁上下之

墻體,應(yīng)與連梁及兩側(cè)墻

4.2.8

CL

復(fù)合剪力墻兩端和洞口兩側(cè)應(yīng)按表

4.2.6-1

設(shè)置豎向邊緣構(gòu)件,并應(yīng)符合本規(guī)程第

條相

4.2.6-1

4.2.6-1

4.2.6-2

CL

且≥3002bb且≥300lbb2bbbb且≥3002bb且≥300lbb2bbbb且≥300b

建筑物高度不大于

36m

時(shí),若外墻墻肢長(zhǎng)度不超過

1.8m,二、三級(jí)抗震等級(jí)洞邊構(gòu)造邊緣構(gòu)件截面高度可適當(dāng)減小,但不應(yīng)小于

200mm。其縱筋二級(jí)抗震等級(jí)不應(yīng)小于

4φ16;三、四級(jí)抗震等級(jí)及非抗震設(shè)防房屋高度大于

24m

時(shí)不應(yīng)小于

4φ14。三、四級(jí)抗震等級(jí)及非抗震設(shè)防房屋高度不大于

24m

時(shí)可按

l

4.2.8-1

λ

λ

λ=λ/2λ

λ=λ/2

λ=λ/2l

bl

bl

CL

CL

b

744-2011b

4φ14

。當(dāng)位于洞口兩側(cè)時(shí),加強(qiáng)邊框內(nèi)側(cè)應(yīng)設(shè)水平和豎向鋼筋

1φ12,分別錨入樓層梁及柱內(nèi),外側(cè)

12m

CL

CL

CL

CL

CL

可沿梁軸線方向設(shè)置與梁相連的

復(fù)合剪力墻或普通剪力墻、扶壁柱或在墻內(nèi)設(shè)置暗柱,除滿足下列要

的相關(guān)規(guī)定:

筋率不宜小于

0.7%,箍筋直徑不應(yīng)小于φ6,間距不應(yīng)大于

。外側(cè)混凝土墻板應(yīng)設(shè)拉筋與扶壁柱錨

744-2011

CL

CL

采用

法進(jìn)行承載力計(jì)算以及墻體兩端和洞口兩側(cè)設(shè)置

墻框柱及加強(qiáng)邊框的

復(fù)合剪力墻,在

0.4

80中的較大值;二、三級(jí)抗震等級(jí)及房屋高度大于

24m

的非抗震設(shè)防時(shí),不應(yīng)小于

4φ12

4.2.10

CL

連梁計(jì)算高度可按下列兩種方式考慮。一般宜按下列第一種計(jì)算,當(dāng)截面不滿足計(jì)算要求時(shí),應(yīng)

)、()。

)、()。

當(dāng)按第一種連梁高度計(jì)算時(shí),連梁的縱筋及箍筋均應(yīng)滿足計(jì)算配筋要求,此時(shí)窗臺(tái)下墻體與邊緣

744-2011對(duì)樓層梁頂部鋼筋可按構(gòu)造要求設(shè)置,對(duì)一、二、三級(jí)抗震等級(jí)房屋高度大于

24

2φ14,其

4.2.11 CL

,非抗震設(shè)計(jì)時(shí)不應(yīng)小于

600

φ6

150

150

200

2.5

0.3%4.3

CL

墻體的節(jié)能設(shè)計(jì)除應(yīng)符合本規(guī)程相關(guān)規(guī)定外,尚應(yīng)符合《民用建筑熱工設(shè)計(jì)規(guī)范》GB

50176、

CL

建筑體系住宅的外墻、不采暖樓梯間墻、陽(yáng)臺(tái)欄板應(yīng)采用

CL

墻體,電梯間墻、分戶墻宜采用CL

墻體。CL

墻體的平均傳熱系數(shù)不應(yīng)超過標(biāo)準(zhǔn)規(guī)定的限值。當(dāng)不能滿足該限值時(shí),應(yīng)對(duì)熱橋部位或傳熱

