版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、NPI PROGRAM MANAGEMENT 新產(chǎn)品導(dǎo)入程序管理,INDEX,Introduction for NPI,The Focus for NPI,What is customers most concern during NPI process?,NPI Process,NPI is becoming more and more important in most manufacturing companies. It is the first step to win customer confidence on both production capability and busi
2、ness management.,Introduction,Full Name of NPI: New Product Introduction,CONTENT,NPI locates between design and mass production and it is a verifying process to product design and production.,How to get profit from the NPI business;,The Focus for NPI,Standing as manufacturing service provider, we ne
3、ed focus on followings:,How to manage the NPI business;,How to come out a proper NPI report to customer to get customer approval;,How to transfer the NPI to factory to implement mass production smoothly;,For the supplier: a Quality b Capacity,What is customers most concern during NPI process?,For th
4、e product: a Enough training to operators and engineers b Product requirement are clear and implemented solidly c Process setup adequately d Process evaluation is ready,-The practice and lesson learnt in NPI phase are most important as customer is prefer to solve all problems which are related to de
5、sign and system fault at this phase, not mass production phase.,Pre-study Phase,NPI Process,Planning Phase,Execution Phase,Trial-run Phase,Ramp-up Phase,Transfer Phase,Pre-study Phase,-Sales manager will call related people to review the sales offer, forecast, project budget and agreement.At the sam
6、e time,product engineers need to ask for the informations such as product specifics and production requirement from PM or customer to know the prouct in advance.,Planning Phase,-This phase is very important to whole program. PM should have a detailed list to review one by one to ensure all informati
7、on are ready and all plan have responsible people and deadline.,a Project milestone(Schedule) b Project organization(Team) -Process Engineer/SMT Engineer/Diagnostic Engineer/Quality Engineer/Program Manager / Sales/Buyer/Planner/PDM(product document manager)/Finance etc. c Investment plan -PM or hig
8、her hierarchy to define the investment. The investment includes equipment cost, tooling & jig & fixture cost, training cost and renovation cost. Most cost has been put into quotation and now we need control it by items.,d Facility plan. PM should call production manager, WH manager, facility manager
9、 to define the location: -which SMT line can be adequate use? -where to allocate the production line? -where to store the finished goods ?,e Material management plan. -We need Material Manager to discuss the purchasing plan and delivery plan if consigned material there is. -This plan is very serious
10、 to make sure there is no material shortage. -Shortage is very easy occurred on three cases: single source DOS (days of supply) too long bad BOM usage For this case, we can use safe stock to control.,f Quality plan. -Quality dept. should provide quality control plan, sub-supplier management plan, FM
11、EA, environment report (if applicable).,g Manufacturing plan: -Production manager should report the manpower allocation and make the training plan to operators. -IE should finished the layout plan and standard time calculation, based on the volume, shift arrangement, operator quantity, line layout,
12、tooling & equipment balance, technical people support. -Test engineer should also feedback the running status to PM. h Risk management plan: -Not all potential problems would occur, but if occur, some plan and work may going to “death”.,i ECR/ECO plan: -PDM and product engineer should control this p
13、lan. PM have to concern about once the engineering change would cause cost change. So, to define an ECR/ECO handling procedure and cost control process are necessary.,j CPM analysis and back-up solution consideration: -CPM:Critical Path Method -When all plans were ready, PM should have a review to a
14、ll these activities as a by-stage come-out. We title the review meeting as “planning review” or “start-up review”. The purpose is to make sure all activities are under control and running as what we expected.,-Following here are some Items which are critical and need high attention in the review mee
