




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、COCOMO SCORMInteractive Courseware Project Cost Modeling,Roger Smith & Lacey Edwards SPARTA Inc. Orlando, Florida and Lacey.E,COCOMO-SCORM Project: Proposed Solution,“Every complex project requires project managers and sponsors to calculate the expected level of effort, duration, and cost of the pro
2、ject. Developing web-based content to the Sharable Content Object Reference Model (SCORM) is complex enough that an algorithm is necessary to assist both the government and developers in estimating the size of the project. SPARTA and Anteon propose to create an interactive courseware estimation tool
3、 based on widely used Instructional Systems Design (ISD) methodologies and on the principles contained in the well-established and widely accepted COCOMO II model for software project estimation.”,Proposed Technical Concept:,Interactive Courseware Estimation Tool,Development and Test Cost Estimates,
4、COCOMO ISD,Project Description,Create an interactive project estimation tool for ISD/SCORM content Algorithmic foundation for the tool is the COCOMO II algorithm developed for software projects by the research team at the University of Southern California and led by Barry Boehm ISD methodology estim
5、ated will be the ADDIE model developed at Florida State University and adopted by the U.S. Armed Services Resulting algorithm and tools will estimate the person-months required to create a SCORM conformant learning product Dollar costs can be derived outside of the model by applying industry or spec
6、ific company labor rates,COCOMO Model Family,COQUALMO 1998,COCOMO 81 1981,COPROMO 1998,COSoSIMO 2004,Legend: Model has been calibrated with historical project data and expert (Delphi) data Model is derived from COCOMO II Model has been calibrated with expert (Delphi) data,COCOTS 2000,COSYSMO 2002,CO
7、RADMO 1999,iDAVE 2003,COPLIMO 2003,COPSEMO 1998,COCOMO II 2000,DBA COCOMO 2004,COINCOMO 2004,Security Extension 2004,Costing Secure System 2004,Software Cost Models,Software Extensions,Other Independent Estimation Models,Dates indicate the time that the first paper was published for the model,COCOMO
8、 II Tool Example,Users Perspective,COCOMO II Modeling Methodology,ADDIE Process,Job/Task Analysis Needs Analysis Learning Analysis Situation Analysis Technical Analysis,Design Plan Instructional Media Design Report SCORM Plan,Storyboards Programming Multimedia Testing,Trials Pilot tests,Reliability
9、Validation Training Plan,COSCOMO Drivers(27 Input Variables),Size Source Lines of Code (SLOC) Design Modification (DM) Code Modification (CM) Integration (IM) Assessment (AA) Understanding (SU) Unfamiliarity (UNFAM) Scale Drivers Development Flexibility (FLEX) Process Maturity (PMAT) Precedentedness
10、 (PREC) Arch/Risk Resolution (RESL) Team Cohesion (TEAM) Product Effort Multipliers (EM) Required Reliability (RELY) Product Complexity (CPLX) Required Reuse (RUSE) Documentation (DOCU),Platform EM Platform Volatility (PVOL) Bandwidth (BAND) Personnel EM Senior Capability (SCAP) Developer Capability
11、 (DCAP) Personnel Continuity (PCON) Applications Experience (APEX) Platform Experience (PLEX) Development Tools Experience (DTEX) Project EM Lifecycle Tools (LIFE) Multisite Development (SITE) Required Development Schedule (SCED),Quantitative Size Variables,EM Effect on Project,Course Hours,Project
12、Cost,15 Effort Multipliers Set to Nominal,Qualitative Project Variables,Nominal/Standard Levels,Effort Multipliers,Scale Drivers,EM Effect on Project,Course Hours,Nom. Cost,15 Effort Multipliers Other Than Nominal,Est. Cost,Data Collection Form,(see Excel file for entire form),COSCOMO Estimates,* Su
13、rvey was not completed. All remaining variables were estimated.,Defense Nuclear Weapons School,Building PRED(30) for COSCOMO,0%,% Variance of Estimated Value,-30%,+30%,Total Project Cost (PM),DNWS -3.8%,EHA -20%,ALC +333%,6,24,78,Reliability = PRED(30),Reliability of COCOMO family of models is often
14、 measured by the percentage of test cases that it will estimate within 30% of the actual project costs e.g. If a project requires 300 person-months to complete, then its PRED(30) range would be (210 to 390) If the model estimates 70% of its test cases within this range then the models PRED(30) = 70%
15、 COCOMO Family Model Levels COCOMO II: PRED(30) = 64% COSYSMO: PRED(30) = 56% COSCOMO: PRED(30) = unknown at this time,Delphi Calibration Survey,Using Delphi Method to gather independent opinions about the level of effort associated with each setting on each variable. Collect individual responses Ca
16、lculate group average Present averages to each person and allow them to change their responses if they would like Convene group work session to settle on acceptable values Round 1 of Delphi Conducted Via Private Survey Round 2 Conducted in Seminar Form,Conclusion,COCOMO II has been modified to inclu
17、de variables that are important to SCORM courseware developers Variable weights are being adjusted by Delphi surveys of experts Model is being calibrated through the collection of historical project information Current results show that this approach is feasible It is to early to determine the degree of success that
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 航空航天復(fù)合材料 課件知識(shí)點(diǎn)5 納米復(fù)合材料
- 書香家庭評(píng)比
- 新疆??瓶荚囋囶}及答案
- 機(jī)械考試題型及答案
- 2025年糖尿病護(hù)理查房
- 外科護(hù)理常規(guī)
- 中華文本庫護(hù)理應(yīng)急預(yù)案培訓(xùn)
- 肺炎病例分析護(hù)理
- 2025年中國牛奶咖啡起泡器行業(yè)市場全景分析及前景機(jī)遇研判報(bào)告
- 微球囊壓迫術(shù)護(hù)理查房
- 2025年中小學(xué)暑假安全教育主題家長會(huì) 課件
- 顱內(nèi)血腫護(hù)理查房
- 門診急救室管理制度
- 2025年沈陽水務(wù)集團(tuán)有限公司-企業(yè)報(bào)告(代理機(jī)構(gòu)版)
- 近視管理白皮書(2025)專家共識(shí)-
- 2024年深圳市深汕特別合作區(qū)農(nóng)村工作者招聘真題
- 數(shù)字化藝術(shù)-終結(jié)性考核-國開(SC)-參考資料
- 2024年貴州省糧食儲(chǔ)備集團(tuán)有限公司招聘考試真題
- 2025山西晉城市國有資本投資運(yùn)營有限公司部分子公司招聘11人筆試參考題庫附帶答案詳解
- 2025盤錦市興隆臺(tái)區(qū)輔警考試試卷真題
- 壓縮空氣儲(chǔ)能系統(tǒng)透平膨脹機(jī)流動(dòng)特性與損失優(yōu)化研究
評(píng)論
0/150
提交評(píng)論