外墻

CL

1-

CL

CRB550

HRB400

二a二b253035202530152025

數(shù)量(個(gè)/m

50

1.231.451.181.33

1.321.561.271.43

744-2011

CL

墻體熱工設(shè)計(jì)時(shí)考慮斜插鋼筋及保溫板壓縮的影響,保溫板導(dǎo)熱系數(shù)及蓄熱系數(shù)應(yīng)乘以修正系

設(shè)計(jì)使用年限為

50

年的

CL

復(fù)合剪力墻鋼筋焊接網(wǎng)最外層鋼筋的保護(hù)層最小厚度應(yīng)滿足表

CL

20

CL

CL

CL

鋼筋且較近一根橫向鋼筋至計(jì)算截面的距離大于

50mm

時(shí),錨固長(zhǎng)度應(yīng)按圖

采用;當(dāng)錨固長(zhǎng)度內(nèi)無

50mm

la

CL

la(mm)10

3d

200mm;錨固區(qū)內(nèi)無橫向鋼筋時(shí)焊接網(wǎng)鋼筋的錨

744-2011

50

l

1.15

ll

1.05

l l

CL

兩片焊接網(wǎng)末端之間鋼筋搭接接頭的最小搭接長(zhǎng)度不應(yīng)小于本規(guī)程第

條規(guī)定的最小錨固長(zhǎng)

la

1.3

當(dāng)搭接區(qū)內(nèi)兩張網(wǎng)片中有一片無橫向鋼筋或采用附加鋼筋搭接時(shí),最小搭接長(zhǎng)度應(yīng)按本規(guī)程第

la

1.3

l

1.3

l

CL

GB

CL

CL

結(jié)構(gòu)伸縮縫最大間距可參照《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》GB

5.2

CL

1)

穿過保溫板的部分除應(yīng)進(jìn)行鍍鋅處理外尚應(yīng)進(jìn)行二次防腐處理,二次防腐層厚度不應(yīng)小于

1/60

744-2011

12

744-2011

CL

36m

36m

50

40

100≤c120

140≤c≤160

160鋼筋焊接網(wǎng)①

鋼筋焊接網(wǎng)③

φ6@100

φ6/8@100/150/200

100

50

100

50

/m

100

100

/m

100

13

744-2011

CL

當(dāng)墻體端部設(shè)有邊緣構(gòu)件時(shí),墻體水平鋼筋可直接錨入邊緣構(gòu)件,見圖

設(shè)附加帶肋鋼筋或附加搭接網(wǎng)片與邊緣構(gòu)件連接,見圖

CL

20d

80mm

CL

在樓、屋面及地梁處,內(nèi)外側(cè)一般均應(yīng)采用預(yù)留附加鋼筋插筋方式,見圖

5.2.3。附加鋼筋應(yīng)滿足等強(qiáng)度要求,間距不應(yīng)大于

倍的網(wǎng)格間距。附加鋼筋與

CL

網(wǎng)架板鋼筋焊網(wǎng)的搭接及與暗梁、連梁的錨固

14

744-2011

CL

CL

6.1

CL

施工單位應(yīng)編制承包項(xiàng)目的施工組織設(shè)計(jì),包括編制詳盡的

CL

建筑體系工程專項(xiàng)施工技術(shù)方案,并經(jīng)監(jiān)理單位審查批準(zhǔn)。施工技術(shù)方案應(yīng)包括

CL

墻體工程各相關(guān)分項(xiàng)工程的施工方案、質(zhì)量、安全控制措

CL

墻體工程為主體結(jié)構(gòu)分部的子分部工程,CL

墻體子分部工程可劃分為

CL

網(wǎng)架板驗(yàn)收、CL

網(wǎng)架

CL

墻體的施工可采取一側(cè)(較?。╊A(yù)制一側(cè)現(xiàn)澆、兩側(cè)同時(shí)現(xiàn)澆、兩側(cè)同時(shí)噴射混凝土等施工工15

CL

CL

000

個(gè)月。同類型的

CL

1.5

CL

CL

建筑體系工程的施工驗(yàn)收過程中,CL

墻體子分部工程中的普通鋼筋工程、CL

墻體模板工程及現(xiàn)澆混凝土工程可根據(jù)施工方法并入主體結(jié)構(gòu)分部工程的現(xiàn)澆鋼筋混凝土結(jié)構(gòu)子分部工程或裝配式鋼6.2