15、ting:,General Information: -customer milestone -capacity -volume -dedicated project personnel Supply Chain Management: -the focus is on procurement management and component coding (or BOM coding). Before the meeting, Material people should review the BOM and check out which ones are critical compone
16、nts. The critical component mainly means supplier-controlled market and/or high-value unique component.,Production Line Setting: -SMT package (Gerber, X-Y, PCN drawing) -assembly process -packing requirement (domestic and export) -traceability -testing software and hardware -tooling preparation -del
17、ivery method -cosmetic specification and checking method -plant layout -operator training and shift arrangement,Quality: -control plan and flow chart, -environment audit -process audit -GR&R -golden sample -trial run premises -process qualification requirement Other Problem: -finance -logistics -sec
18、urity,Execution phase,As soon as customer gives go signal, the NPI is promoted into “executive phase” and a checklist need to be made.,Production documents:,a Process Flow-chart b SOP (or MI/WI) c Test Instruction d Final Inspection Instruction e Packing Design and Instruction.,a PFMEA b Control Pla
19、n c GR&R d Capability Study e PQP Plan.,Production documents:,AVL(AML) and BOM:,Customer Specification & Golden Sample (if applicable):,a Make sure the latest quality and product specification was got, and renewal of test software. b Quality engineer should transfer the specification into internal f
20、ormat. c Testing engineer should have a software upgrade list. d Final Inspection Instruction. e Different document version may be applied to different product version.,CapEx: -Check that approved CapEx is available.,Trial-run Phase,-Customer released formal PO# and confirmed price, we start trial r
21、un. The output is trial run report from engineer team. The result is trial run sample approved by customer and give ramp-up signal. -The trial run report should cover the processes from SMT to packing and shipment. We should raise action plan for all critical problems and potentials necessarily. Aft
22、er trial run, sample would be sent to customer based on request.,-After trial run, sample would be sent to customer based on request. -In most cases, the whole NPI can be lengthened or shortened due to many factors, and it is also naturally have direct correlation to customer demand.,functionality,c
23、omplexity,requirement,predicted volume,There are 4 basic factors:,Ramp-up Phase,-The trial run sample was approved by customer and “go-signal” was released, it means we can move to “ramp-up phase” successfully. -This is the final phase for NPI. We must check what is lost or need further improvement
24、for factory production. -In fact, customer would give updated forecast and MRP plan now.Planner can make production schedule based on that.,Transfer Phase,-When customer approved the Ramp-up plan, NPI PM has to call a meeting with factory steering to transfer the project and report to customer about the transfer. -prepare a completed NPI report to factory members to make the transfer successful. - KPI (Key Performance Indicators) KPI
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 主播經(jīng)紀(jì)人合同完整版
- 二零二五版電子商務(wù)平臺(tái)運(yùn)營(yíng)授權(quán)協(xié)議3篇
- 2025年新工程施工合同范本:光伏發(fā)電站建設(shè)項(xiàng)目施工協(xié)議
- 2025年度家具制造委托加工合同樣本4篇
- 2025版零星維修與設(shè)備租賃一體化服務(wù)合同4篇
- 2025年度測(cè)量?jī)x器銷售與技術(shù)培訓(xùn)一體化合同4篇
- 《分?jǐn)?shù)的初步認(rèn)識(shí)(一)》(2課時(shí))(說(shuō)課稿)-2024-2025學(xué)年三年級(jí)上冊(cè)數(shù)學(xué)蘇教版
- 專業(yè)2024年代工生產(chǎn)協(xié)議范本版A版
- 2024版鐵路交通安全保障合同版B版
- 二零二五年度智能電網(wǎng)設(shè)備采購(gòu)供應(yīng)商技術(shù)服務(wù)合同3篇
- 帶狀皰疹護(hù)理查房課件整理
- 年月江西省南昌市某綜合樓工程造價(jià)指標(biāo)及
- 奧氏體型不銹鋼-敏化處理
- 作物栽培學(xué)課件棉花
- 交通信號(hào)控制系統(tǒng)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表
- 弱電施工驗(yàn)收表模板
- 絕對(duì)成交課件
- 探究基坑PC工法組合鋼管樁關(guān)鍵施工技術(shù)
- 國(guó)名、語(yǔ)言、人民、首都英文-及各地區(qū)國(guó)家英文名
- API SPEC 5DP-2020鉆桿規(guī)范
- 組合式塔吊基礎(chǔ)施工專項(xiàng)方案(117頁(yè))
評(píng)論
0/150
提交評(píng)論