



下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、Chapter 7CHANNEL ALIGNMENT7.1 GENERALTo minimize initial and maintenance dredging, the alignment of a nav- igation channel is usually designed to follow the course of the deeper channel in a river or estuary. Note, however, that there often are separate ood and ebb channels that may not be continuou
2、s. Although bends in the alignment should be minimized as much as possible, straight reaches with small curves may be needed to follow the natural deep water chan- nels in the estuary. Straight reaches between bends should be at least ve times the length of the longest vessel. Where gradual bends ar
3、e not prac- tical, cutoffs should be considered. Structures such as groins, revetments, and wave absorbers might be required to maintain acceptable channel alignment, channel dimensions, and wave conditions. Channel alignment that cuts across sandbars or mud bars shou1d be avoided unless train- ing
4、structures to control the movement and deposition of sediment are provided.7.2 VARIABLE ALIGNMENTThe strength of the hydraulic forces in the estuary will usually dic- tate channel alignment. Estuaries with high tide ranges and, therefore, strong ebb currents or large river discharges, normally will
5、have navi- gation channels with changing alignments. An example is Grays Harbor, Washington, which has high tides and a large tide prism, as shown in Figure 7-1.These systems may have channels that migrate, such as Grays Harbor, where the channel has migrated to a position adjacent to the South Jett
6、y (Figure 7-2). Normally, the ship channel alignment is adjusted over time to follow the natural channel migration.5758SHIP CHANNEL DESIGN AND OPERATIONNotes:Mean tide range 9.00 feet Maximum tide range 17.5 feet ship channel 26 miles longFIGURE 7-1. Variable Alignment Ship Channels (Adapted from AS
7、CEManual No 80).7.3 STRAIGHT ALIGNMENTStraight ship channels are possible when the hydraulic dynamics of the system are small. Projects in the Gulf of Mexico or South Atlantic coast have small tide ranges and, therefore, small tide prisms. The Gulf Coast not only has low tide ranges (1 to 3 ft) but
8、also has a tide cy- cle that is diurnal (i.e., one high and one low tide in a lunar day 24.84 hours). The East Coast has semidiurnal tides, which produce two nearly equal tide cycles in a lunar day. West Coat tides are mixed with two un- equal tide cycles a day. Therefore, channel tidal velocities a
9、re determined by the size of the tide prism and the number of tide cycles a day. Many of the Great Lakes ship channels have straight alignment because of the absence of tidal effects and because river discharges often are small. Fig- ure 7-3 shows an example of a straight ship-channel project in Mob
10、ile, Alabama.CHANNEL ALIGNMENT59FIGURE 7-2. Grays Harbor Channel Migration (Committee on Tidal Hydraulics, Corps of Engineers, 1995).7.4 PIANC METHODThe concept design guidance given in PIANC (1997) page 14follows.“Channel alignment should be assessed with regard to:the shortest channel length;condi
11、tions/basins, and so on, at either end of the channel;the need to avoid obstacles or areas of accretion, which are dif- cult or expensive to remove or require excessive (and, hence, costly) maintenance dredging;prevailing winds, currents, and waves; avoiding bends close to portentrances;the edge of
12、the channel should be such that ships passing along it do not cause disturbance or damage.60SHIP CHANNEL DESIGN AND OPERATIONFIGURE 7-3. Straight Ship Channel (From Lieutenant (jg) B. McCartney).Straight channel legs are preferable to curved ones. The designer should strive for an alignment consisti
13、ng of a series of straight legs connected by smooth bends, and not abrupt angles. Individual legs may have different widths and depths and should be navigated at different speeds.It is preferable to have the prevailing currents aligned with the channel to minimize cross currents and to avoid large g
14、radients inCHANNEL ALIGNMENTcross current along the channel. This also applies to wind and waves, although these may come from any direction. Usually, the prevailing wind and wave direction are considered in design, with a judgment on whether possible downtimes as a result of strong winds or high wa
15、ves from other directions are acceptable.Finally, it is advisable (and important in the case of channels navi- gated by ships carrying dangerous goods) that the channel be aligned to prevent the ship heading directly at the quay or jetty during its ap- proach. Any channel whose direction is perpendicular to the berthing face should be aligned to one side of the quay or jetty, so that a ship must turn (or be swung) to
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 云南省宣威市第十二中學2025屆高一下化學期末質(zhì)量跟蹤監(jiān)視試題含解析
- 湖北省高中聯(lián)考2025屆高二下化學期末預測試題含解析
- 2025年中國電子吊鉤稱行業(yè)市場全景評估及投資規(guī)劃建議報告
- 2023-2029年中國液態(tài)法白酒行業(yè)市場調(diào)查研究及發(fā)展戰(zhàn)略規(guī)劃報告
- 2025年投資項目總結(jié)評價報告
- 項目投資可行性研究報告5
- 2025-2030年中國不銹鋼泵頭項目投資可行性研究分析報告
- 【可行性報告】2025年離子注入設備相關(guān)項目可行性研究報告
- 中國云南省紅色旅游市場供需格局及未來發(fā)展趨勢報告
- 中國蜂鳴片行業(yè)投資研究分析及發(fā)展前景預測報告
- VMware數(shù)據(jù)中心的服務器虛擬化與運維管理解決方案
- 夫妻婚內(nèi)財產(chǎn)約定協(xié)議書范本(2025年)
- 2025年中醫(yī)師承合同范本文字
- 2025年牢牢堅守廉潔與廉政職業(yè)底線專題課件
- 0-3歲嬰幼兒感覺統(tǒng)合訓練知到智慧樹章節(jié)測試課后答案2024年秋杭州師范大學
- 抑酸藥課件教學課件
- 期末模擬卷 2024-2025學年人教版數(shù)學六年級上冊(含答案)
- 腦干神經(jīng)環(huán)路對意識的調(diào)控機制解析
- 動火作業(yè)應急預案樣本(4篇)
- Unit 4 Plants around us(說課稿)-2024-2025學年人教PEP版(2024)英語三年級上冊
- 2024集裝箱儲能系統(tǒng)測試大綱
評論
0/150
提交評論