CL

CL

網(wǎng)架板裝卸及后期應(yīng)用時(shí)嚴(yán)禁丟擲、摔震?,F(xiàn)場(chǎng)存放應(yīng)做好防護(hù)架,按使用順序斜立式存放,

CL

CL

CL

CL

CL

檢驗(yàn)方法:CL

網(wǎng)架板的力學(xué)性能復(fù)試應(yīng)包括網(wǎng)片焊點(diǎn)拉伸試驗(yàn)和網(wǎng)片與腹絲的焊點(diǎn)抗剪試驗(yàn)。每檢16≤25±20±10

±10

±10

744-2011驗(yàn)批

CL

18

F≥0.3Af

A

);f

360

0.1

CL

6.2.2-1

6.2.2-1

CL

6.2.2-1

CL

6.2.2-2CL

6.3

CL

17

744-2011

CL

CL

CL

CL

CL

CL

CL

墻體預(yù)制部分混凝土應(yīng)滿足以下質(zhì)量驗(yàn)收標(biāo)準(zhǔn),其余現(xiàn)澆部分混凝土應(yīng)滿足本規(guī)程

CL

網(wǎng)架板預(yù)制部分混凝土應(yīng)按國(guó)家現(xiàn)行標(biāo)準(zhǔn)《普通混凝土配合比設(shè)計(jì)規(guī)程》JGJ

55

混凝土工作性能符合施工技術(shù)方案要求?,F(xiàn)場(chǎng)攪拌時(shí),其原材料每盤稱量偏差應(yīng)符合表

6.3.2-1

6.3.2-1

混凝土的強(qiáng)度等級(jí)必須符合設(shè)計(jì)要求。用于檢查混凝土強(qiáng)度的試件應(yīng)在混凝土的澆筑地點(diǎn)隨機(jī)抽

除上述規(guī)定外,一側(cè)預(yù)制混凝土施工工藝尚應(yīng)按《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB

181010

101010

+5,0

±10

744-2011

CL

網(wǎng)架板的預(yù)制部分混凝土施工前應(yīng)按設(shè)計(jì)圖紙及施工技術(shù)方案對(duì)其支墊方式、模具、預(yù)埋件及

CL

復(fù)合剪力墻的預(yù)埋鐵件的形狀、尺寸、材質(zhì)、焊接質(zhì)量均應(yīng)滿足設(shè)計(jì)要求,埋件尺寸允許偏差

6.3.2-2

6.3.2-2

CL

6.3.2-2

CL

CL

預(yù)制板制作完成脫模后,應(yīng)對(duì)照設(shè)計(jì)圖紙對(duì)其幾何尺寸和外觀質(zhì)量進(jìn)行檢查。混凝土外觀質(zhì)量CL

6.3.2-3

6.3.2-3 CL

6.3.2-3 CL

6.4

CL

網(wǎng)架板(CL

CL

CL

190,-100,-10

10

10

N/mm

CL

按照施工技術(shù)方案實(shí)施

CL

網(wǎng)架板(CL

預(yù)制墻板)的吊運(yùn)、安裝和臨時(shí)固定。CL

預(yù)制墻板起吊時(shí)應(yīng)視情況采取附加剛性支架等加強(qiáng)措施,防止

CL

預(yù)制墻板吊點(diǎn)的局部受壓破壞及陰角部位開裂。起吊時(shí)繩索與構(gòu)件水平面夾角不宜小于

45°。應(yīng)有可靠的安全措施,保證

CL

預(yù)制墻板吊運(yùn)、安裝的安全。安裝

在基礎(chǔ)或樓面上安裝

CL

CL

網(wǎng)架板(CL

預(yù)制板)安裝的軸線位置與垂直度允許偏差應(yīng)符合表6.4.2-1

6.4.2-1

CL

6.4.2-1

CL

CL

20

CL

CL

網(wǎng)架板(CL

6.4.2-2

6.4.2-2

CL

10+10,0

744-2011

6.4.2-2(續(xù))6.5

CL

6.4.2-2(續(xù))6.5

CL

6.6

CL

CL

CL

CL

CL

CL

CL

復(fù)合剪力墻現(xiàn)澆混凝土工程的質(zhì)量驗(yàn)收除應(yīng)按國(guó)家標(biāo)準(zhǔn)《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB

現(xiàn)澆結(jié)構(gòu)不應(yīng)有影響結(jié)構(gòu)性能和使用功能的尺寸偏差?;炷猎O(shè)備基礎(chǔ)不應(yīng)有影響結(jié)構(gòu)性能和設(shè)

CL

21H/1000

且≤30±30CL

101510

744-2011

CL

CL

50

50

6.7

CL

CL

CL

CL

22

744-2011

mm

mm。

6.8

CL

CL

CL

10

CL

CL

經(jīng)有資質(zhì)的檢測(cè)單位檢測(cè)鑒定達(dá)不到設(shè)計(jì)要求,但經(jīng)原設(shè)計(jì)單位核算并確認(rèn)仍可滿足結(jié)構(gòu)安全和

經(jīng)返修或加固處理能夠滿足結(jié)構(gòu)安全使用要求的分項(xiàng)工程,可根據(jù)技術(shù)處理方案和協(xié)商文件進(jìn)行6.9

CL

網(wǎng)架板隨進(jìn)場(chǎng)隨安裝,現(xiàn)場(chǎng)存放數(shù)量不得超過一層的用量?,F(xiàn)場(chǎng)存放地應(yīng)設(shè)置防火警示標(biāo)志,

CL

CL

CL

CL

CL

CL

施工現(xiàn)場(chǎng)消防安全除執(zhí)行本規(guī)程外,尚應(yīng)符合國(guó)家標(biāo)準(zhǔn)《建設(shè)工程施工現(xiàn)場(chǎng)消防安全技術(shù)規(guī)范》23

744-2011GB50720-2011

24

EPSXPSEPSXPS3050501.2461.0361.2521.3491.2031.0061.7461.8431.1550.9732.3392.4364050500.9990.8211.3401.4690.9710.8021.8341.9630.9400.7812.4272.5565050500.8340.6801.4281.5890.8150.6671.9222.0830.7920.6522.5152.6766050500.7160.5811.5151.7090.7010.5712.0102.2030.6850.5602.6032.7967050500.6270.5061.6031.8290.6160.4992.0972.3230.6030.4912.6902.9168050500.5570.4491.6911.9490.5490.4432.1852.4430.5380.4372.7783.0369050500.5020.4031.7792.0690.4950.3992.2732.5630.4870.3932.8663.15650500.4570.3661.8672.1890.4510.3622.3612.6830.4440.3582.9543.276

744-2011

CL

A.0.1

A.0.1-1

CL

3,100

EPSXPSEPSXPS3050501.4041.1791.2521.3491.3501.1401.7461.8431.2901.0972.3392.4364050501.1360.9411.3401.4691.1000.9171.8341.9631.0600.8892.4272.5565050500.9540.7841.4281.5890.9280.7671.9222.0830.8990.7472.5152.6766050500.8220.6711.5151.7090.8030.6592.0102.2030.7810.6442.6032.7967050500.7220.5871.6031.8290.7070.5772.0972.3230.6910.5662.6902.9168050500.6440.5221.6911.9490.6320.5142.1852.4430.6190.5052.7783.0369050500.5810.4691.7792.0690.5710.4632.2732.5630.5600.4562.8663.15650500.5290.4271.8672.1890.5210.4212.3612.6830.5120.4152.9543.276

744-2011

A.0.1-2

CL

26

EPSXPSEPSXPS3050501.2081.0051.2521.3491.1680.9771.7461.8431.1230.9452.3392.4364050500.9670.7951.3401.4690.9410.7781.8341.9630.7572.4272.5565050500.8060.6581.4281.5890.7880.6461.9222.0830.7670.6322.5152.6766050500.6910.5611.5151.7090.6770.5522.0102.2030.6620.5422.6032.7967050500.6040.4891.6031.8290.5940.4822.0972.3230.5820.4742.6902.9168050500.5370.4331.6911.9490.5290.4282.1852.4430.5200.4222.7783.0369050500.4840.3891.7792.0690.4770.3852.2732.5630.4690.3802.8663.15650500.4400.3531.8672.1890.4340.3502.3612.6830.4280.3452.9543.276

