




版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、GP-5 December, 2001 Edition,Purpose:Train Supplier personnel on changes to GP-5/GQTS Process:Explanation of GP-5 enhancements and screen shots of GQTS enhancements Product:Understanding of process and system enhancements,Overview of changes made to the procedure Overview of PRR System Changes in GQT
2、S Description of GM SupplyPower GP-5 folder,What does this GP-5 Training Include?,Changes to GP-5,Control and Rework Company A company approved by General Motors to perform controlled shipping level 2 inspections or other work necessary to ensure product quality. This company performs directly under
3、 the responsibility of the supplier. Line Accumulations Line accumulations are defined as unavoidable discrepancies or single cases of commodities where only initial response is needed. These PRRs will be issued on a monthly basis per part or part group.,Definitions added to GP-5,Quality Performance
4、 Reports Monthly 6 panel charts that graphically display the data contained in GQTS. Charts display the following: Major Disruptions (Spills, Downtime, Stockouts) PRRs Discrepant Parts PPM Sourcing Metrics Supplier evaluation system that ranks each supplier manufacturing location in terms of overall
5、 quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical commodity performance. (Example Enhanced Metric Bid List),Changes to GP-5,Definitions added to GP-5,Changes to GP-5,Packaging PRRs (section 4.2.2),Packaging PRR s are now defined as packaging
6、issues that cause part/specification nonconformity, or effect salability of the part. Examples: Damaged part or material that was inadequately secured in the container Container was inadequately secured in the carrier vehicle and caused part/material damage Container design and/or fabrication was in
7、adequate and caused part/material damage Container that has been damaged by improper handling and caused part/material damage Mixed pallets built incorrectly and caused part/material damage Parts not packaged to specification for service,Changes to GP-5,Line Accumulation PRRs (section 4.3),The Line
8、accumulation PRR should be entered in the system only after the full impact and the monthly quantity is available to the issuer. When it is appropriate for the plant, the PRR may be issued with the first occurrence of the discrepant part. Regular adjustments of the volume will then be made during th
9、e month. For awareness purposes, the issuer should indicate the possibility of adjustments when issuing the PRR.,Changes to GP-5,Problem Location and Direct Run Indicator (section 4.3.2),Issuer must indicate on the PRR where the problem was found. (Phase drop down box) Issuer must indicate on the PR
10、R if the issue affects Direct Run Rate. (Direct Run Rate check box),Changes to GP-5,Quantity Checked (section 4.3.6.2),The “1% or 30 pieces” requirement replaced by the following wording: “The quantity checked MUST be of a statistically significant size to represent the percentage defective within t
11、he batch.”,Changes to GP-5,Quantities for Label Issues (section 4.3.6.4),For parts shipped in bulk such as fasteners, labels, etc. (that are received in large quantities at manufacturing locations) mislabel problems will be counted using the following escalation process.,First labeling offense (at a
12、 particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the supplier (Quantity nonconforming and estimated quantity nonconforming = 1) Second offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the sup
13、plier (Quantity nonconforming and estimated quantity nonconforming = 1) The supplier will also be placed on Controlled Shipping Level 1. Third offense (at a particular Duns location, in last 15 months) Issuer counts all parts against the supplier. The supplier will also be placed on Controlled Shipp