744-2011

A.0.1-3

CL

個(gè)/m

EPSXPSEPSXPS3050501.3201.1031.2521.3491.2721.0691.7461.8431.2181.0312.3392.4364050501.0630.8771.3401.4691.0310.8561.8341.9630.9960.8312.4272.5565050500.8890.7281.4281.5890.8670.7131.9222.0830.8420.6962.5152.6766050500.7650.6231.5151.7090.7480.6122.0102.2030.7290.5992.6032.7967050500.6710.5441.6031.8290.6580.5352.0972.3230.6430.5262.6902.9168050500.5970.4831.6911.9490.5870.4762.1852.4430.5750.4682.7783.0369050500.5380.4341.7792.0690.5300.4282.2732.5630.5210.4222.8663.15650500.4900.3941.8672.1890.4830.3902.3612.6830.4750.3842.9543.276

744-2011

A.0.1-4

CL

28

744-2011

CL

B.0.1-1

CL

@

@

@

@29

744-2011

eq

\o\ac(○,A)

eq

\o\ac(○,12)

@30

744-2011

eq

\o\ac(○,13)

eq

\o\ac(○,14)

eq

\o\ac(○,15)

eq

\o\ac(○,16)

eq

\o\ac(○,17)

eq

\o\ac(○,18)

31

744-2011

19

eq

\o\ac(○,B)

eq

\o\ac(○,20)

eq

\o\ac(○,21)

32

744-2011

B.0.1-2

CL

eq

\o\ac(○,22)

eq

\o\ac(○,23)

eq

\o\ac(○,24)

eq

\o\ac(○,25)

eq

\o\ac(○,26)

eq

\o\ac(○,27)

@33

744-2011

eq

\o\ac(○,28)

eq

\o\ac(○,29)

eq

\o\ac(○,30)

eq

\o\ac(○,31)

@eq

\o\ac(○,32)

eq

\o\ac(○,33)

34

744-2011

eq

\o\ac(○,34)

eq

\o\ac(○,35)

@eq

\o\ac(○,36)

eq

\o\ac(○,37)

eq

\o\ac(○,38)

eq

\o\ac(○,39)

@@3540

744-2011

744-2011

B.0.1-3CL

eq

\o\ac(○,41)

eq

\o\ac(○,42)

eq

\o\ac(○,43)

eq

\o\ac(○,44)

eq

\o\ac(○,45)

37

744-2011

B.0.1-4

CL

eq

\o\ac(○,46)

eq

\o\ac(○,47)

B.0.1-5

CL

eq

\o\ac(○,48)

38

744-2011

CL

CL

CL

網(wǎng)架板(CL

CL

39

6.2.26.2.26.2.26.2.26.2.26.2.2101025±20±10±10

±10

744-2011

CL

6.3.26.3.26.3.26.3.26.3.26.3.26.3.26.3.28.3.2.81010+6,010

744-2011

CL

744-2011

6.4.26.4.2

6.4.26.4.26.4.210101010

744-2011

CL

6.6.26.6.2

6.6.2H/1000

≤3010±3010151010

744-2011

CL

744-2011

CL

D.1

D.2

適用于所有

CL

建筑體系中

CL

復(fù)合混凝土剪力墻現(xiàn)場(chǎng)整體現(xiàn)澆工程的施工和采用

CL

建筑體系保溫技D.3

CL

在側(cè)壓力作用下保溫板會(huì)產(chǎn)生側(cè)向位移。通過在

CL

網(wǎng)架板兩側(cè)按一定間距澆筑混凝土墊塊,并控制兩側(cè)

CL

D.4

CL

網(wǎng)架板備料、進(jìn)場(chǎng)→混凝土墊塊的制作→邊緣構(gòu)件(暗柱)鋼筋綁扎→CL

網(wǎng)架板安裝就位→CL

D.5

必須熟悉

CL

建筑體系特點(diǎn)及施工工藝和相關(guān)標(biāo)準(zhǔn)。熟悉施工圖紙,組織施工圖紙的自審、會(huì)審和現(xiàn)場(chǎng)簽證。準(zhǔn)備自密實(shí)混凝土的試配工作。首次參與

CL

建筑體系工程施工的主要技術(shù)人員要經(jīng)過相關(guān)技術(shù)

CL

CL

CL

設(shè)在施工現(xiàn)場(chǎng),且在吊裝設(shè)備工作范圍之內(nèi)。場(chǎng)地的面積根據(jù)

CL

網(wǎng)架板的數(shù)量、施工進(jìn)度及現(xiàn)場(chǎng)實(shí)際情

CL

CL

CL

網(wǎng)架板為非標(biāo)準(zhǔn)塊,需要根據(jù)施工圖中

CL

復(fù)合剪力墻的布置情況,依據(jù)施工圖中的節(jié)點(diǎn)詳圖和相關(guān)技術(shù)規(guī)程結(jié)合施工縫留設(shè)情況對(duì)

CL

CL

CL

CL

網(wǎng)架板應(yīng)根據(jù)使用進(jìn)度提前進(jìn)場(chǎng)。裝卸時(shí)嚴(yán)禁摔震、踩踏。CL

網(wǎng)架板應(yīng)按照使用順序存放在干燥

45

744-2011

采用

PVC

CL

mm

50

mm~60

mm

80

mm

40

mm~50

mm

60

70

mm

1)。

500

800

mm

CL

網(wǎng)架板,可以只制作一列墊塊;網(wǎng)架板兩側(cè)的墊塊中心宜相互對(duì)正,誤差不應(yīng)大于

50

mm(見圖

CL

復(fù)合剪力墻

CL

CL

CL

46

744-2011

CL

CL

CL

CL

復(fù)合剪力墻上部較厚一側(cè)一排墊塊下穿φ50

鋼管或方木作為扁擔(dān),

CL

2—

CL

CL

根據(jù)引測(cè)到施工平面的水平和垂直控制線,用墨線放出

CL

復(fù)合剪力墻及內(nèi)隔墻的軸線和邊線及門窗起吊應(yīng)垂直、平穩(wěn),繩索與墻板水平夾角不宜小于

45

°。各吊點(diǎn)要受力均勻。如果墻板因開洞口太

CL

CL

CL

建筑體系與普通剪力墻結(jié)構(gòu)最大的區(qū)別就是

CL

復(fù)合剪力墻要使用自密實(shí)混凝土進(jìn)行混凝土的澆筑。因

在門窗洞口的木框上用木螺絲固定增設(shè)鋼板護(hù)角,采取加厚木板邊框和增加對(duì)角支撐,以保證木47

744-2011

CL

秒):塌落度:260

mm~280

mm;擴(kuò)展度:600

mm~750

mm;

42.5

宜采用粒徑為

mm~10

mm,連續(xù)級(jí)配的卵石或碎石,并符合《普通混凝土用卵石或碎石質(zhì)量標(biāo)準(zhǔn)及

53—79

標(biāo)準(zhǔn)及檢驗(yàn)方法》JGJ

CL

復(fù)合剪力墻中的自密實(shí)混凝土宜按圖

400

mm

2—

48CL

復(fù)合剪力墻在澆筑前的

CL

CL

復(fù)合剪力墻在澆筑前的

CL

網(wǎng)架板重量較輕,一般不高于

20

kg/m

,因此可采用普通塔吊進(jìn)行吊裝

CL

CL

復(fù)合剪力墻中的混凝土截面較薄,通常室外側(cè)只有

50mm。為了防止產(chǎn)生干縮裂縫,應(yīng)在模板拆除

24h

D.6

CL

CL

D.7

D.8

CL

D.9

CL

CL

復(fù)合剪力墻中

CL

網(wǎng)架板為工廠化定制生產(chǎn),施工現(xiàn)場(chǎng)無需二次加工,不產(chǎn)生建筑垃圾;用于其澆D.10 CL

混凝土澆筑質(zhì)量按照《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB50204

49

744-2011

CL

E.1

E.2

CL

CL

E.3

控制混凝土性能:通過控制混凝土原材料性能、水灰比、外加劑摻量、投料順序、攪拌時(shí)間等,

控制施工方法:通過控制混凝土噴射的順序、角度、距離、時(shí)間等達(dá)到混凝土粘接牢固、回彈量E.4

混凝土試配、設(shè)備調(diào)試等前期準(zhǔn)備工作→CL

網(wǎng)架板的檢驗(yàn)與安裝→CL

網(wǎng)架板的臨時(shí)固定→CL

網(wǎng)架板E.5

熟悉

CL

CL

2)