14、ing Level 2.,Changes to GP-5,Quantities for Label Issues (example - section 8.4),A PRR is written to a supplier for mislabeling a pallet of ten boxes of screws, each box containing 1,000 screws. If this is the suppliers first labeling offense: Quantity Checked:1000 Quantity Nonconforming: 1 Quantity
15、 Suspect:1000 Est. Quantity Nonconforming: 1 If this is the suppliers second labeling offense: Quantity Checked:1000 Quantity Nonconforming: 1 Quantity Suspect:1000 Est. Quantity Nonconforming: 1 If this is the suppliers third labeling offense: Quantity Checked:1000 Quantity Nonconforming:1000 Quant
16、ity Suspect:1000 Est. Quantity Nonconforming:1000,Changes to GP-5,PRR Closure (section 4.3.8),A PRR is considered closed after the customer has moved the PRR from an “Open or “Rejected” status to an Approved status. A new status field is being added to GQTS.,Changes to GP-5,Timeliness of Final Respo
17、nse (section 4.4.5),Suppliers will be measured on the timeliness of their final response. The following timestamps will be captured in the database only Implemented date Approved date GM will use the timestamps to calculate the following metrics: Time to Implementation (Implementation date - Issue d
18、ate) Time to Closure (Approved Date - Issue date),Changes to GP-5,General Updates,New Business Hold added to procedure (section 6.0) Issues that affect multiple plants counted as only one major disruption,PRR System Changes in GQTS,PRR System Changes in GQTS,This will automatically classify the PRR
19、Record as both “Problem Identified” and “Implemented”.,Secondary Nonconformance is set as “Line Accumulation - Only Initial Response Required” Supplier has entered only the Initial response In Step 1: Initial Response, the Conforming Material Date field is set to the first day of the month following
20、 the current month. This field is set to this default value even if the supplier user had previously input a date to this field. In Step 3: Problem Identification and Action Plan, the following fields will be set (if the user entered a value for one of these fields, the user entered value will not b
21、e changed): Root Cause drop list field to the value Other. Corrective Action Implementation Date field to current system date. Date Changes to FMEA will be Complete field to current system date. Date Changes to Process Control Plan will be Complete field to current system date. In Step 4: Implementa
22、tion Process, text “Not Required” will be placed in the Institutionalized text area.,Line Accumulation PRRs,PRR System Changes in GQTS,Select a category,Phase box will no longer default to “ Production” Default will be “Select a Category” User must make a selection that represents where the problem was found.,PRR System Changes in GQTS,Customer Response added as Step 5 on Supplier Response page. - Radio button added for Status - Default value is Open - Field can be updated at any time by a GM user ID with PRR update privi
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 毀滅奪寶活動(dòng)方案
- 檢察演講活動(dòng)方案
- 歌廳點(diǎn)歌助興活動(dòng)方案
- 民兵宣傳活動(dòng)方案
- 水上飛人活動(dòng)方案
- 汽車(chē)開(kāi)業(yè)活動(dòng)方案
- 愛(ài)心教育課件
- 2025 年安全生產(chǎn)月活動(dòng)方案
- 愛(ài)黨愛(ài)國(guó)心理健康課件
- 科教協(xié)同視域下高校韌性治理機(jī)制研究
- 運(yùn)輸公司交通安全培訓(xùn)課件
- 2025年陜西省中考數(shù)學(xué)試題(解析版)
- 《康復(fù)治療學(xué)專(zhuān)業(yè)畢業(yè)實(shí)習(xí)》教學(xué)大綱
- 北師大版7年級(jí)數(shù)學(xué)下冊(cè)期末真題專(zhuān)項(xiàng)練習(xí) 03 計(jì)算題(含答案)
- 職業(yè)衛(wèi)生管理制度和操作規(guī)程標(biāo)準(zhǔn)版
- 小學(xué)信息技術(shù)四年級(jí)下冊(cè)教案(全冊(cè))
- 河道保潔船管理制度
- 【增程式電動(dòng)拖拉機(jī)驅(qū)動(dòng)系統(tǒng)總體設(shè)計(jì)方案計(jì)算1900字】
- 國(guó)家開(kāi)放大學(xué)行管專(zhuān)科《監(jiān)督學(xué)》期末紙質(zhì)考試總題庫(kù)2025春期版
- 高中家長(zhǎng)會(huì) 共筑夢(mèng)想,攜手未來(lái)課件-高二下學(xué)期期末家長(zhǎng)會(huì)
- 世界電網(wǎng)頻率及電壓
評(píng)論
0/150
提交評(píng)論