施工圖紙要求進(jìn)行基礎(chǔ)及基礎(chǔ)圈梁的施工,并在基礎(chǔ)圈梁施工時(shí)按要求預(yù)留與

CL

網(wǎng)架板豎向

2)

骨料:應(yīng)采用堅(jiān)硬耐久性好的卵石或碎石,粒徑不應(yīng)大于

12

㎜,且其中

5mm

篩余量不得大于

50mm

8mm。

50

744-20111)

采用專用混凝土噴射機(jī);配套空氣壓縮機(jī)單機(jī)供風(fēng)量不宜小于

3m/min,用于三層以下混凝土

2.4m

CL

CL

CL

網(wǎng)架板為非標(biāo)準(zhǔn)塊,需要根據(jù)施工圖中

CL

復(fù)合剪力墻的布置情況,依據(jù)施工圖中的節(jié)點(diǎn)詳圖和相關(guān)技術(shù)規(guī)程結(jié)合施工縫留設(shè)情況對(duì)

CL

CL

CL

CL

網(wǎng)架板應(yīng)根據(jù)使用進(jìn)度提前進(jìn)場(chǎng)。裝卸時(shí)嚴(yán)禁摔震、踩踏。CL

網(wǎng)架板應(yīng)按照使用順序存放在干燥

CL

CL

CL

CL

CL

可以采用設(shè)備吊裝,人工輔助就位。安裝就位后,應(yīng)及時(shí)按照設(shè)計(jì)要求采用綁扎鋼筋焊網(wǎng)對(duì)

CL

網(wǎng)架板進(jìn)

CL

為了保證混凝土層的厚度及墻體垂直度,應(yīng)在

CL

網(wǎng)架板安裝就位后在混凝土較薄一側(cè)安裝控制件??刂萍刹捎梅叫武摴茇Q向綁扎在

CL

網(wǎng)架板鋼筋焊網(wǎng)的外側(cè),起到?jīng)_筋的作用。方管的綁扎必須在焊點(diǎn)處,且不得產(chǎn)生水平方向及墻面外的位移,間距在

2m

左右。較厚側(cè)可采用固定短鋼筋等方式設(shè)置噴射厚

CL

沖筋完畢后,應(yīng)根據(jù)控制件對(duì)

CL

網(wǎng)架板進(jìn)行垂直校正,并采用鋼管腳手架對(duì)其進(jìn)行臨時(shí)固定。臨時(shí)

CL

51

15

/m

/m

2m

/h~4m

/h

80

㎜~120

120

1.5

m~2.0

40

基本相同,噴射時(shí),噴槍水平移動(dòng),與墻面夾角在

25

°左右,往返兩次完成。第二次噴射時(shí),噴槍與墻

構(gòu)造柱的澆筑:構(gòu)造柱任一截面尺寸大于

200

㎜時(shí),應(yīng)采用在墻體混凝土噴射前對(duì)構(gòu)造柱分

12h

混凝土終凝

2h

后立即采取養(yǎng)護(hù)措施,養(yǎng)護(hù)時(shí)間不應(yīng)少于

14d。當(dāng)氣溫低于

時(shí),不宜噴水養(yǎng)護(hù),

1.0

E.6

CL

噴射混凝土加固技術(shù)規(guī)范》CECS161

CL

CL

E.7

52253.8

744-2011E.8

CL

E.9

單位:㎏/m

單位:㎏/m

85%53

744-2011

80

7d

的立方體試塊。立方體試塊的允許偏差:邊長(zhǎng)不大于,直角不大于

。采取取芯法時(shí),用芯機(jī)鉆取

28d

每組

個(gè)試塊應(yīng)在由同一批混凝土噴射的同一塊板件上制取,對(duì)有明顯缺陷的試塊應(yīng)予舍棄。每

15%

個(gè)試塊抗壓強(qiáng)度的最大值和最小值與中間值之差均超過中間值的

15%

該組試塊不應(yīng)該

?S?f

0.1);),

);

,

0.1);,

0.1);5415~19≥201.151.050.950.900.85

744-2011

10

10

,≥0.95,

,,≥0.85,

當(dāng)對(duì)噴射混凝土試塊強(qiáng)度的代表性有懷疑時(shí),可采用直接從噴射混凝土構(gòu)件上鉆取芯樣的方法,55

744-2011

條文中指定應(yīng)按其它有關(guān)標(biāo)準(zhǔn)、規(guī)范的規(guī)定執(zhí)行時(shí)的寫法為應(yīng)按執(zhí)行56

744-2011

10

12

10801.113

10801.214

15

16

34317

18

1219

1820

5221

5522

23

13424

14425

16126

57

744-2011CL

建筑體系技術(shù)規(guī)程DB42/T

58

744-2011

1.0.1~1.0.5

CL

建筑體系的核心構(gòu)件——CL

墻體是一種鋼筋焊接網(wǎng)架復(fù)合混凝土墻,它的應(yīng)用范圍主

CL

復(fù)合剪力墻和用于框架結(jié)構(gòu)的自承重

CL

CL

2000

年,西安建筑科技大學(xué)《14

榀復(fù)合墻體試驗(yàn)研究報(bào)告》和《中國(guó)

CL

體系七層樓房

1/2

模型

2003

年,清華大學(xué)結(jié)構(gòu)實(shí)驗(yàn)室《CL

13

山東省工程建設(shè)地方標(biāo)準(zhǔn)《CL

四川省工程建設(shè)地方標(biāo)準(zhǔn)《CL

四川省工程建設(shè)地方標(biāo)準(zhǔn)《CL

DB

山西省工程建設(shè)地方標(biāo)準(zhǔn)《CL

遼寧省工程建設(shè)地方標(biāo)準(zhǔn)《CL

10

河南省工程建設(shè)地方標(biāo)準(zhǔn)《CL

11

黑龍江省工程建設(shè)標(biāo)準(zhǔn)《復(fù)合輕型剪力墻(CL

結(jié)構(gòu))體系技術(shù)規(guī)程》DB

12

內(nèi)蒙古自治區(qū)工程建設(shè)標(biāo)準(zhǔn)《CL

結(jié)構(gòu)體系技術(shù)規(guī)程》DBJ

13

DBJT

14

青海省工程建設(shè)地方標(biāo)準(zhǔn)《鋼筋混凝土復(fù)合墻體低層建筑技術(shù)規(guī)程》DB

有限公司所有,使用授權(quán)許可應(yīng)與之聯(lián)系(河北省石家莊市廣安大街美東國(guó)際

1308,郵編

050011,

2.1

CL

網(wǎng)架板是一種工廠化定制生產(chǎn)的立體空間鋼筋焊接板式網(wǎng)架,中間夾以各種保溫層。其與普通的“鋼絲網(wǎng)架聚苯乙烯夾芯板”的主要區(qū)別在于:1、CL

網(wǎng)架板的大部分鋼筋為受力鋼筋,故焊網(wǎng)的規(guī)格變化較多且對(duì)鋼筋直徑、材質(zhì)的要求更加嚴(yán)格;2、為保證網(wǎng)架的整體性,腹筋為三維體系交叉且直徑、間距等要求更加嚴(yán)格;保溫板的種類、材質(zhì)不僅僅局限于

EPS

板;4、工廠生產(chǎn)為了和結(jié)構(gòu)鋼筋要求相一

CL

網(wǎng)架板兩側(cè)混凝土有多種澆筑方式,如一側(cè)提前預(yù)制另一側(cè)安裝后支?,F(xiàn)澆、兩側(cè)同時(shí)支模澆59

本規(guī)程規(guī)定

CL

本規(guī)程規(guī)定

CL

網(wǎng)架板鋼筋焊接網(wǎng)的材質(zhì)優(yōu)先采用冷拔光面鋼筋

CPB550(φ

CL

復(fù)合筑或無模噴射、一側(cè)無模噴射另一側(cè)支模澆筑等。CL

預(yù)制板是

CL

網(wǎng)架板在安裝前,提前將較薄側(cè)混凝土

CL

CL

土建筑物震害調(diào)查表明:縱、橫向都有混凝土墻體,且壁率大于

100cm2/m2的建筑物無震害。

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論